BLD-Final | 2/24/2017 | 2/24/2017 | 2/24/2017 | P | PASS |
Tony Young
|
|
|
George Phone #: ###-####
|
DOC - Permit Finaled | 2/24/2017 | 2/24/2017 | 2/24/2017 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Final | 2/16/2017 | 2/17/2017 | 2/17/2017 | A | FAIL |
Tony Young
|
|
|
Call for access // Charlie Phone #: ###-####,, c/n posted,, post, stucco, f/caulking, plans,, drainage
|
BLD-Final | 2/15/2017 | 2/16/2017 | 2/16/2017 | A | NR |
Dave Hannah
|
|
|
Call for access // Charlie Phone #: ###-#### needs hillside final
|
PubWorks Occupancy Approval | 2/16/2017 | 2/16/2017 | 2/16/2017 | | DONE |
Jason C. Taylor
|
|
|
BOND IN PLACE ...A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Final | 1/25/2017 | 1/27/2017 | 1/28/2017 | P | NR |
Tony Young
|
|
|
Charlie Phone #: ###-####,, needs hillside and trades, no inspection made
|
BLD-Final | 1/25/2017 | 1/25/2017 | 1/25/2017 | P | NR |
Tony Young
|
|
|
Charlie Phone #: ###-####
|
BLD-Final | 1/24/2017 | 1/25/2017 | 1/25/2017 | A | NR |
Tony Young
|
|
|
Charlie Phone #: ###-####,, need mech final,, hillside
|
BLD-Other | 9/20/2016 | 9/20/2016 | 9/20/2016 | P | PART |
Tony Young
|
|
|
fire soffit; Charley Phone #: ###-####,, work in progress,, ok
|
BLD-Energy code compliance | 9/9/2016 | 9/9/2016 | 9/9/2016 | P | PASS |
Tony Young
|
|
|
Insulation // Charley Phone #: ###-####
|
BLD-Framing/Rough-in | 9/6/2016 | 9/6/2016 | 9/6/2016 | P | PART |
Tony Young
|
|
|
Charlie Phone #: ###-####,, corrections,, paint,, ok to insulate
|
Plan Modification Accepted | | | 8/18/2016 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 8/18/2016 | | 8/18/2016 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Wall Bracing | 8/10/2016 | 8/12/2016 | 8/12/2016 | P | PASS |
Tony Young
|
|
|
Charlie Phone #: ###-####,, exterior ok
|
BLD-Wall Bracing | 8/9/2016 | 8/10/2016 | 8/10/2016 | A | NR |
Tony Young
|
|
|
Charlie Phone #: ###-####
|
BLD-Wall Bracing | 8/8/2016 | 8/9/2016 | 8/9/2016 | A | NH |
Tony Young
|
|
|
Charlie Phone #: ###-####
|
BLD-Wall Bracing | 8/5/2016 | 8/8/2016 | 8/8/2016 | A | CANC |
Tony Young
|
|
|
Charlie Phone #: ###-####
|
BLD-Wall Bracing | 8/1/2016 | 8/2/2016 | 8/2/2016 | A | NR |
Jim Sly
|
|
|
Charley Phone #: ###-#### No approved plans on site.
