Information based on query as of Friday, June 21, 2024.
Permit Information
Permit NumberBLD16-01092
StatusFinaled
Name ESI
Site Address 3575 W OVERLAND RD
Project NameBoise Fire Station #8
Customer Number 
ePlanReviewYes
Description
**Project Management-Ron Hill** **GREEN TAG EXPEDITED REVIEW – V4.00, SILVER CERTIFICATION, LEED** (CITY OF BOISE - Fire Station #8) Permit to construct a new 11,936 square foot fire station. This building is fire sprinklered for area increase and non-separated uses. This building utilizes enhanced lighting to comply with the 2012 IECC. Scope of work includes: construction of poured concrete foundation, construction of reinforced CMU exterior walls, construction of new steel bar-joist floor – ceiling framing / steel pan deck, [construction of interior nonbearing walls to create: 7 sleeping units, 5 restrooms / bathing rooms, lobby, three offices, work room, turn out room, decon room, maintenance shop, riser room, 3 storage rooms, laundry room, janitors closet, fitness room, kitchen, and dayroom], new elevator, new electrical, new plumbing, new mechanical, new interior / exterior finishes, new accessible doors / hardware, and related site work. This building is fully fire sprinklered for area increase. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Meeting  5/11/2018  
sent statement 5-14
Print Statement  5/11/2018 DONE
Print Statement  3/20/2018 DONE
Third Notice 2/17/20183/14/2018 DONE
Mailed 3-15-18
Second Notice 1/21/20182/12/2018 DONE
Mailed 2-13-18
First Notice 12/17/20171/11/2018 DONE
Mailed 1-12-18
Permanent Occupancy  12/7/2017 DONE
Print Occupancy Form  12/5/2017 DONE
DOC - Permit Finaled  11/6/2017 DONE
No outstanding permit issues all trades have been finaled. Ok for perm. occ.
Plan Reviewer's activity  11/3/2017 DONE
DetailsJason Blais
Received another Commissioning Report Summary updated on the project. A few remaining items being worked on but can be relsolved between the commissioning agent and the owner (City PW/Fire).
BLD-Final4/27/20174/28/20174/28/2017PPASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Kevin Honeycutt
FIRE-Final Inspection4/27/20174/28/20174/28/2017APASS
DetailsTroy Cobbley
Life safety passed
Zoning Approval4/28/20174/28/20174/28/2017 DONE
DetailsSarah Schafer
BLD-Final4/27/20174/27/20174/27/2017PPART
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Kevin Honeycutt 2nd floor tank handle
FIRE-Final Inspection4/26/20174/27/20174/27/2017ACANC
DetailsTroy Cobbley
still waiting for the fire alarm permit to be addressed
BLD-Final4/25/20174/26/20174/26/2017PNR
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Kevin Honeycutt
Need all Fire Inspections prior to calling for Structural final. Called Kevin......unable to leave V/M message.
FIRE-Final Inspection4/25/20174/26/20174/26/2017AFAIL
DetailsTroy Cobbley
Life safety will be ok to final when the project related fire sprinkler and fire alarm permits are passed.
PubWorks Occupancy Approval4/25/20174/25/20174/25/2017 DONE
DetailsTiffany Lowery
FIRE-Final Inspection4/21/20174/24/20174/24/2017PFAIL
DetailsTroy Cobbley
I went over life safety requirements with the project superintendant since alarms and sprinkler permits were not ready. There is a short list of corrections marked in red on the Fire Review Notes.
BLD-Ceiling Grid Inspection4/3/20174/4/20174/4/2017APASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Kevin Honeycutt
BLD-Ceiling Grid Inspection3/6/20173/7/20173/7/2017ANR
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Kevin Honeycutt
BLD-Framing/Rough-in1/31/20171/31/20171/31/2017PPASS
DetailsJim Storey
Level 2 framing inspection Phone #: ###-#### Inspection requested via web by Kevin Honeycutt
BLD-Wall cover1/23/20171/23/20171/23/2017PPASS
DetailsJim Storey
Ready whenever you can get here. AM ok if needed. Thanks Phone #: ###-#### Inspection requested via web by Kevin Honeycutt 1 st floor ok
BLD-Framing/Rough-in1/17/20171/17/20171/17/2017APART
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Kevin Honeycutt. 1st. floor interior steel stud framed walls and hardlids ok. Pending M.E.P inspections in the p.m.
