BLD-Final | 10/18/2016 | 10/19/2016 | 10/21/2016 | P | PASS |
Dave Hannah
|
|
|
Mike Phone #: ###-####
|
DOC - Permit Finaled | 10/21/2016 | 10/21/2016 | 10/21/2016 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 7/26/2016 | 7/27/2016 | 7/27/2016 | A | PASS |
Dave Hannah
|
|
|
Inspector: please call Robert Bruno @ ###-#### so he can meet/explain. This is a re-inspection. Phone #: ###-#### Inspection requested via web by Admin Assistant
|
BLD-Framing/Rough-in | 7/21/2016 | 7/22/2016 | 7/22/2016 | A | FAIL |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Admin Assistant. Header over window wrong size. 2PLY girder nailing, T5 truss missing brace.
|
BLD-Other | 6/16/2016 | 6/17/2016 | 6/17/2016 | P | PASS |
Dave Hannah
|
|
|
SHEAR inspection Phone #: ###-#### Inspection requested via web by Admin Assistant
|
BLD-Footing | 5/9/2016 | 5/10/2016 | 5/11/2016 | A | PASS |
Phil Shearer
|
|
|
would like call ahead; JR Phone #: ###-####
|
PubWorks Subgrade Approval | 5/10/2016 | 5/10/2016 | 5/10/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 5/6/2016 | 5/9/2016 | 5/9/2016 | A | CANC |
Dave Hannah
|
|
|
JR Phone #: ###-####
|
BLD-Footing | 5/3/2016 | 5/4/2016 | 5/6/2016 | A | CANC |
Dave Hannah
|
|
|
JR Phone #: ###-####
|
BLD-Footing | 5/4/2016 | 5/5/2016 | 5/5/2016 | A | NR |
Dave Hannah
|
|
|
JR-pour time 10:00 Phone #: ###-####
|
BLD-Footing | 5/2/2016 | 5/3/2016 | 5/3/2016 | A | NR |
Phil Shearer
|
|
|
JR Phone #: ###-####
|
OVERRIDE | | | 4/7/2016 | | |
|
|
|
|
Plan assigned to (DAF) | 4/7/2016 | 4/7/2016 | 4/7/2016 | | DONE |
David Ferguson
|
|
|
|
Routing - PLAN CHECK | 4/7/2016 | | 4/7/2016 | | PASS |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/7/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/7/2016 | | DONE |
|
|
|
all requirments met
|
Issue PAID IN FULL permit | | | 4/7/2016 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 4/6/2016 | | 4/6/2016 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and approval required prior to earth disturbance)
WUI Zone A - Scope of work is to build a new attached garage onto the existing garage. The new garage will be unconditioned space.
|
Routing Walk-In (PW Hillside) | 4/5/2016 | 4/5/2016 | 4/5/2016 | P | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Routing Walk-In (Zoning) | 4/5/2016 | 4/5/2016 | 4/5/2016 | A | PASS |
Colleen T Carroll
|
|
|
Driveway needs to be seperated by a 5' landscape buffer so it does not exceed 33' in front setback.
|
Routing Walk-In (BLD) | 4/5/2016 | 4/5/2016 | 4/5/2016 | P | FAIL |
David Ferguson
|
|
|
Need engineering for foundation and ESC approval from Evan and Hillside approval from Jason T.
|
1st review completed | | | 4/5/2016 | | FAIL |
David Ferguson
|
|
|
|
Case Summary (BLD) | | | 4/5/2016 | | DONE |
David Ferguson
|
|
|
|
Inspection Record Card- Bld | | | 4/5/2016 | | DONE |
|
|
|
|
Application received | | 4/5/2016 | | | |
|
|
|
|