|
BLD-Foundation | 6/17/2016 | 6/20/2016 | 6/20/2016 | P | PASS |
Dave Hannah
|
|
|
Sebastian Phone #: ###-####
|
BLD-Footing | 6/10/2016 | 6/13/2016 | 6/13/2016 | A | PASS |
Tony Young
|
|
|
Sebastian Phone #: ###-####
|
PubWorks Subgrade Approval | 6/13/2016 | 6/13/2016 | 6/13/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 6/9/2016 | 6/10/2016 | 6/10/2016 | P | PEND |
Tony Young
|
|
|
Sebastian Phone #: ###-####,, need soils report
|
BLD-Footing | 6/7/2016 | 6/8/2016 | 6/8/2016 | P | NR |
Tony Young
|
|
|
Sebastian Phone #: ###-####,, need soils 1st
|
Issue PAID IN FULL permit | | | 5/17/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 5/16/2016 | | |
|
|
|
|
Plan assigned to (BJM) | 4/14/2016 | 4/14/2016 | 5/16/2016 | | DONE |
Brian McGowan
|
|
|
due 5/4 L2 hillside - Failed-5-4-16 Grading plan did not match plans
|
Inspection Record Card- Bld | | | 5/16/2016 | | DONE |
|
|
|
|
Telephone call | | | 5/16/2016 | | DONE |
|
|
|
Spoke with George informing that this permit is ready and the fee amount that is due
|
Routing - PLAN CHECK | 5/12/2016 | | 5/16/2016 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 5/16/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/16/2016 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 5/16/2016 | | DONE |
|
|
|
requirements met
|
Routing PW Grading-Hillside | 5/12/2016 | | 5/12/2016 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - PUBLIC WORKS | 5/12/2016 | | 5/12/2016 | | PASS |
Jennifer Bruner
|
|
|
|
Routing PW Grading-Hillside | 5/10/2016 | | 5/10/2016 | | FAIL |
Jason C. Taylor
|
|
|
Grading plans and house plans do not match. Revise one or the other. Also need 3rd set of grading plan for approval. JCT ###-####.
|
Routing - PUBLIC WORKS | 5/10/2016 | | 5/10/2016 | | FAIL |
Jennifer Bruner
|
|
|
Please see PW Grading-Hillside
|
Routing - PLAN CHECK | 5/10/2016 | | 5/10/2016 | | FAIL |
Brian McGowan
|
|
|
Failed to tp PW Hillside
|
Plan resubmittals received | | | 5/10/2016 | | DONE |
|
|
|
received 3 copies of sheet 1 of 2- gave to Brian
|
Routing - PLAN CHECK | 4/21/2016 | | 5/4/2016 | | FAIL |
Brian McGowan
|
|
|
Failed due to PW Hillside
|
Routing - PLAN CHECK | | | 5/4/2016 | | FAIL |
Brian McGowan
|
|
|
Grading Plan and construction drawings do not match.
|
1st review completed | | | 5/4/2016 | | FAIL |
Brian McGowan
|
|
|
Grading Plan and construction drawings do not match.
|
Plan resubmittals received | | | 5/3/2016 | | DONE |
|
|
|
Two copies of Geotechnical Investigation and Recommendations. Taken to Brian Mc
|
Routing - MECHANICAL | | | 5/3/2016 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 5/2/2016 | | 5/2/2016 | | PASS |
Leon Letson
|
|
|
Routed to Leon 5/2/16
|
Routing PW Sewer Rating | 5/2/2016 | | 5/2/2016 | | PASS |
Jennifer Bruner
|
|
|
|
Routing PW Grading-Hillside | 4/14/2016 | | 5/2/2016 | | FAIL |
Jason C. Taylor
|
|
|
Need Geotechncial Report submitted as per checklist, hillside ordinace, and CFH requirements. JCT
|
Routing - FIRE | 4/21/2016 | 4/13/2016 | 4/21/2016 | | PASS |
Scott Arellano
|
|
|
No additional comments.
|
Routing - Erosion and Sediment | 4/19/2016 | | 4/21/2016 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
Permit for the construction of a new 3,378 sq. ft., two story with a basement (first story 1,340 sq. ft., second story 1,396 sq. ft., basement level 642 sq. ft.) single family dwelling with 4 bedrooms, 3.5 bathrooms, approximately *** sq. ft. of covered patio/porch and a *** sq. ft. attached garage
|
Plan assigned to (LEG) Tisha | 4/13/2016 | | 4/14/2016 | | DEFR |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/13/2016 | | DONE |
|
|
|
|
Intake Approval | | | 4/13/2016 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/13/2016 | | DONE |
|
|
|
|
Routing - Addressing | 4/13/2016 | | 4/13/2016 | | PASS |
Laura Hunter
|
|
|
|
Application received | | 4/12/2016 | | | |
|
|
|
|
Routing - PUBLIC WORKS | 5/20/2016 | | | | PASS |
|
|
|
|