BLD-Final | 5/20/2016 | 5/20/2016 | 5/20/2016 | P | PASS |
Mike Jordan
|
|
|
Please call ahead for access - Darrie Phone #: ###-####
|
DOC - Permit Finaled | 5/20/2016 | 5/20/2016 | 5/20/2016 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 4/27/2016 | 4/27/2016 | 4/27/2016 | P | PASS |
Mike Jordan
|
|
|
Bob Phone #: ###-####
|
BLD-Footing | 4/12/2016 | 4/13/2016 | 4/13/2016 | A | PASS |
Mike Jordan
|
|
|
Bob Phone #: ###-####. Footing and stemwall mono placement ok.
|
OVERRIDE | | | 4/7/2016 | | |
|
|
|
|
Routing Walk-In (BLD) | 4/7/2016 | 4/7/2016 | 4/7/2016 | A | DONE |
Brian McGowan
|
|
|
|
1st review completed | | | 4/7/2016 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 4/7/2016 | | 4/7/2016 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 4/7/2016 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 4/7/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/7/2016 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 4/7/2016 | | DONE |
|
|
|
all requirments met
|
Issue PAID IN FULL permit | | | 4/7/2016 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 4/6/2016 | 4/6/2016 | 4/6/2016 | P | DONE |
Leon Letson
|
|
|
|
Routing Walk-In (BLD) | 4/6/2016 | 4/6/2016 | 4/6/2016 | P | FAIL |
Javier Guzman
|
|
|
Need a floor plan of the existing house (1st and second floor, wall bracing details, header call outs, roof joist attachment details
|
CHANGE STATUS TO (REV) | | | 4/6/2016 | | DONE |
|
|
|
|
Application received | | 4/6/2016 | | | |
|
|
|
|