Permanent Occupancy | | | 7/3/2018 | | DONE |
|
|
|
|
BLD-Final | 6/28/2018 | 6/29/2018 | 6/29/2018 | A | PASS |
Jim Sly
|
|
|
looks like everyone has signed off but you only have a partial final OK for perm Occ.
|
Zoning Approval | 6/28/2018 | 6/28/2018 | 6/28/2018 | | DONE |
Andrea Tuning
|
|
|
|
Telephone call | | | 6/26/2018 | | DONE |
|
|
|
called Brian to let know temp c of o expires at the end of June-he thinks everything has been finaled-he'll check on his end and call back-all subs are finaled-this is what the building final notes said-(OK for Perm. Occ. When Electr, Mech, Plumb and Zoning signs for Perm Occ.) need sign off card
|
BLD-Aging Inspection | 4/17/2018 | 4/17/2018 | 4/23/2018 | | CANC |
Jim Sly
|
|
|
|
Temporary Occupancy | 4/10/2018 | 7/9/2018 | 4/10/2018 | | DONE |
Candy A. Nichols
|
|
|
Jason ok'd 90 day ext from 4/1/18-kChristina said it was ok to extend even if the bond was expired
|
Telephone call | | | 4/6/2018 | | DONE |
|
|
|
called-talked to Brian-he's going to email Jason Blais for an estension on a temp c of o
|
BLD-Aging Inspection | 2/14/2018 | 2/14/2018 | 2/15/2018 | | DONE |
Brandon Shaw
|
|
|
Work in progress
|
Temporary Occupancy | 12/27/2017 | 3/27/2018 | 12/27/2017 | | PASS |
Candy A. Nichols
|
|
|
|
Meeting | | | 12/27/2017 | | DONE |
|
|
|
as per Jason Blais-request for extension granted good through 4/1/18
|
BLD-Final | 12/4/2017 | 12/4/2017 | 12/4/2017 | A | PART |
Jim Sly
|
|
|
Late Morning Please. Phone #: ###-#### Inspection requested via web by Michael West OK for Temp. Occ. OK for Perm. Occ. When Electr, Mech, Plumb and Zoning signs for Perm Occ.
|
FIRE-Final Inspection | 12/4/2017 | 12/4/2017 | 12/4/2017 | A | PASS |
Jim Page
|
|
|
Building 2 fire sprinkler inspection complete, building 2 fire alarm inspection complete, fire extinguishers are in place with current inspection tags, knox box is located by main entry. Final life fire safety inspection for buidling 2 passed/complete.
|
Temporary Occupancy | 12/4/2017 | 3/4/2018 | 12/4/2017 | | DONE |
Christina Prado
|
|
|
|
FIRE-Final Inspection | 11/30/2017 | 12/1/2017 | 12/1/2017 | A | FAIL |
Jim Page
|
|
|
Fire alarm modifications not completed at time of inspection, life fire safety inspection stopped.
|
FIRE-Alarm Testing | 11/30/2017 | 12/1/2017 | 12/1/2017 | A | CANC |
Jim Page
|
|
|
Fire alarm testing/inspection is to be requested by the installing contractor under the associated FIR permit, this request is cancelled.
|
Zoning Approval Temp | 12/1/2017 | 12/1/2017 | 12/1/2017 | | DONE |
Andrea Tuning
|
|
|
|
FIRE-Final Inspection | 11/30/2017 | 11/30/2017 | 11/30/2017 | A | FAIL |
Jim Page
|
|
|
Need 18 inches of clearance from bottom of fire sprinkler deflector to top of storage (closets and pantries are the main issue). No exterior signage for roof access or fire sprinkler riser room. Provide emergency lighting for exit discharge landings. FIR permits for both fire sprinkler and fire alarm need to be finaled before life fire safety inspection can be completed.
|
BLD-Final | 11/30/2017 | 11/30/2017 | 11/30/2017 | A | PEND |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Michael West Pre-inspection....walk thru.
|
BLD-Ceiling Grid Inspection | 11/10/2017 | 11/13/2017 | 11/13/2017 | A | PASS |
Jim Sly
|
|
|
Level 5 and Level 4 Phone #: ###-#### Inspection requested via web by Michael West
|
BLD-Framing/Rough-in | 11/3/2017 | 11/3/2017 | 11/3/2017 | P | PART |
Brandon Shaw
|
|
|
Level 1 elevator lobby.
