Information based on query as of Sunday, June 23, 2024.
Permit Information
Permit NumberBLD16-01265
StatusFinaled
Name ESI
Site Address 501 E PARKCENTER BLVD
Project NameThe District at Parkcenter
Customer Number 
ePlanReviewYes
Description
(THE DISTRICT AT PARKCENTER – SWIMMING POOL AND FENCED ENCLOSURE) (DRH15-00030) (3-28-17 PLAN MODIFICATION TO MODIFY THE POOL MECHANICAL ROOM LOCATED IN THE FITNESS CENTER BUILDING AND TO ADD GAS EMERGENCY SHUT OFF VALVES.) To construct an in-ground concrete swimming pool. The water surface area of the swimming pool will be about 1,494 square feet, the pool perimeter will be about 221 lineal feet, and the volume will be about 28,700 gallons. The total fenced area, excluding the landscaped areas but including the pool area, has a total area of about 7,450 square feet. Work is to include a reinforced concrete (shotcrete) swimming pool (pool walls, pool floor, footings and columns for future cabanas), concrete stairways to serve the pool, handrails, a pool lift for the disabled, and pool equipment. One accessible entry for the disabled (i.e. a pool lift) is required for the swimming pool. An accessible entry (i.e. transfer system) is also required for the tanning shelf. The permanent 20’ x 20’ cabana will be constructed under this permit. The 8’ x 8’ cabanas are considered to be furniture and are not regulated by the Building Code. A fence with 3 egress gates to enclose the swimming pool area will also be constructed under this permit. The pool is not allowed to be used until this permit is finaled. Compliance with the 2012 ISPSC is allowed in lieu of the 2012 IBC. The Club Building and the Fitness Center Building restrooms will serve the swimming pool fenced area and were constructed under permits BLD14-01818 and BLD14-01825. The swimming pool shall not be filled with water until the fence is completed. The pool shall not be used and a Certificate of Occupancy shall not be issued until the work authorized under permit BLD14-01818 (Club Building) and BLD14-01825 (Fitness Center Building) is completed and Certificates of Occupancy are issued under those permits. The work is required to comply with the approved drawings, with the plan review report, with the structural design, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/5/20174/6/20174/6/2017APASS
DetailsJim Storey
Matt ###-####
Zoning Approval4/6/20174/6/20174/6/2017 DONE
DetailsSarah Schafer
PubWorks Occupancy Approval4/6/20174/6/20174/6/2017 DONE
DetailsTiffany Lowery
Permanent Occupancy  4/6/2017 DONE
BLD-Final3/30/20173/31/20174/5/2017ADEFR
DetailsJim Storey
Matt ###-####
FIRE-Final Inspection4/5/20174/5/20174/5/2017PPASS
DetailsJim Page
Exit lights have been changed to weather proof fixtures. Final life fire safety inspection passed/complete.
BLD-Final3/22/20173/30/20173/31/2017PDEFR
DetailsJim Storey
Matt ###-####
FIRE-Final Inspection3/22/20173/29/20173/29/2017APART
DetailsJim Page
Partial final for life fire safety inspection passed/complete. Exit lights currently in place are temporary and not rated for outdoor use, exit lights rated for outdoor use are on order and will be installed when received. Life fire safety can be signed off after outdoor rated exit lights are installed and inspected.
Plan assigned to (CJW)3/20/20173/20/20173/28/2017 PASS
DetailsCarl Westfall
plan mod (2nd done)
Routing - PLAN CHECK3/25/2017 3/28/2017 PASS
DetailsCarl Westfall
Routing
Plan Reviewer's activity  3/28/2017 DONE
Completed routing the plan mod.
Permit Ready to Issue  3/28/2017 DONE
plan mod ONLY - DO NOT RE-ISSUE
Telephone call  3/28/2017 DONE
Left a message for Matt informing him that the plan mod fees would need to be paid before inspections (fire life safety and final) could be done. Informed him that it could be paid for online or over the phone (2.5% charge)
CHANGE STATUS TO (ISS)  3/28/2017 DONE
DetailsChristina Prado
Routing - MECHANICAL3/25/2017 3/27/2017 PASS
DetailsTroy James
Plan resubmittals received  3/24/2017 DONE
Plan resubmittals requested  3/23/2017 DONE
Routing - FIRE3/20/20173/20/20173/21/2017 PASS
DetailsKatie Marron
Routing - MECHANICAL3/20/2017 3/21/2017 FAIL
DetailsTroy James
Routing - PLUMBING3/20/2017 3/21/2017 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing - PLAN CHECK3/20/2017 3/20/2017 PASS
DetailsCarl Westfall
Plan Modification Accepted  3/20/2017 DONE
DetailsChristina Prado
Plan Mod for updates to gas shut off location and fitness mechanical room
FIRE-Conference2/1/20172/1/20172/1/2017PDONE
DetailsJim Page
Fire conference complete
BLD-Footing10/31/201610/31/201610/31/2016PNR
DetailsJim Storey
Cabana footing inspection. Please come at 4pm if possible. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Foundation7/27/20167/28/20167/28/2016PPASS
DetailsJim Storey
Pool rebar inspection Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Foundation7/27/20167/27/20167/27/2016PCANC
DetailsJim Storey
pool rebar inspection Phone #: ###-#### >> Inspection requested via web by Corey Hockersmith Inspection cancelled from web by: Corey Hockersmith
Issue PAID IN FULL permit  7/11/2016 DONE
Print Occupancy Form  7/11/2016 DONE
Print Occupancy Form  7/11/2016 DONE
Permit Ready to Issue  6/16/2016 DONE
***MET 6/28/16 CAN***Need GC Form and Revised Cert of Value; GC did not turn in app
Plan assigned to (CJW)5/7/20165/7/20166/15/2016 PASS
DetailsCarl Westfall
(1st done) THE DISTRICT AT PARKCENTER - SWIMMING POOL - (May 25 - 3 weeks) Level 3 TI - ePlanReview
Routing - FIRE6/14/2016 6/15/2016 PASS
DetailsKatie Marron
Revised report attached to case.
