Second Notice | | 4/21/2017 | 5/10/2017 | | DONE |
|
|
|
1st noticed turned in 4/18/17
|
First Notice | | 3/27/2017 | 4/11/2017 | | DONE |
|
|
|
Sent 4-12-17
|
Permanent Occupancy | | | 3/17/2017 | | DONE |
|
|
|
|
BLD-Final | 3/15/2017 | 3/16/2017 | 3/16/2017 | P | PASS |
Jim Sly
|
|
|
Ian Phone #: ###-#### OK for Perm Occ.
|
Zoning Approval | 3/16/2017 | 3/16/2017 | 3/16/2017 | | DONE |
Sarah Schafer
|
|
|
|
FIRE-Final Inspection | 1/19/2017 | 1/20/2017 | 1/20/2017 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Opticon tested and verified by Boise Fire. Contractor stated the side emergency gate has a Knox key and will be locked when snow can be cleared.
|
Temporary Occupancy | 1/20/2017 | 4/20/2017 | 1/20/2017 | | DONE |
Brittany Hill
|
|
|
|
BLD-Final | 1/18/2017 | 1/19/2017 | 1/19/2017 | A | PART |
Jim Sly
|
|
|
temp on Fire, life/ safety . waiting for fire truck to test Opticom function. Phone #: ###-#### Inspection requested via web by J.C. Murray OK for Temp Occ. OK for Perm Occ. when Zoning and Fire signs Perm.
|
FIRE-Final Inspection | 1/17/2017 | 1/18/2017 | 1/18/2017 | A | PART |
Troy Cobbley
|
|
|
A temporary for life safety is being given until the Opticon for the main gate is verified by the Boise Fire Dept as functional. I let the contractor know that the gate is not to be used until it is functional. I spoke to the gate installer and the Opticon should be installed by tomorrow morning and tested in the afternoon.
|
PubWorks Occupancy Approval | 1/18/2017 | 1/18/2017 | 1/18/2017 | | DONE |
Tiffany Lowery
|
|
|
|
FIRE-Final Inspection | 1/16/2017 | 1/17/2017 | 1/17/2017 | P | FAIL |
Troy Cobbley
|
|
|
Need the project related fire alarm and fire sprinkler permits finaled and the exit discharge light over the main exit repaired. I also discussed the need for the Opticom for the electric main gate prior to a final sign off for the entire project. See note 13 of the building A review comments.
|
BLD-Ceiling Grid Inspection | 1/12/2017 | 1/12/2017 | 1/12/2017 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by J.C. Murray
|
FIRE-Conference | 1/12/2017 | 1/12/2017 | 1/12/2017 | P | DONE |
Troy Cobbley
|
|
|
I spoke to the general contractor about getting the fire hydrant located along Eagle Rd rotated as per the approved drawings. He was going to follow up with Suez.
|
BLD-Energy code compliance | 11/4/2016 | 11/7/2016 | 11/7/2016 | A | PART |
Jim Sly
|
|
|
Jake Phone #: ###-#### Firestop penitrations 3 hr wall.
|
BLD-Footing | 10/20/2016 | 10/21/2016 | 10/21/2016 | A | PASS |
Jim Sly
|
|
|
Jake Phone #: ###-#### Sign.