OK to cover
|
BLD-Framing/Rough-in | 9/21/2017 | 9/22/2017 | 9/22/2017 | A | PASS |
Jim Sly
|
|
|
Units 211-220 drop ceilings Phone #: ###-#### Inspection requested via web by Michael West
|
BLD-Framing/Rough-in | 9/18/2017 | 9/19/2017 | 9/19/2017 | A | PASS |
Jim Sly
|
|
|
Elevator lobby ceilings at levels 2 and 3. Phone #: ###-#### Inspection requested via web by Michael West
|
BLD-Framing/Rough-in | 9/5/2017 | 9/6/2017 | 9/6/2017 | A | PASS |
Jim Sly
|
|
|
Units 311-320 Drop Ceilings Ready to cover. Phone #: ###-#### Inspection requested via web by Michael West
|
BLD-Framing/Rough-in | 9/1/2017 | 9/1/2017 | 9/1/2017 | P | NR |
Jim Sly
|
|
|
Units 311-320 Drop Ceilings and Soffits Phone #: ###-#### Inspection requested via web by Michael West
|
BLD-Framing/Rough-in | 8/24/2017 | 8/24/2017 | 8/24/2017 | P | PASS |
Jim Sly
|
|
|
Units 411-420 soffits and drop ceilings Phone #: ###-#### Inspection requested via web by Michael West
|
BLD-Framing/Rough-in | 8/16/2017 | 8/16/2017 | 8/17/2017 | P | PASS |
Jim Sly
|
|
|
Units 511-520 Soffits and drop ceilings Phone #: ###-#### Inspection requested via web by Michael West
|
BLD-Framing/Rough-in | 8/14/2017 | 8/14/2017 | 8/14/2017 | P | NR |
Jim Sly
|
|
|
Units 511-520 Soffits and Drops to cover with gyp-board. Phone #: ###-#### Inspection requested via web by Michael West
|
BLD-Framing/Rough-in | 7/18/2017 | 7/19/2017 | 7/19/2017 | A | PASS |
Jim Sly
|
|
|
Units 201-210 Phone #: ###-#### Inspection requested via web by Michael West
|
BLD-Conference | 7/18/2017 | 7/18/2017 | 7/18/2017 | P | CANC |
Jim Sly
|
|
|
|
BLD-Framing/Rough-in | 7/14/2017 | 7/14/2017 | 7/17/2017 | P | PART |
Brandon Shaw
|
|
|
Level 3 drop ceilings Phone #: ###-#### Inspection requested via web by Michael West
|
BLD-Energy code compliance | 6/29/2017 | 6/29/2017 | 6/29/2017 | P | PASS |
Jim Sly
|
|
|
Mike West Phone #: ###-####
|
BLD-Energy code compliance | 6/29/2017 | 6/29/2017 | 6/29/2017 | A | PART |
Brandon Shaw
|
|
|
Units 411-420 insulation
|
BLD-Framing/Rough-in | 6/21/2017 | 6/21/2017 | 6/21/2017 | P | PART |
Brandon Shaw
|
|
|
Units 511-520 Framing Phone #: ###-#### Inspection requested via web by Michael West Units 511-520
|
CHANGE STATUS TO (ISS) | | | 6/12/2017 | | DONE |
Christina Prado
|
|
|
Change status to reflect current, cannot see reason for project being under review, no tasks show review
|
BLD-Framing/Rough-in | 6/7/2017 | 6/7/2017 | 6/7/2017 | P | PART |
Jim Sly
|
|
|
Mike Phone #: ###-#### 3rd level OK.
