Third Notice | | 7/14/2020 | 8/11/2020 | | DONE |
|
|
|
MAILED 8-14-2020
|
Second Notice | | 5/17/2020 | 7/9/2020 | | DONE |
|
|
|
mailed 7-9-2020
|
First Notice | 4/17/2020 | 4/17/2020 | 5/7/2020 | | DONE |
Jim Storey
|
|
|
mailed 5-8-2020
|
BLD-Final | 4/16/2020 | 4/17/2020 | 4/17/2020 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Dillon Barresi
|
DOC - Permit Finaled | 4/17/2020 | 4/17/2020 | 4/17/2020 | P | PASS |
Jim Storey
|
|
|
|
(F) Reprint permit | | | 4/17/2020 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/10/2020 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/17/2019 | | DONE |
|
|
|
|
BLD-Conference | 4/3/2019 | 4/3/2019 | 4/3/2019 | A | PEND |
Jim Storey
|
|
|
Expires: 10/24/17
|
BLD-Aging Inspection | 9/8/2017 | 9/8/2017 | 9/14/2017 | | CANC |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 4/26/2017 | 4/26/2017 | 4/27/2017 | | PASS |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 4/25/2017 | 4/25/2017 | 4/27/2017 | | PASS |
Jim Storey
|
|
|
|
Issue PAID IN FULL permit | | | 6/10/2016 | | DONE |
Christina Prado
|
|
|
|
Route to Impact Fee Review | 6/2/2016 | 6/5/2016 | 6/3/2016 | | PASS |
Cindy M. Gould
|
|
|
|
Permit Ready to Issue | | | 6/3/2016 | | DONE |
Christina Prado
|
|
|
All requirements met 6/10/16//C_P
Need ACHD for issuance/Value set by Building Official, all BLD fees paid in full
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/2/2016 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 4/22/2016 | | 6/2/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Routing PW Sewer Design | 6/2/2016 | | 6/2/2016 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing - PLUMBING | 5/25/2016 | | 5/25/2016 | | PASS |
Daryl Spivey
|
|
|
Approved in E-Plan. TLW
|
1st review completed | | | 5/25/2016 | | DONE |
Tim L. Woodard
|
|
|
Awaiting approval by Sewer Design Prior to issuance. TLW
|
Routing Off Site - STRUCTURAL | 4/22/2016 | | 5/25/2016 | | PASS |
Tim L. Woodard
|
|
|
Approved in E-Plan Review. TLW
|
Routing PW Drainage | 4/25/2016 | | 5/25/2016 | | PASS |
Brian Murphy
|
|
|
Approved in E-Plan Review. TLW
|
Routing - PLAN CHECK | 4/22/2016 | | 5/25/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Routing PW Environmental | 4/25/2016 | | 5/5/2016 | | PASS |
Rick Christenson
|
|
|
Facility will need to comply to SIU monitoring and permit requirements.
|
Routing - PLUMBING | 4/22/2016 | | 5/2/2016 | | FAIL |
Daryl Spivey
|
|
|
Plans do not reflect the waste lines installed. resubmit plans showing waste as installed.
|
Routing PW Sewer Design | 4/25/2016 | | 5/2/2016 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Label new manhole in Federal Way "MH 562F9A". Show angles between manhole inverts, with sweeping flow channel from service invert to invert out. Clearly show in plan and profile the deliniation between public and private sewer (the edge of public R/W). Add note to plans: "Contact Boise Public Works 48 hours prior to performing sewer work in public R/W to obtain tap permit and schedule inspection. Sewer contractor shall CCTV sewer line in Federal Way up and downstream of new manhole after installation is complete, and submit video to Public Works."
|
Routing - Erosion and Sediment | 4/22/2016 | | 4/28/2016 | | CANC |
Evan Jenkins
|
|
|
No ESC Permit Required
|
Routing - PLANNING Land Div | 4/22/2016 | | 4/27/2016 | | PASS |
Todd Tucker
|
|
|
|
Routing - FIRE | 4/22/2016 | 4/22/2016 | 4/26/2016 | | PASS |
Katie Marron
|
|
|
Structural steel permit, no inspections required. FD access was approved under the grading permit.
|
Routing - PUBLIC WORKS | 4/22/2016 | | 4/25/2016 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - MECHANICAL | 4/22/2016 | | 4/25/2016 | | PASS |
Troy James
|
|
|
no mechanical to review
|
Routing - Addressing | 4/22/2016 | | 4/22/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PLANNING | 4/22/2016 | | 4/22/2016 | | PASS |
Sarah Schafer
|
|
|
Meets zoning ordinance requirements for setbacks and height.
|
Pending Assignment by TLW | 4/22/2016 | | 4/22/2016 | | DONE |
Tim L. Woodard
|
|
|
|
Intake Approval | | | 4/21/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Application received | | | 4/8/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 8 2016 5:22PM
|
Third Notice | | 8/16/2020 | | | |
|
|
|
|