BLD-Framing/Rough-in1/12/20171/13/20171/13/2017PCANC
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Kevin Honeycutt
BLD-Framing/Rough-in12/12/201612/12/201612/12/2016PPASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Kevin Honeycutt exterior ok
BLD-Framing/Rough-in11/21/201611/21/201611/21/2016PPASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Kevin Honeycutt sw first floor exterior ok to cover exterior
BLD-Conference10/3/201610/7/201610/7/2016APART
DetailsMike Jordan
12:30 grout. Strata onsite Phone #: ###-#### Inspection requested via web by Kevin Honeycutt.. Pending special inspection.
BLD-Conference10/3/201610/6/201610/6/2016APART
DetailsJim Sly
12:30 grout. Strata onsite Phone #: ###-#### Inspection requested via web by Kevin Honeycutt
OK pending STRATA special inspection, tests and approvals.
BLD-Conference10/3/201610/5/201610/5/2016APEND
DetailsPhil Shearer
12:30 grout. Strata onsite Phone #: ###-#### Inspection requested via web by Kevin Honeycutt
BLD-Conference10/3/201610/4/201610/4/2016APEND
DetailsMike Jordan
12:30 grout. Strata onsite Phone #: ###-#### Inspection requested via web by Kevin Honeycutt. Pending special inspection.
BLD-Conference9/30/201610/3/201610/3/2016APEND
DetailsMike Jordan
12:30 wall grout. Strata to be onsite Phone #: ###-#### Inspection requested via web by Kevin Honeycutt
BLD-Conference9/28/20169/30/20169/30/2016APEND
DetailsDave Hannah
12:30 grout. Strata to be onsite Phone #: ###-#### Inspection requested via web by Kevin Honeycutt ok after spec inspection signoff
BLD-Conference9/28/20169/29/20169/29/2016APASS
DetailsJim Sly
12:30 grout. Strata to be onsite Phone #: ###-#### Inspection requested via web by Kevin Honeycutt
OK pending STRATA special inspection, tests and approvals.
BLD-Conference9/27/20169/28/20169/28/2016APASS
DetailsJim Storey
12:30 wall grout. Strata will be onsite Phone #: ###-#### Inspection requested via web by Kevin Honeycutt placed w/si
BLD-Conference9/26/20169/26/20169/26/2016PPASS
DetailsJim Storey
Wall grout at 11AM. Strata and EOR to be onsite. Phone #: ###-#### Inspection requested via web by Kevin Honeycutt
BLD-Conference9/21/20169/21/20169/21/2016APASS
DetailsJim Storey
Wall grout at 11 AM. Strata will be onsite Phone #: ###-#### Inspection requested via web by Kevin Honeycutt si pending
BLD-Conference9/19/20169/20/20169/20/2016APASS
DetailsJim Storey
11 AM Grout. Strata will be onsite. Phone #: ###-#### Inspection requested via web by Kevin Honeycutt pwsi
BLD-Conference9/15/20169/16/20169/16/2016ADONE
DetailsJim Storey
11AM grout. Strata will be onsite Phone #: ###-#### Inspection requested via web by Kevin Honeycutt
BLD-Conference9/12/20169/14/20169/14/2016APART
DetailsJim Storey
Grout at 11 AM. Strata will be onsite. Phone #: ###-#### Inspection requested via web by Kevin Honeycutt placed wth si
BLD-Conference9/8/20169/13/20169/12/2016ACANC
DetailsJim Storey
11 AM grout scheduled Phone #: ###-#### >> Inspection requested via web by Kevin Honeycutt Inspection cancelled from web by: Kevin Honeycutt
BLD-Conference9/8/20169/9/20169/9/2016PPART
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Kevin Honeycutt cmu east wall 1st lift/ wip/ si pending
BLD-Foundation7/26/20167/27/20167/27/2016PPART