|
BLD-Framing/Rough-in | 6/1/2017 | 6/2/2017 | 6/2/2017 | A | PASS |
Jim Sly
|
|
|
UNits 211- thru 220 - Mike Phone #: ###-####
|
Routing - Design Review | 6/1/2017 | | 6/1/2017 | | PASS |
Katelyn Menuge
|
|
|
DRH16-00498-Window Trim Modification Okay
|
BLD-Framing/Rough-in | 5/31/2017 | 5/31/2017 | 5/31/2017 | P | NR |
Jim Sly
|
|
|
Units 211-220 ready to insulate. Phone #: ###-#### Inspection requested via web by Michael West Electr. needs to complete firestopping.
|
BLD-Energy code compliance | 4/28/2017 | 5/1/2017 | 5/1/2017 | A | PASS |
Jim Sly
|
|
|
Level 3 units 301-310 Insulation ready for GWB install. Phone #: ###-#### Inspection requested via web by Michael West
|
BLD-Framing/Rough-in | 4/25/2017 | 4/25/2017 | 4/25/2017 | P | PART |
Jim Sly
|
|
|
Units 301-310 Ready to insulate. Phone #: ###-#### Inspection requested via web by Michael West
|
BLD-Framing/Rough-in | 4/18/2017 | 4/18/2017 | 4/18/2017 | P | PASS |
Jim Sly
|
|
|
Level 4 units 401-410 framing. Phone #: ###-#### Inspection requested via web by Michael West
|
BLD-Wall cover | 4/13/2017 | 4/13/2017 | 4/13/2017 | P | PASS |
Jim Sly
|
|
|
Units 501-510 Insulation Phone #: ###-#### Inspection requested via web by Michael West
|
BLD-Framing/Rough-in | 4/4/2017 | 4/5/2017 | 4/5/2017 | A | PART |
Jim Sly
|
|
|
Level 5 units 501-510 Framing for insulation to start Phone #: ###-#### Inspection requested via web by Michael West
|
BLD-Framing/Rough-in | 3/2/2017 | 3/2/2017 | 3/2/2017 | A | PART |
Jim Sly
|
|
|
Pre-rock corridor ceilings and 4'' down the wall at levels 2,3,4 and 5 West half of building. Phone #: ###-#### Inspection requested via web by Michael West OK
|
BLD-Framing/Rough-in | 2/28/2017 | 2/28/2017 | 2/28/2017 | P | PART |
Jim Sly
|
|
|
Pre-rock at tubs for units 501-510 and 401-410. Phone #: ###-#### Inspection requested via web by Michael West
|
BLD-Wall Bracing | 2/17/2017 | 2/21/2017 | 2/21/2017 | A | PART |
Mike Jordan
|
|
|
Shear walls Units401-410 Phone #: ###-#### Inspection requested via web by Michael West. Interior shear walls for corrido walls at first floor. Nailing ok. Needs to install holdowns.
|
BLD-Framing/Rough-in | 2/15/2017 | 2/16/2017 | 2/16/2017 | A | PART |
Jim Sly
|
|
|
Roof sheathing and level 5 units 501-510 shearwall nailing. Phone #: ###-#### Inspection requested via web by Michael West OK pending MTI special inspections, tests and approvals.
|
BLD-Conference | 2/13/2017 | 2/14/2017 | 2/15/2017 | A | PEND |
Bob Archibald
|
|
|
Requesting an inspection to clarify whether the use of a generator for elevator operation in the event of a power failure is required, or if a battery backup lowering function is sufficient to meet code. Phone #: ###-#### Inspection requested via web by Michael West. Backup Power question under review.
|
BLD-Conference | 1/27/2017 | 1/31/2017 | 2/13/2017 | A | NR |
Dave Hannah
|
|
|
Consultation to discuss inspections as we move into the framing and finishes stages. Phone #: ###-#### Inspection requested via web by Michael West
|
BLD-Conference | 12/13/2016 | 12/13/2016 | 12/13/2016 | P | DONE |
Phil Shearer
|
|
|
Phone #: 8013815319 >> Inspection requested via mobile web by Mike west
|
Place hold on job | 8/11/2016 | | 8/16/2016 | | DONE |
Kristal Soland
|
|
|
DO NOT ISSUE WITHOUT BLD16-01058 TO BLD16-01060
|
Issue PAID IN FULL permit | | | 8/16/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/16/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 7/19/2016 | | |
|
|
|
|
Permit Ready to Issue | | | 7/19/2016 | | DONE |
Christina Prado
|
|
|
***ALL MET 8-11-16*** Need RP
**MET 8-10** ACHD, GC Form & Revised Certificate of Value for issuance
DO NOT ISSUE WITHOUT ALL 3 PERMITS - BLD16-01058, 01059 & 01060
|
Plan resubmittals received | | | 7/18/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/18/2016 | | 7/18/2016 | | PASS |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/18/2016 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 4/8/2016 | | 7/18/2016 | | PASS |
Tim L. Woodard
|
|
|
2nd review completed.
