Second Notice | | 10/27/2016 | 11/14/2016 | | DONE |
|
|
|
Mailed 11-15-16
|
First Notice | 9/20/2016 | 9/20/2016 | 10/17/2016 | | DONE |
Jim Sly
|
|
|
Mailed 10-18-16
|
BLD-Final | 9/20/2016 | 9/20/2016 | 9/20/2016 | P | PASS |
Jim Sly
|
|
|
Call Phil when on site Phone #: ###-#### Inspection requested via web by Philip Allen
|
DOC - Permit Finaled | 9/20/2016 | 9/20/2016 | 9/20/2016 | P | PASS |
Jim Sly
|
|
|
|
FIRE-Final Inspection | 9/20/2016 | 9/20/2016 | 9/20/2016 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Final | 8/11/2016 | 8/12/2016 | 8/12/2016 | A | CANC |
Jim Sly
|
|
|
Deli Final- Re- opening. Call Phil when on site @ ###-#### Phone #: ###-#### Inspection requested via web by Philip Allen
|
BLD-Final | 7/11/2016 | 7/11/2016 | 7/11/2016 | P | PART |
Jim Sly
|
|
|
This inspection request is for the Starbucks Kiosk only. Please call when on site- Phil Allen ###-#### Phone #: ###-#### Inspection requested via web by Philip Allen Starbucks Kiosk only.........OK to Occupy.
|
FIRE-Alarm Testing | 7/11/2016 | 7/11/2016 | 7/11/2016 | P | CANC |
Troy Cobbley
|
|
|
Please call Phil Allen when on site @ ###-#### Phone #: ###-#### Inspection requested via web by Philip Allen
|
FIRE-Final Inspection | 7/11/2016 | 7/11/2016 | 7/11/2016 | P | PART |
Troy Cobbley
|
|
|
The new StarBucks Kiosk is ok to occupy. No other work inspected.
|
(F) Reprint permit | | | 7/11/2016 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/6/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/6/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 6/29/2016 | | |
|
|
|
|
Plan assigned to (JG) | 6/17/2016 | 6/17/2016 | 6/29/2016 | | PASS |
Javier Guzman
|
|
|
6/30 L2 FredMeyer#662 Starbucks Kiosk ePlan
|
1st review completed | | | 6/29/2016 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/29/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/29/2016 | | DONE |
|
|
|
**MET*** Need Revised Cert of Value ***MET*** and GC Form
|
Routing - PLAN CHECK | 6/17/2016 | | 6/29/2016 | | PASS |
Javier Guzman
|
|
|
|
Routing PW Environmental | 6/20/2016 | | 6/27/2016 | | PASS |
Rick Christenson
|
|
|
|
Routing - PUBLIC WORKS | 6/17/2016 | | 6/20/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 6/17/2016 | | 6/20/2016 | | PASS |
Evan Jenkins
|
|
|
As a phase of the Fred Meyer #662 T.I. - Remove existing Starbucks from deli area and add new Starbucks kiosk to sales floor.
|
Routing - PLUMBING | 6/17/2016 | | 6/17/2016 | | PASS |
Bill VanDegrift
|
|
|
additional cross connection protection may be required
|
Routing - MECHANICAL | 6/17/2016 | | 6/17/2016 | | PASS |
Troy James
|
|
|
|
Routing - Addressing | 6/17/2016 | | 6/17/2016 | | PASS |
Laura Hunter
|
|
|
|
Intake Approval | | | 6/17/2016 | | PASS |
David Ferguson
|
|
|
|
Intake Approval | | | 6/16/2016 | | FAIL |
David Ferguson
|
|
|
Please have page PD1.1.7 signed and dated by Cathy Miller. Also, the Cover Page (C1) needs to be signed and dated by Randall Syphus.
|
Application received | | | 4/12/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 12 2016 1:29PM
|
Intake Approval | | | 4/12/2016 | | FAIL |
David Ferguson
|
|
|
1) Plans say "Not for construction or building permit". This comment needs to be removed from all five plan sheets.
2) The plans are not stamped, signed and dated by the architect of record.
3) There is no #304 Registered Design Professional form in your submittal documents.
4) Because this is an establishment that serves food and beverages, a CDHD application and approval form must be submitted.
5) No vicinity map has been provided just a key map showing the store itself and not where it's location is within the City.
6) All 5 plan sheets must be uploaded individually. The cover page G-0001 has not been separated out.
7) Per out checklist, all plan sheets shall be minimum of 18"x24". Your cover page is small than that.
|