Case Summary (BLD) | | | 10/12/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/25/2016 | | DONE |
|
|
|
|
BLD-Final | 4/20/2016 | 4/21/2016 | 4/21/2016 | A | PASS |
Jim Storey
|
|
|
ok per the revised plan by planreview
|
Permanent Occupancy | | | 4/21/2016 | | DONE |
|
|
|
|
BLD-Final | 4/19/2016 | 4/20/2016 | 4/20/2016 | P | CANC |
Phil Shearer
|
|
|
Michael Phone #: ###-####
|
BLD-Final | 4/19/2016 | 4/20/2016 | 4/20/2016 | A | FAIL |
Jim Storey
|
|
|
Michael Phone #: ###-#### not a 1 hr corridor/ no openuing protection per planreviewers red line.
|
FIRE-Final Inspection | 4/19/2016 | 4/20/2016 | 4/20/2016 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
Plan Reviewer's activity | | | 4/20/2016 | | DONE |
Tim L. Woodard
|
|
|
Existing corridor not compliant. In accordance with the 2012 IEBC and a Level 1 alteration there is no requirement to make the corridor come into compliance at this time. Future Level 2 or Level 3 remodels may require corridor to be brought into compliance. TLW
|
FIRE-Final Inspection | 4/19/2016 | 4/19/2016 | 4/19/2016 | P | FAIL |
Troy Cobbley
|
|
|
Resubmit plans showing the additional floor area that is being occupied, remove the thumbturn dead bolt (keyed ok) and provide sticker at the exit as discussed.
|
Issue PAID IN FULL permit | | | 4/19/2016 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 4/13/2016 | | 4/18/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 4/13/2016 | | 4/18/2016 | | PASS |
Tim L. Woodard
|
|
|
|
1st review completed | | | 4/18/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/18/2016 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 4/18/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/18/2016 | | DONE |
|
|
|
requirements met
|
Print Occupancy Form | | | 4/18/2016 | | DONE |
|
|
|
|
Telephone call | | | 4/18/2016 | | DONE |
|
|
|
called Michael- left message that permit is ready for pick up and fees due
|
Plans ACCEPTED BY PLAN TECH | | | 4/13/2016 | | DONE |
|
|
|
|
Intake Approval | | | 4/13/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/13/2016 | | DONE |
|
|
|
|
First Notice | | 5/1/2016 | | | |
|
|
|
|
Application received | | 4/13/2016 | | | |
|
|
|
|