|
Routing - PLAN CHECK | 5/31/2016 | | 7/5/2016 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing - MECHANICAL | 5/31/2016 | | 7/5/2016 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 5/31/2016 | | 7/5/2016 | | PASS |
Daryl Spivey
|
|
|
|
Routing Off Site - STRUCTURAL | 5/31/2016 | | 7/5/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Plan resubmittals received | | | 5/31/2016 | | DONE |
|
|
|
|
Route to Impact Fee Review | 5/13/2016 | 5/16/2016 | 5/13/2016 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLAN CHECK | 4/8/2016 | | 5/12/2016 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing - PLANNING Land Div | 4/8/2016 | | 5/12/2016 | | PASS |
Tim L. Woodard
|
|
|
Approved in E-Plan. TLW
|
Routing Off Site - STRUCTURAL | 4/8/2016 | | 5/12/2016 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing PW Drainage | 4/11/2016 | | 5/12/2016 | | PASS |
Brian Murphy
|
|
|
Approved in E-Plan. TLW
|
Routing PW Street Lights | 4/11/2016 | | 5/12/2016 | | PASS |
Tom Marshall
|
|
|
Approved in E-Plan. TLW
|
Routing PW Sewer Design | 4/11/2016 | | 5/12/2016 | | PASS |
Kyle S. Rosenmeyer
|
|
|
Approved in E-Plan. TLW
|
Routing PW Flood Plain | 4/11/2016 | | 5/12/2016 | | PASS |
Jim Wyllie
|
|
|
Approved in E-Plan. TLW
|
Routing PW Grading-Hillside | 4/11/2016 | | 5/12/2016 | | PASS |
Jim Wyllie
|
|
|
Approved in E-Plan. TLW
|
1st review completed | | | 5/12/2016 | | DONE |
|
|
|
|
Routing - Design Review | 4/8/2016 | | 4/20/2016 | | PASS |
Josh Wilson
|
|
|
|
Routing - MECHANICAL | 4/8/2016 | | 4/18/2016 | | FAIL |
Troy James
|
|
|
|
Routing - FIRE | 4/8/2016 | 4/8/2016 | 4/12/2016 | | PASS |
Katie Marron
|
|
|
Comments attached to case
|
Routing - PLUMBING | 4/8/2016 | | 4/11/2016 | | FAIL |
Daryl Spivey
|
|
|
see bld16-01058 for comments
|
Routing - PUBLIC WORKS | 4/8/2016 | | 4/11/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 4/8/2016 | | 4/11/2016 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and approval required prior to earth disturbance)
BUILDING #2: Arboretum at Barber Station is a 162 unit apartment complex consisting of 3 building on a 4.07 acre site. Buildings 1 & 2 are podium structures with 4 stories of apartments in Type 5A wood construction over 1 story of Type 1A post-tension concrete structure. Building 3 is a two story Type 5B wood construction with 1 level of apartment units over tenant amenities.
A separate structural podium permit application has been filed for Buildings 1 and 2.
|
Routing PW Solid Waste | 4/11/2016 | | 4/11/2016 | | PASS |
Megan Durrell
|
|
|
|
Routing - Addressing | 4/8/2016 | | 4/8/2016 | | PASS |
Laura Hunter
|
|
|
|
Intake Approval | | | 4/8/2016 | | PASS |
|
|
|
|
Application received | | | 3/31/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 31 2016 4:48PM
|
First Notice | | 7/13/2018 | | | |
|
|
|
|