DetailsJim Storey
Site contact Ted Walker - ###-####
Inspection of footings prepared for concrete placement at Boise Fire Station #8. Concrete placement currently scheduled for Thursday (7/28/16) at 09:00 am. Phone #: ###-#### Inspection requested via web by Kevin Honeycutt
Place hold on job6/23/2016 6/30/2016 DONE
DetailsKristal Soland
Make sure Deom is FNL BLD16-01045
Issue PAID IN FULL permit  6/30/2016 DONE
Print Occupancy Form  6/30/2016 DONE
OVERRIDE  6/22/2016  
Routing - PLAN CHECK6/16/2016 6/22/2016 PASS
DetailsTim L. Woodard
Routing Off Site - STRUCTURAL6/16/2016 6/22/2016 PASS
DetailsTim L. Woodard
Uploaded approval sheet by Outsource in Documents folder of E-Plan. TLW
PLANS/APPL TAKEN TO FRONT DESK  6/22/2016 DONE
Permit Ready to Issue  6/22/2016 DONE
All requirements met 6/30/16 C_P
NEED ACHD ***MET** GC & rev cert of val and RP
Plan assigned to (TLW)4/18/2016 6/22/2016 PASS
DetailsTim L. Woodard
Routing PW Drainage6/16/2016 6/17/2016 PASS
DetailsBrian Murphy
Routing - PLUMBING6/16/2016 6/17/2016 PASS
DetailsDaryl Spivey
per plans and ISPC
Plan resubmittals received  6/16/2016 DONE
1st review completed  5/26/2016 DONE
Routing - PLAN CHECK4/18/2016 5/26/2016 FAIL
DetailsTim L. Woodard
Routing Off Site - STRUCTURAL4/18/2016 5/26/2016 FAIL
DetailsTim L. Woodard
Routing PW Street Lights4/18/2016 5/26/2016 PASS
DetailsTom Marshall
Approved in E-Plan Review. TLW
Routing PW Environmental4/18/2016 5/5/2016 PASS
DetailsRick Christenson
Routing - MECHANICAL4/18/2016 5/3/2016 PASS
DetailsTroy James
Green Building Review Required. TLW
Routing - Design Review4/18/2016 4/21/2016 PASS
DetailsJosh Wilson
Green Building Review ok per SMS.
Routing PW Drainage4/18/2016 4/21/2016 FAIL
DetailsBrian Murphy
needs city o and m agreement per D. Strickling
Routing - FIRE4/18/20164/18/20164/19/2016 PASS
DetailsKatie Marron
Comments attached to case.
Routing PW Solid Waste4/18/2016 4/19/2016 PASS
DetailsMegan Durrell
As designed this FS will be limited to a max of 4, 95 gallon wheeled carts for trash/recycling with no future option of a dumpster. It is preferred to design for the future/unknown.
Routing - Erosion and Sediment4/18/2016 4/19/2016 PASS
DetailsEvan Jenkins
(Site Prep inspection and approval required prior to earth disturbance)

**Project Management - Ron Hill** **GREEN TAG Expidited Review - GREEN BUILDING CODE**(CITY OF BOISE - Fire Station #8) Permit to construct a new 11,936 square foot 2 story fire station and related site work.
Routing - PLUMBING4/18/2016 4/19/2016 FAIL
DetailsDaryl Spivey
Green Building Review Required. TLW
change the FS-1 to a FS-2 and increase the waste line to a 4" to accept the discharge of the 1 1/2" RP on the non-potable water lne in room 107.
Routing - PLANNING Land Div4/18/2016 4/19/2016 PASS
DetailsTodd Tucker
Routing - Addressing4/18/2016 4/18/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS4/18/2016 4/18/2016 PASS
DetailsRachael Beierle
Green Building Review Required. TLW
Intake Approval  4/18/2016 PASS
Pending Assignment by TLW4/18/2016 4/18/2016 DONE
DetailsTim L. Woodard
Routing PW Sewer Design4/18/2016 4/18/2016 PASS
DetailsKyle S. Rosenmeyer
Application received  4/5/2016 DONE
Application submitted via PDS Online on Apr 5 2016 8:14AM