BLD-Final | 8/11/2016 | 8/12/2016 | 8/12/2016 | A | PASS |
Dave Hannah
|
|
|
Brian Phone #: ###-####
|
DOC - Permit Finaled | 8/12/2016 | 8/12/2016 | 8/12/2016 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Energy code compliance | 6/8/2016 | 6/8/2016 | 6/8/2016 | P | PASS |
Phil Shearer
|
|
|
Brian Phone #: ###-####
|
BLD-Framing/Rough-in | 6/7/2016 | 6/7/2016 | 6/8/2016 | P | PASS |
Dave Hannah
|
|
|
Brian Phone #: ###-####
|
BLD-Framing/Rough-in | 6/3/2016 | 6/6/2016 | 6/6/2016 | A | NR |
Dave Hannah
|
|
|
Brian Phone #: ###-####
|
Plan assigned to (DAF) | 6/3/2016 | 6/3/2016 | 6/3/2016 | | DONE |
David Ferguson
|
|
|
Plan Mod
|
Routing - PLAN CHECK | 6/3/2016 | | 6/3/2016 | | PASS |
David Ferguson
|
|
|
Plan Mod
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/3/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/3/2016 | | DONE |
|
|
|
PLAN MOD DO NOT RE-ISSUE- no fees due per DAF
|
Telephone call | | | 6/3/2016 | | DONE |
|
|
|
called Brian- told him permit is ready and no fees due
|
CHANGE STATUS TO (ISS) | | | 6/3/2016 | | DONE |
|
|
|
|
(F) Reprint permit | | | 6/3/2016 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 6/3/2016 | | DONE |
David Ferguson
|
|
|
|
BLD-Conference | 5/31/2016 | 6/1/2016 | 6/1/2016 | A | DONE |
Dave Hannah
|
|
|
work in basement without permit talked with contractor he will get permit admended to show work in basement the intire basement has been reframed
|
Routing Walk-In (BLD) | 6/1/2016 | 6/1/2016 | 6/1/2016 | A | FAIL |
David Ferguson
|
|
|
|
Plan Modification Accepted | | | 6/1/2016 | | DONE |
|
|
|
modification to interior portion of work
|
BLD-Wall Bracing | 5/16/2016 | 5/16/2016 | 5/17/2016 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by brian mcgaha
|
BLD-Foundation | 4/18/2016 | 4/19/2016 | 4/19/2016 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by brian mcgaha
|
BLD-Footing | 4/15/2016 | 4/18/2016 | 4/18/2016 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by brian mcgaha
|
Plan assigned to (DAF) | 4/11/2016 | 4/11/2016 | 4/12/2016 | | DONE |
David Ferguson
|
|
|
Need engineers cover page with stamp
|
Routing - PLAN CHECK | 4/12/2016 | | 4/12/2016 | | PASS |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/12/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/12/2016 | | DONE |
|
|
|
need GC and RP-couldn't read the RCT # to look it up
|
Telephone call | | | 4/12/2016 | | DONE |
|
|
|
called Ken and Brian to let know permit is ready- left message on both phones
|
Issue PAID IN FULL permit | | | 4/12/2016 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 4/11/2016 | 4/11/2016 | 4/11/2016 | P | PASS |
Celine Acord
|
|
|
|
Routing Walk-In (BLD) | 4/11/2016 | 4/11/2016 | 4/11/2016 | P | FAIL |
David Ferguson
|
|
|
Need engineers cover page with stamp
|
1st review completed | | | 4/11/2016 | | FAIL |
David Ferguson
|
|
|
|
Routing - PLAN CHECK | 4/11/2016 | | 4/11/2016 | | FAIL |
David Ferguson
|
|
|
|
Case Summary (BLD) | | | 4/11/2016 | | DONE |
David Ferguson
|
|
|
|
Inspection Record Card- Bld | | | 4/11/2016 | | DONE |
David Ferguson
|
|
|
|
Application received | | 4/11/2016 | | | |
|
|
|
|