BLD-Final | 10/5/2016 | 10/6/2016 | 10/6/2016 | P | PASS |
Jim Sly
|
|
|
Jim I thought this permit had been finaled, just noticed there was a canceled foundation inspection today and noticed the final was still open. Note: there is no foundation related permit or inspection on this project. It is a exterior timber truss system tied into existing...we finished it this summer so sorry I had thought it was all finalled. It''s all outside in the back the gate is on the left side looking at the home-JUST BE SURE TO NOT LET THE DOG OUT IN AND OUT OF THE GATE. Call me before and I can meet you there - Thanks. Josh Phone #: ###-#### Inspection requested via web by Josh Murray
|
DOC - Permit Finaled | 10/6/2016 | 10/6/2016 | 10/6/2016 | P | PASS |
Jim Sly
|
|
|
|
BLD-Foundation | 10/3/2016 | 10/4/2016 | 10/5/2016 | A | CANC |
Jim Sly
|
|
|
Dane Phone #: ###-####
|
BLD-Final | 9/13/2016 | 9/13/2016 | 9/13/2016 | P | CANC |
Jim Sly
|
|
|
|
BLD-Framing/Rough-in | 4/26/2016 | 4/26/2016 | 4/26/2016 | P | PASS |
Jim Storey
|
|
|
Call 20 mintues before to meet // Josh Phone #: ###-####
|
Routing Walk-In (BLD) | 4/18/2016 | 4/18/2016 | 4/18/2016 | P | PASS |
Tisha Gallop
|
|
|
|
Plan assigned to (LEG) Tisha | 4/18/2016 | | 4/18/2016 | | DONE |
Tisha Gallop
|
|
|
|
1st review completed | | | 4/18/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/18/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/18/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/18/2016 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/18/2016 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 4/15/2016 | 4/15/2016 | 4/15/2016 | P | PASS |
Colleen T Carroll
|
|
|
|
Application received | | 4/15/2016 | | | |
|
|
|
|