Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD16-01211
StatusFinaled
Name SCHMID DAR
Site Address 1016 W PUEBLO ST
Project Name 
Customer Number 
ePlanReviewNo
Description
** Dar came in thinking he may want to use an alternate but UL listed Solar Panel. Scanned alternate panel info and included it in documents. Panel is same size and capacity, proposed mounting brackets will still work with this panel. ** Installation of (14) solar panels (approx. 300 square feet). Panels are to be installed on a low slope roof, 2/12 or less. C of A has been provided. All work to be done according to mfg. specifications, engineering provided, notes and local codes. A separate electrical permit is required. **BJM**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/11/20165/17/20165/17/2016ADONE
DetailsTony Young
Call 15 mintues before // Dar Phone #: ###-####
DOC - Permit Finaled5/17/20165/17/20165/17/2016PPASS
DetailsTony Young
done
Zoning Approval5/12/20165/12/20165/12/2016 DONE
DetailsMatthew A Halitsky
BLD-Final5/11/20165/11/20165/11/2016PPEND
DetailsTony Young
Call 15 mintues before // Dar Phone #: ###-####
BLD-Final5/10/20165/11/20165/11/2016APEND
DetailsTony Young
Call 15 mintues before // Dar Phone #: ###-####,, pending zoning
BLD-Final5/10/20165/10/20165/10/2016PPEND
DetailsTony Young
Call 15 mintues before // Dar Phone #: ###-####,, ok pending zoning
BLD-Conference4/14/20164/15/20164/15/2016ACANC
DetailsTony Young
Dar Phone #: ###-####
Routing Walk-In (Zoning)4/12/20164/12/20164/12/2016APASS
DetailsMatthew A Halitsky
DRH16-00105
Routing Walk-In (BLD)4/12/20164/12/20164/12/2016ADONE
DetailsBrian McGowan
1st review completed  4/12/2016 DONE
DetailsBrian McGowan
Routing - PLAN CHECK4/12/2016 4/12/2016 PASS
DetailsBrian McGowan
Case Summary (BLD)  4/12/2016 DONE
DetailsBrian McGowan
Inspection Record Card- Bld  4/12/2016 DONE
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  4/12/2016 DONE
DetailsBrian McGowan
Permit Ready to Issue  4/12/2016 DONE
Issue PAID IN FULL permit  4/12/2016 DONE
Application received 4/12/2016