BLD-Aging Inspection | 10/20/2016 | 10/20/2016 | 10/21/2016 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 10/19/2016 | 10/19/2016 | 10/21/2016 | | PEND |
Tony Young
|
|
|
|
BLD-Framing/Rough-in | 6/7/2016 | 6/7/2016 | 6/7/2016 | P | PASS |
Tony Young
|
|
|
Dan, phone ###-####
|
BLD-Other | 5/26/2016 | 5/26/2016 | 5/26/2016 | P | PASS |
Tony Young
|
|
|
Fire tent over lights // Dan Phone #: ###-####,, soffits ok
|
BLD-Wall Bracing | 5/20/2016 | 5/20/2016 | 5/20/2016 | P | PASS |
Tony Young
|
|
|
Bob Phone #: ###-####
|
BLD-Conference | 5/19/2016 | 5/20/2016 | 5/20/2016 | A | PASS |
Tony Young
|
|
|
Bob Phone #: ###-####,, ?s on wui,, shear ok
|
BLD-Foundation | 4/27/2016 | 4/28/2016 | 4/28/2016 | A | PART |
Tony Young
|
|
|
Dan Phone #: ###-####,, work in progress,, ok,, need to clean site and use bmp's for ESC,, scheduled ALong for follow up
|
BLD-Footing | 4/26/2016 | 4/27/2016 | 4/27/2016 | A | PASS |
Tony Young
|
|
|
Bob Phone #: ###-####
|
PubWorks Subgrade Approval | 4/27/2016 | 4/27/2016 | 4/27/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Plan Modification Accepted | | | 4/27/2016 | | DONE |
|
|
|
add to scope of work repair of existing foundation between house and new garage per enegineering
|
Routing - PLAN CHECK | 4/27/2016 | | 4/27/2016 | | PASS |
Tisha Gallop
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/27/2016 | | DONE |
|
|
|
no fee
|
CHANGE STATUS TO (ISS) | | | 4/27/2016 | | DONE |
|
|
|
|
BLD-Footing | 4/26/2016 | 4/26/2016 | 4/26/2016 | P | NR |
Tony Young
|
|
|
Bob Phone #: ###-####,, needs soil report 1st
|
OVERRIDE | | | 4/21/2016 | | |
|
|
|
|
Routing Walk-In (BLD) | 4/19/2016 | 4/19/2016 | 4/21/2016 | P | PASS |
Tisha Gallop
|
|
|
|
Plan assigned to (LEG) Tisha | 4/19/2016 | | 4/21/2016 | | DONE |
Tisha Gallop
|
|
|
**walk-in received 4/19; in route at hillside
|
Routing PW Grading-Hillside | 4/20/2016 | | 4/21/2016 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Inspection Record Card- Bld | | | 4/21/2016 | | DONE |
|
|
|
|
1st review completed | | | 4/21/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/21/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/21/2016 | | DONE |
|
|
|
all requirments met
|
Issue PAID IN FULL permit | | | 4/21/2016 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 4/19/2016 | | 4/20/2016 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
Permit to demolish existing attached garage and construct new 576 sq. ft. garage and 216 attached carport. Separate erosion and electrical permits are required. All work is to be done according to approved plans, current local codes. //leg
|
Routing Walk-In (Zoning) | 4/19/2016 | 4/19/2016 | 4/19/2016 | P | PASS |
David Moser
|
|
|
remove and install new garage - R-1B zone
|
Application received | | 4/19/2016 | | | |
|
|
|
|