BLD-Final | 6/15/2017 | 6/16/2017 | 6/16/2017 | A | PASS |
Jim Sly
|
|
|
Trenna Phone #: ###-####
|
DOC - Permit Finaled | 6/16/2017 | 6/16/2017 | 6/16/2017 | P | PASS |
Jim Sly
|
|
|
|
BLD-Energy code compliance | 1/17/2017 | 1/18/2017 | 1/18/2017 | A | PASS |
Jim Sly
|
|
|
Greg Phone #: ###-####
|
BLD-Framing/Rough-in | 1/12/2017 | 1/13/2017 | 1/13/2017 | A | PASS |
Jim Sly
|
|
|
Greg Phone #: ###-####
|
BLD-Wall Bracing | 12/12/2016 | 12/13/2016 | 12/13/2016 | A | PASS |
Jim Sly
|
|
|
Greg Phone #: ###-####
|
BLD-Foundation | 9/28/2016 | 9/28/2016 | 9/28/2016 | P | PASS |
Jim Sly
|
|
|
Phil Phone #: ###-####
|
BLD-Footing | 9/27/2016 | 9/27/2016 | 9/27/2016 | P | PASS |
Jim Sly
|
|
|
Shop in the back // Bill Phone #: ###-####
|
Routing - MECHANICAL | 9/15/2016 | | 9/15/2016 | | PASS |
Chad Schwendiman
|
|
|
Resubmittal
|
OVERRIDE | | | 9/1/2016 | | |
|
|
|
|
Plan assigned to (DAF) | 8/30/2016 | 8/30/2016 | 9/1/2016 | | DONE |
David Ferguson
|
|
|
|
Routing - PLAN CHECK | 8/30/2016 | | 9/1/2016 | | PASS |
David Ferguson
|
|
|
|
Routing - PLANNING | 9/1/2016 | | 9/1/2016 | | PASS |
Celine Acord
|
|
|
driveway width can only be 33' within the front setback (20')
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/1/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/1/2016 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 9/1/2016 | | DONE |
|
|
|
no fees due per Christina Prado
|
Plan Modification Accepted | | | 8/30/2016 | | DONE |
|
|
|
plan mod received 1 set of eng calcs,1 set of sheet A1-1 (18x24) and 1 set of A3-1, A3-2, A3-3, E1-1, A4-1, A2-2, A2-1 (8 1/2x11)-took to Dave F
|
Routing Walk-In (BLD) | 8/29/2016 | 8/29/2016 | 8/29/2016 | A | FAIL |
Brian McGowan
|
|
|
Need updated site plan and current updated engineering
|
BLD-Foundation | 8/2/2016 | 8/2/2016 | 8/3/2016 | P | PASS |
Jim Sly
|
|
|
Bill Phone #: ###-####
|
BLD-Footing | 7/25/2016 | 7/26/2016 | 7/26/2016 | A | PASS |
Jim Sly
|
|
|
Late morning // Bill Phone #: ###-####
|
Issue PAID IN FULL permit | | | 6/30/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/30/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 6/13/2016 | | |
|
|
|
|
Plan assigned to (DAF) | 5/17/2016 | 5/17/2016 | 6/13/2016 | | PASS |
David Ferguson
|
|
|
due 5/31 - 2nd plan review passed - still may be an issue with planning do to having a duplex design.
|
Routing - PLANNING | 6/13/2016 | | 6/13/2016 | | PASS |
Celine Acord
|
|
|
approved. no duplex approval needed if 220V is removed from 'meat room' on lower level
|
Routing - PLAN CHECK | 6/13/2016 | | 6/13/2016 | | PASS |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/13/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/13/2016 | | DONE |
|
|
|
all requirements met
|
Routing - PLAN CHECK | 6/9/2016 | | 6/9/2016 | | FAIL |
David Ferguson
|
|
|
Plans as drawn are considered to be a duplex. Fire separation details will need to be provided.
|
Routing - PLANNING | 6/9/2016 | | 6/9/2016 | | FAIL |
Celine Acord
|
|
|
driveway width cannot be wider than 33' along public right of way. floor plan is consistent with duplex and requires a duplex approval or redesign to be approved.
|
Routing - PLANNING | 5/27/2016 | | 5/27/2016 | | FAIL |
Celine Acord
|
|
|
- driveway cannot exceed 33' in width along right of way
- duplex approval is required due to exterior stairs/second entrance, and second kitchen
|
1st review completed | | | 5/27/2016 | | FAIL |
David Ferguson
|
|
|
|
Routing - PLAN CHECK | 5/17/2016 | | 5/27/2016 | | FAIL |
David Ferguson
|
|
|
|
Routing - MECHANICAL | 5/20/2016 | | 5/20/2016 | | PASS |
Troy James
|
|
|
|
Routing - Addressing | 5/17/2016 | | 5/19/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - MECHANICAL | 5/17/2016 | | 5/18/2016 | | FAIL |
Troy James
|
|
|
emailed corrections to Northwest htg
|
Routing - PUBLIC WORKS | 5/17/2016 | | 5/17/2016 | | PASS |
Rachael Beierle
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/17/2016 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 5/17/2016 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/17/2016 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (LEG) Tisha | 5/17/2016 | | 5/17/2016 | | DEFR |
Tisha Gallop
|
|
|
|
Application received | | | 4/18/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 18 2016 12:01PM
|