|
OVERRIDE | | | 10/17/2016 | | |
|
|
|
|
Plan assigned to (CDM) | 10/13/2016 | 10/13/2016 | 10/17/2016 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 10/17/2016 | | 10/17/2016 | | PASS |
Carl D Madsen
|
|
|
No review required the sign location will be reviewed when the sign permit is submitted. Ok per Josh wilson and Brian Murphy. 10-17-16
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/17/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/17/2016 | | DONE |
|
|
|
Plan Mod approved, no fees due
|
CHANGE STATUS TO (ISS) | | | 10/17/2016 | | DONE |
|
|
|
Plan Mod approved, no fees due
|
Plan Modification Accepted | | | 10/13/2016 | | DONE |
|
|
|
Per request from the architecture firm
|
BLD-Framing/Rough-in | 10/7/2016 | 10/7/2016 | 10/7/2016 | P | PART |
Jim Sly
|
|
|
Jake Phone #: ###-#### 3 hr wall at office area
|
CHANGE STATUS TO (ISS) | | | 10/6/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 10/4/2016 | | |
|
|
|
|
Plan assigned to (CDM) | 9/29/2016 | 9/29/2016 | 10/4/2016 | | PASS |
Carl D Madsen
|
|
|
|
Routing - Design Review | 9/30/2016 | | 10/4/2016 | | PASS |
Josh Wilson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/4/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/4/2016 | | DONE |
|
|
|
DO NOT RE-ISSUE PLAN MOD
|
Routing - PLAN CHECK | 9/30/2016 | | 9/30/2016 | | PASS |
Carl D Madsen
|
|
|
|
Plan Modification Accepted | | | 9/29/2016 | | DONE |
|
|
|
Plan Mod as requested by Platform Architecture for sidealk revisions
|
BLD-Other | 9/26/2016 | 9/27/2016 | 9/27/2016 | A | NR |
Jim Sly
|
|
|
Jake// 3hr firewall inspection Phone #: ###-#### Contractor to provide detail for 3 hr wall and UL listed/tested assembly.
|
(F) Reprint permit | | | 9/23/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/23/2016 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 9/15/2016 | 9/16/2016 | 9/16/2016 | A | PASS |
Jim Sly
|
|
|
Milton Phone #: ###-####
|
BLD-Concrete | 9/15/2016 | 9/15/2016 | 9/15/2016 | P | PASS |
Jim Sly
|
|
|
Milton Phone #: ###-#### OK pending MTI special Insp, tests and approvals.
|
BLD-Foundation | 8/12/2016 | 8/15/2016 | 8/15/2016 | P | PEND |
Tony Young
|
|
|
Milton Phone #: ###-####,, slab,, pending special inspection report
|
BLD-Foundation | 8/10/2016 | 8/11/2016 | 8/11/2016 | P | PART |
Jim Sly
|
|
|
walton Phone #: ###-#### Remaining walls at East Bldg OK pending MTI special insp, tests and approvals.
|
BLD-Wall Bracing | 7/27/2016 | 7/28/2016 | 7/28/2016 | A | PART |
Jim Sly
|
|
|
Mitchem Phone #: ###-#### Should be foundation wall. Closest wall to Eagle road. OK pending MTI special insp, tests and approvals.
|
BLD-Footing | 7/20/2016 | 7/20/2016 | 7/20/2016 | P | PART |
Jim Sly
|
|
|
Milton Phone #: ###-#### Area closest to Eagle Rd. OK Pending MTI special inspection, tests and approvals.
|
Issue PAID IN FULL permit | | | 6/29/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/29/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 6/24/2016 | | |
|
|
|
|
Plan assigned to (CDM) | 4/25/2016 | 4/25/2016 | 6/24/2016 | | PASS |
Carl D Madsen
|
|
|
First review completed
|
Routing - PUBLIC WORKS | 6/14/2016 | | 6/24/2016 | | PASS |
Rachael Beierle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/24/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/24/2016 | | DONE |
|
|
|
***all requirments met 6-28-16 /CEV
need GC & rev cert of val
|
Routing PW Drainage | 6/15/2016 | | 6/24/2016 | | PASS |
Brian Murphy
|
|
|
|
Routing Off Site - STRUCTURAL | 6/14/2016 | | 6/17/2016 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 6/14/2016 | | 6/17/2016 | | PASS |
Carl D Madsen
|
|
|
|
Routing PW Sewer Design | 6/15/2016 | | 6/16/2016 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing - FIRE | 6/14/2016 | 6/14/2016 | 6/15/2016 | | PASS |
Katie Marron
|
|
|
New locations of fire hydrants evaluated and approved by Assistant Fire Marshal, Ron Johnson. Revised report attached to case.
