BLD-Final | 11/30/2016 | 12/1/2016 | 12/1/2016 | P | PASS |
Mike Jordan
|
|
|
Call half hour befor to meet there // Farris Phone #: ###-####. All issues resolved.
|
DOC - Permit Finaled | 12/1/2016 | 12/1/2016 | 12/1/2016 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 11/15/2016 | 11/15/2016 | 11/15/2016 | P | FAIL |
Mike Jordan
|
|
|
Call half hour before to meet // Ferris Phone #: ###-####. 20 minute door to be selg closing, handrails need to return back to wall.
|
BLD-Energy code compliance | 9/30/2016 | 9/30/2016 | 9/30/2016 | P | PASS |
Mike Jordan
|
|
|
Andy Phone #: ###-####
|
BLD-Framing/Rough-in | 9/27/2016 | 9/28/2016 | 9/28/2016 | A | PASS |
Mike Jordan
|
|
|
Andy Phone #: ###-####
|
BLD-Framing/Rough-in | 9/27/2016 | 9/27/2016 | 9/27/2016 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 9/22/2016 | 9/27/2016 | 9/27/2016 | A | CANC |
Mike Jordan
|
|
|
Andy Phone #: ###-####
|
BLD-Conference | 9/27/2016 | 9/27/2016 | 9/27/2016 | A | DONE |
Mike Jordan
|
|
|
Andy Phone #: ###-####
|
BLD-Framing/Rough-in | 9/22/2016 | 9/22/2016 | 9/22/2016 | P | NR |
Mike Jordan
|
|
|
Please call either way... pass or fail // Andy Phone #: ###-####
|
BLD-Framing/Rough-in | 9/16/2016 | 9/19/2016 | 9/19/2016 | A | FAIL |
Mike Jordan
|
|
|
Andy Phone #: ###-####-please call Andy with results of inspection. Complete airseal pack, fireblock at fireplace flues at ceiling level, mech inspection on gas line failed. Correction notice issued.
|
BLD-Framing/Rough-in | 8/24/2016 | 8/24/2016 | 8/24/2016 | P | CANC |
Mike Jordan
|
|
|
Andy Phone #: ###-####
|
BLD-Wall Bracing | 8/24/2016 | 8/24/2016 | 8/24/2016 | P | PASS |
Mike Jordan
|
|
|
Andy Phone #: ###-####
|
BLD-Framing/Rough-in | 8/22/2016 | 8/22/2016 | 8/22/2016 | P | NR |
Mike Jordan
|
|
|
Andy Phone #: ###-####
|
BLD-Footing | 5/27/2016 | 5/31/2016 | 5/31/2016 | P | PASS |
Mike Jordan
|
|
|
would like call ahead; Leon Phone #: ###-####
|
Routing Walk-In (BLD) | 4/25/2016 | 4/25/2016 | 4/25/2016 | P | PASS |
Tisha Gallop
|
|
|
|
Plan assigned to (LEG) Tisha | 4/25/2016 | | 4/25/2016 | | DONE |
Tisha Gallop
|
|
|
|
Inspection Record Card- Bld | | | 4/25/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/25/2016 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/25/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/25/2016 | | DONE |
Brittany Hill
|
|
|
|
CHANGE STATUS TO (ISS) | | | 4/25/2016 | | DONE |
Brittany Hill
|
|
|
|
Routing Walk-In (Zoning) | 4/15/2016 | 4/15/2016 | 4/15/2016 | P | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 4/15/2016 | 4/15/2016 | 4/15/2016 | P | FAIL |
Brian McGowan
|
|
|
|
1st review completed | | | 4/15/2016 | | FAIL |
|
|
|
Need foundation plan and more information
|
Routing - PLAN CHECK | 4/15/2016 | | 4/15/2016 | | FAIL |
Brian McGowan
|
|
|
Need foundation plan and more information
|
Application received | | 4/15/2016 | | | |
|
|
|
|