BLD-Final | 12/5/2017 | 12/6/2017 | 12/6/2017 | A | CANC |
Brandon Shaw
|
|
|
Please call Drew 30 minutes prior for access. Phone #: ###-#### Inspection requested via web by Drew Thueson
|
DOC - Permit Finaled | 12/6/2017 | 12/6/2017 | 12/6/2017 | P | PASS |
Brandon Shaw
|
|
|
|
Zoning Approval | 11/15/2017 | 11/15/2017 | 11/15/2017 | | PASS |
KayCee Babb
|
|
|
Elevations as built submitted, located DRH16-00341.
|
BLD-Final | 11/13/2017 | 11/14/2017 | 11/14/2017 | P | NR |
Tony Young
|
|
|
Drew Phone #: ###-####-please call 30 minutes prior to meet
|
Zoning Approval | 11/13/2017 | 11/13/2017 | 11/13/2017 | | FAIL |
KayCee Babb
|
|
|
Front elevation does not match proposed elevations approved under DRH16-00341 (modification of DRH16-00003). Plans show two windows on first floor that are currently a single picture window that does not match the configuration or design of either proposed windows. Other windows on front have different configuration. Windows on second floor have different trim than in proposed and approved elevations. "Music room" popout not added.
|
BLD-Final | 11/9/2017 | 11/13/2017 | 11/13/2017 | A | CANC |
Tony Young
|
|
|
Call before to meet // Drew Phone #: ###-####
|
BLD-Aging Inspection | 11/8/2017 | 11/8/2017 | 11/9/2017 | | PASS |
Tony Young
|
|
|
|
BLD-Aging Inspection | 11/7/2017 | 11/7/2017 | 11/8/2017 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 6/23/2017 | 6/23/2017 | 6/26/2017 | | PASS |
Tony Young
|
|
|
|
BLD-Framing/Rough-in | 2/8/2017 | 2/9/2017 | 2/9/2017 | A | PART |
Jim Sly
|
|
|
Front porch framing inspection. Phone #: ###-#### Inspection requested via web by Drew Thueson Front Porch OK.
|
BLD-Conference | 11/16/2016 | 11/17/2016 | 11/17/2016 | A | PASS |
Tony Young
|
|
|
Dominick Phone #: ###-####,, deck connections to modified deck extension
|
BLD-Energy code compliance | 7/29/2016 | 7/29/2016 | 7/29/2016 | P | PASS |
Dave Hannah
|
|
|
contractor insulated areas that are open on ext walls
|
BLD-Wall cover | 7/26/2016 | 7/29/2016 | 7/29/2016 | P | DONE |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Drew Thueson
|
BLD-Framing/Rough-in | 7/26/2016 | 7/27/2016 | 7/27/2016 | P | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Drew Thueson
|
BLD-Framing/Rough-in | 7/25/2016 | 7/26/2016 | 7/26/2016 | P | NR |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Drew Thueson,, walk through on frame,, need mech full pass,, need fireblocking in several areas,, header,, etc
|
BLD-Conference | 6/20/2016 | 6/21/2016 | 6/21/2016 | A | PEND |
Tony Young
|
|
|
Kirsten Phone #: ###-####,, directed to see the mechanical plan review for clearence on appliances
|
BLD-Framing/Rough-in | 6/7/2016 | 6/8/2016 | 6/8/2016 | A | PART |
Tony Young
|
|
|
To inspect front porch addition ledger board and joists before covering with floor decking. Phone #: ###-#### Inspection requested via web by Drew Thueson,, this portion ok
|
BLD-Foundation | 5/20/2016 | 5/24/2016 | 5/24/2016 | P | PART |
Tony Young
|
|
|
Chuck Phone #: ###-####,, work in progress,, ok
|
BLD-Footing | 5/20/2016 | 5/23/2016 | 5/23/2016 | A | PASS |
Phil Shearer
|
|
|
Chuck Phone #: ###-####
|
BLD-Conference | 5/10/2016 | 5/10/2016 | 5/10/2016 | P | PEND |
Tony Young
|
|
|
would like call ahead; Drew Phone #: ###-####, ?s ceiling heights,, need to see plan review
|
BLD-Footing | 4/27/2016 | 4/28/2016 | 4/28/2016 | A | PASS |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Drew Thueson
|
Issue PAID IN FULL permit | | | 4/27/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/27/2016 | | DONE |
|
|
|
|
Plan assigned to (LEG) Tisha | 4/13/2016 | | 4/26/2016 | | DONE |
Tisha Gallop
|
|
|
***walk-in 1st review 4/15; plan check
|
Plan resubmittals received | | | 4/26/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/26/2016 | | 4/26/2016 | | PASS |
Tisha Gallop
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/26/2016 | | DONE |
|
|
|
yes esc/ yes energy
|
Permit Ready to Issue | | | 4/26/2016 | | DONE |
Christina Prado
|
|
|
ALL REQUIRMENTS MET 4-27-16 /CEV
Need RP for issuance
|
Routing - PLAN CHECK | 4/13/2016 | | 4/15/2016 | | FAIL |
Tisha Gallop
|
|
|
|
1st review completed | | | 4/15/2016 | | FAIL |
|
|
|
|
Application received | | | 4/13/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 13 2016 11:58AM
|
Plans ACCEPTED BY PLAN TECH | | | 4/13/2016 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 4/13/2016 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/13/2016 | | DONE |
Christina Prado
|
|
|
|
Routing - Design Review | 4/13/2016 | | 4/13/2016 | | PASS |
Matthew A Halitsky
|
|
|
|