|
Routing PW Street Lights | 6/15/2016 | | 6/15/2016 | | PASS |
Tom Marshall
|
|
|
|
Routing - PUBLIC WORKS | 6/15/2016 | | 6/15/2016 | | PASS |
Beverly Mountain
|
|
|
|
Route to Impact Fee Review | 6/1/2016 | 6/4/2016 | 6/3/2016 | | PASS |
Cindy M. Gould
|
|
|
|
1st review completed | | | 6/1/2016 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 4/25/2016 | | 6/1/2016 | | FAIL |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 4/25/2016 | | 6/1/2016 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - PLANNING | 4/25/2016 | | 5/18/2016 | | PASS |
Ted Vanegas
|
|
|
|
Routing PW Drainage | 4/26/2016 | | 5/9/2016 | | FAIL |
Brian Murphy
|
|
|
NEEDS O AND M AGREEMENT
|
Routing PW Solid Waste | 4/26/2016 | | 5/5/2016 | | PASS |
Megan Durrell
|
|
|
|
Routing - Erosion and Sediment | 4/25/2016 | | 5/4/2016 | | PASS |
Evan Jenkins
|
|
|
(Site prep inspection and approval required prior to earth disturbance)
(9 PERMITS TOTAL FILED UNDER BLD16-01291 IN EPLANREVIEW) (STORAGE PLUS - Bldg A - Office / Caretaker's Residence) Removal of existing commercial building. Construction of a self-storage facility consisting of 9 buildings including an office and manager's residence with related site improvements.
|
Routing - MECHANICAL | 4/25/2016 | | 5/3/2016 | | PASS |
Troy James
|
|
|
|
Routing - Design Review | 4/25/2016 | | 4/29/2016 | | PASS |
Josh Wilson
|
|
|
|
Routing - FIRE | 4/25/2016 | 4/25/2016 | 4/27/2016 | | FAIL |
Katie Marron
|
|
|
Comments attached to case and emailed to architect.
|
Routing - PLANNING Land Div | 4/25/2016 | | 4/27/2016 | | PASS |
Todd Tucker
|
|
|
|
Routing PW Sewer Design | 4/26/2016 | | 4/27/2016 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Sewer in North Chapala Way: Replace cleanout at property line with manhole. Label manhole 627G11.
Key Note 26: Contact Boise Public Works 48 hours prior to capping sewer service at property line to obtain plug permit and schedule inspection.
|
Routing - PUBLIC WORKS | 4/25/2016 | | 4/26/2016 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Addressing | 4/25/2016 | | 4/25/2016 | | PASS |
Laura Hunter
|
|
|
Added residential address for caretaker residence: 4197 N Eagle Rd
|
Pending Assignment by TLW | 4/25/2016 | | 4/25/2016 | | DONE |
Tim L. Woodard
|
|
|
|
Plan Reviewer's activity | | | 4/22/2016 | | PASS |
|
|
|
Plan intake review approved
|
Intake Approval | | | 4/22/2016 | | PASS |
|
|
|
|
Intake Approval | | | 4/21/2016 | | FAIL |
Carl Westfall
|
|
|
(4-21-16) Please provide a separate application for each building. Make the application specific to the building is represents, including building valuations, square footage, etc.
|
Intake Approval | | | 4/20/2016 | | FAIL |
|
|
|
(4-20-16) See the circled items in the plan intake checklist.
|
Application received | | | 4/15/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 15 2016 2:12PM
|
Routing - PLUMBING | 4/25/2016 | | | | PASS |
Daryl Spivey
|
|
|
per plans and ISPC and red lines
|
Routing PW Street Lights | 4/26/2016 | | | | FAIL |
Tom Marshall
|
|
|
|