First Notice | | 7/2/2017 | 7/12/2017 | | DONE |
|
|
|
sent in mail 7-13-17
|
Print Occupancy Form | | | 6/22/2017 | | DONE |
|
|
|
|
Permanent Occupancy | | | 6/22/2017 | | DONE |
|
|
|
|
Second Notice | | 4/21/2017 | 4/21/2017 | | DONE |
|
|
|
This permit finaled on the web by John Rice
|
First Notice | 3/30/2017 | 3/30/2017 | 4/11/2017 | | DONE |
Jim Storey
|
|
|
Mailed 4-12-17
|
BLD-Aging Inspection | 3/29/2017 | 3/29/2017 | 3/30/2017 | | DONE |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 3/30/2017 | 3/30/2017 | 3/30/2017 | | DONE |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 3/30/2017 | 3/30/2017 | 3/30/2017 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 11/14/2016 | 11/15/2016 | 11/15/2016 | A | PASS |
Jim Storey
|
|
|
Call to meet ...... Brett Phone #: ###-#### no card on site for occ.
|
BLD-Final | 8/1/2016 | 8/2/2016 | 8/2/2016 | A | NR |
Jim Storey
|
|
|
As late as possible Phone #: 2083207716 >> Inspection requested via mobile web by Brett Barrier
|
BLD-Final | 8/1/2016 | 8/1/2016 | 8/1/2016 | P | NR |
Tony Young
|
|
|
As late as possible Phone #: 2083207716 >> Inspection requested via mobile web by Brett Barrier,, walk through,, needing ADA finishes,, need final trades,, needs same as fire inspector stated,, can move furniture in,, scheduled 301 for am
|
FIRE-Final Inspection | 7/29/2016 | 8/1/2016 | 8/1/2016 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Glass wall system with sliding doors has not been installed yet. I spoke with the general contractor on hardware requirements. Since hardware is not fire hardware I'm deferring installation to building inspector.
|
BLD-Final | 7/29/2016 | 7/29/2016 | 7/29/2016 | P | NR |
Mike Jordan
|
|
|
Phone #: 2083207716 >> Inspection requested via mobile web by Brett Barrier. Needs fire/life safety final.
|
FIRE-Conference | 7/20/2016 | 7/21/2016 | 7/21/2016 | P | DONE |
Troy Cobbley
|
|
|
went over life safety requirements
|
BLD-Wall cover | 7/19/2016 | 7/20/2016 | 7/20/2016 | A | PASS |
Jim Storey
|
|
|
Phone #: 2083207716 >> Inspection requested via mobile web by Brett Barrier
|
BLD-Wall cover | 7/18/2016 | 7/18/2016 | 7/18/2016 | A | FAIL |
Jim Storey
|
|
|
Phone #: 2083207716 >> Inspection requested via mobile web by Brett Barrier missing bolts on frame conections
|
Plan assigned to (CDM) | 7/7/2016 | 7/7/2016 | 7/14/2016 | | PASS |
Carl D Madsen
|
|
|
|
Plan resubmittals received | | | 7/14/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/14/2016 | | 7/14/2016 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/14/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/14/2016 | | DONE |
Christina Prado
|
|
|
All requirements met for Plan Mod #2
|
CHANGE STATUS TO (ISS) | | | 7/14/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/11/2016 | | 7/11/2016 | | FAIL |
Carl D Madsen
|
|
|
|
Plan Modification Accepted | | | 7/7/2016 | | DONE |
Christina Prado
|
|
|
Proposed to modify interior baring walls
|
BLD-Framing/Rough-in | 6/23/2016 | 6/24/2016 | 6/24/2016 | A | PART |
Jim Storey
|
|
|
Brett Phone #: ###-####c/n for aproved ft and beam in bearing wall
|
CHANGE STATUS TO (ISS) | | | 6/9/2016 | | DONE |
|
|
|
plan mod fees paid
|
(F) Reprint permit | | | 6/9/2016 | | DONE |
|
|
|
|
Plan resubmittals received | | | 6/7/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/7/2016 | | 6/7/2016 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/7/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/7/2016 | | DONE |
Christina Prado
|
|
|
DO NOT RE-ISSUE, PLAN MOD APPROVED 6/7/16
Must pay all fees (BLD & SWR) prior to changing status to ISS
|
Routing PW Sewer Rating | 6/6/2016 | | 6/6/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - PLAN CHECK | 6/6/2016 | | 6/6/2016 | | FAIL |
Carl D Madsen
|
|
|
|
Issue PAID IN FULL permit | | | 4/28/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/28/2016 | | DONE |
|
|
|
|
Plan assigned to (CDM) | 4/13/2016 | 4/13/2016 | 4/21/2016 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 4/13/2016 | | 4/21/2016 | | PASS |
Carl D Madsen
|
|
|
|
1st review completed | | | 4/21/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/21/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/21/2016 | | DONE |
|
|
|
Needs; GC Form, Rev Cert of Value
|
Routing - FIRE | 4/13/2016 | 4/13/2016 | 4/14/2016 | | PASS |
Scott Arellano
|
|
|
Comments attached to case
|
Routing - PUBLIC WORKS | 4/13/2016 | | 4/14/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Addressing | 4/13/2016 | | 4/13/2016 | | PASS |
Laura Hunter
|
|
|
|
Intake Approval | | | 4/13/2016 | | PASS |
|
|
|
|
Intake Approval | | | 4/12/2016 | | FAIL |
David Ferguson
|
|
|
Need architectural stamps, signature and dates on all plan sheets.
|
Application received | | | 4/8/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 8 2016 3:36PM
|