PLANS/APPL TAKEN TO FRONT DESK  6/15/2016 DONE
DetailsJason Blais
Per Carl Westfall.
Plan resubmittals received  6/14/2016 DONE
Routing - PLAN CHECK6/14/2016 6/14/2016 PASS
DetailsCarl Westfall
Drawings approved with redlines
1st review completed  5/18/2016 DONE
Plan resubmittals requested  5/18/2016 DONE
Routing - PLAN CHECK5/7/2016 5/18/2016 FAIL
DetailsCarl Westfall
Revised drawings required
Routing - Erosion and Sediment5/7/2016 5/12/2016 PASS
DetailsAndy J. Long
No new ESC permit needed. Covered under existing permit ESC14-00588
Routing - Design Review5/7/2016 5/10/2016 PASS
DetailsSarah Schafer
Sarah Schafer - DRH15-00030
Approved per DRH15-0030
Routing - FIRE5/7/20165/7/20165/9/2016 FAIL
DetailsScott Arellano
Report attached to case and emailed to design professional.
Routing - Addressing5/7/2016 5/9/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS5/7/2016 5/9/2016 PASS
DetailsRachael Beierle
Routing - PLUMBING5/7/2016 5/9/2016 PASS
DetailsBill VanDegrift
Per plan and ISPC.
Routing - MECHANICAL5/7/2016 5/9/2016 PASS
DetailsTroy James
Routing - ELECTRICAL5/7/2016 5/9/2016 PASS
DetailsJavier Guzman
Routing PW Drainage5/9/2016 5/9/2016 PASS
DetailsBrian Murphy
Pending Assignment by JCB5/7/2016 5/7/2016 DONE
DetailsJason Blais
Intake Approval  5/5/2016 PASS
DetailsJason Blais
Prescreen approved by Javier Guzman and plan review fees paid.
Intake Approval  4/15/2016 FAIL
DetailsJavier Guzman
Please provide the following (Incomplete submittals will not be accepted):
1. Per Electronic Plan Review Submittal Standards All plans must be uploaded in “Landscape” format in the horizontal position.
2. The checklist is not complete, not all plan page numbers are listed in the submitted checklist to locate the requested items.
3. Plans stamped and signed by an Idaho licensed design professional.
4. Code Analysis/Building Data on front sheet of plans which includes: code year, occupancy group(s), land use zone, construction type, deck & lawn public areas square footage within the barrier/fence, area of the pool(s), classification of pool per standard, floor areas for associated building(s), building height, fire suppression system (specify NFPA code applicable), declare any fire alarm or smoke control system.
5. Show details of the following on plans as required from checklist: (please label plan sheet # on checklist for location of detail)
• Barrier/fence elevation plan dimensioned, access gate(s), accessible hardware, panic hardware if required, & hardware height. Commercial swimming pools shall be completely enclosed by a fence at least 4 feet in height or with a screen enclosure. Openings in the fence shall not permit the passage of a 4-inchdiameter sphere. The fence or screen enclosure shall be equipped with self-closing and self-latching gates.
• Entrapment avoidance, indicate method of compliance on plans.
• Suction outlets design
• Cover plates at suction outlet
• Atmospheric vacuum relief system
• Pool filter cleaners location indicated on plans
• Stair details, showing dimensioned pool stair details & cross-section provided noting rise/run per applicable code
• Show Portable fire extinguisher locations
6. Structural calculations for pool design stamped and signed by an Idaho licensed engineer
7. Specify design loads and material specifications
8. Form #310 – Statement of Special Inspections completed by the design engineer
9. ICC-ES Evaluation Services Report for all anchor connection products proposed for attaching the swimming pool accessory components to floors, walls or ceiling, i.e. steps, rails, lifts, etc…
10. Accessible route details and components for accessing the pool
11. Pool heaters readily accessible on-off switch indicated on plans and a note provided on plans stating “All pool heaters shall be equipped with a readily accessible on-off switch to allow shutting off the heater without adjusting the thermostat setting.”
12. Time switches that can automatically turn off and on heaters and pumps according to a preset schedule are shown and noted on plans.
13. Plumbing plans stamped and signed by an Idaho licensed engineer showing the following:
• Domestic water line locations & sizes including backflow valve
• Domestic water line locations & sizes including backflow valve
• Domestic and pool backwash wastewater drainage details/notes including size and venting, connecting to sanitary sewer
• Pool heater details including location, fuel type, venting and gas piping sizes
14. Electrical plans showing Grounding & Bonding details and notes
Application received  4/14/2016 DONE
Application submitted via PDS Online on Apr 14 2016 2:32PM
First Notice 4/16/2017