BLD-Final | 2/7/2017 | 2/8/2017 | 2/8/2017 | A | PASS |
Tony Young
|
|
|
Steve Phone #: ###-####
|
DOC - Permit Finaled | 2/8/2017 | 2/8/2017 | 2/8/2017 | P | PASS |
Tony Young
|
|
|
|
BLD-Aging Inspection | 1/12/2017 | 1/12/2017 | 1/17/2017 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 1/11/2017 | 1/11/2017 | 1/17/2017 | | PEND |
Tony Young
|
|
|
|
BLD-Framing/Rough-in | 8/30/2016 | 8/30/2016 | 8/30/2016 | P | PASS |
Tony Young
|
|
|
Steve Phone #: ###-####,, garage ok
|
BLD-Energy code compliance | 8/24/2016 | 8/25/2016 | 8/25/2016 | A | DONE |
Tony Young
|
|
|
Steve Phone #: ###-####
|
BLD-Energy code compliance | 8/23/2016 | 8/24/2016 | 8/24/2016 | P | PASS |
Tony Young
|
|
|
Steve-house Phone #: ###-####
|
BLD-Framing/Rough-in | 8/23/2016 | 8/24/2016 | 8/24/2016 | A | PASS |
Tony Young
|
|
|
Steve-house Phone #: ###-####
|
BLD-Framing/Rough-in | 8/22/2016 | 8/23/2016 | 8/23/2016 | P | PART |
Tony Young
|
|
|
Steve-house Phone #: ###-####,, ok pending mechanical
|
BLD-Wall Bracing | 8/22/2016 | 8/23/2016 | 8/23/2016 | P | PASS |
Tony Young
|
|
|
Steve-for the garage Phone #: ###-####,, garage ok
|
BLD-Wall Bracing | 8/5/2016 | 8/5/2016 | 8/5/2016 | P | PASS |
Tony Young
|
|
|
Steve Phone #: ###-####
|
BLD-Foundation | 8/1/2016 | 8/2/2016 | 8/2/2016 | A | DONE |
Tony Young
|
|
|
For the garage // Will Phone #: ###-####
|
BLD-Foundation | 8/1/2016 | 8/1/2016 | 8/1/2016 | P | DONE |
Tony Young
|
|
|
For the garage // Will Phone #: ###-####,, 316 did the footing inspection
|
BLD-Foundation | 6/27/2016 | 6/28/2016 | 6/28/2016 | P | PASS |
Phil Shearer
|
|
|
Matt Phone #: ###-####
|
BLD-Footing | 6/24/2016 | 6/27/2016 | 6/27/2016 | P | PART |
Tony Young
|
|
|
Matt Phone #: ###-####,, work in progress
|
Issue PAID IN FULL permit | | | 6/8/2016 | | DONE |
|
|
|
|
(F) Reprint permit | | | 6/8/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 6/3/2016 | | |
|
|
|
|
Plan assigned to (BJM) | 4/14/2016 | 4/14/2016 | 6/3/2016 | | DONE |
Brian McGowan
|
|
|
due 4/22 - FAILIED- No DR and plans need corrections 4-21-16
|
Routing - PLAN CHECK | 5/12/2016 | | 6/3/2016 | | PASS |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 6/3/2016 | | DONE |
|
|
|
|
Telephone call | | | 6/3/2016 | | DONE |
|
|
|
called Steve- left message that permit is ready and fees due
|
Case Summary (BLD) | | | 6/3/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/3/2016 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 6/3/2016 | | DONE |
|
|
|
Requirements Met
|
Routing - PLANNING | 5/26/2016 | | 5/26/2016 | | PASS |
Josh Wilson
|
|
|
Ok with redline- increase garage setback off alley to 10' 0".
|
Routing - MECHANICAL | 5/13/2016 | | 5/13/2016 | | PASS |
Troy James
|
|
|
|
Routing - MECHANICAL | 5/12/2016 | | 5/12/2016 | | FAIL |
Troy James
|
|
|
emailed air dynamics with correction
|
Plan resubmittals received | | | 5/5/2016 | | DONE |
|
|
|
Two sets of Sheets 1-10. Taken to Brian Mc
|
Plan resubmittals received | | | 4/29/2016 | | DONE |
|
|
|
One copy of Engineering and two copies of sheet 1-10. Taken to Brian Mc
|
1st review completed | | | 4/21/2016 | | FAIL |
Brian McGowan
|
|
|
Must submit for Design review. Tall wall engineering needed at exterior wall of stairs, egrees from Master Bedroom required, beam across front porch and wall bracing on front wall need to be reevaluated.
|
Routing - MECHANICAL | 4/11/2016 | | 4/19/2016 | | PASS |
Troy James
|
|
|
|
Plan assigned to (LEG) Tisha | 4/8/2016 | | 4/14/2016 | | DEFR |
Tisha Gallop
|
|
|
|
Routing - PLANNING | 4/11/2016 | | 4/11/2016 | | FAIL |
Josh Wilson
|
|
|
Will need Design Review for a Substandard Lot
|
Routing - Addressing | 4/8/2016 | | 4/11/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 4/11/2016 | | 4/11/2016 | | PASS |
Jennifer Bruner
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/8/2016 | | DONE |
|
|
|
|
Intake Approval | | | 4/8/2016 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/8/2016 | | DONE |
|
|
|
|
Application received | | 4/8/2016 | | | |
|
|
|
|
Routing - PLAN CHECK | 4/19/2016 | | | | FAIL |
Brian McGowan
|
|
|
Must submit for Design review. Tall wall engineering needed at exterior wall of stairs, egrees from Master Bedroom required, beam across front porch and wall bracing on front wall need to be reevaluated.
|