BLD-Final | 8/29/2016 | 8/29/2016 | 8/29/2016 | P | PASS |
Jim Sly
|
|
|
Bob Phone #: ###-####
|
DOC - Permit Finaled | 8/29/2016 | 8/29/2016 | 8/29/2016 | P | PASS |
Jim Sly
|
|
|
|
BLD-Concrete | 8/3/2016 | 8/4/2016 | 8/4/2016 | A | PASS |
Jim Sly
|
|
|
Bob Phone #: ###-####
|
BLD-Conference | 7/18/2016 | 7/18/2016 | 7/18/2016 | P | DONE |
Jim Sly
|
|
|
Bob Phone #: ###-####
|
Inspection Record Card- Bld | | | 7/7/2016 | | DONE |
|
|
|
|
Telephone call | | | 7/7/2016 | | DONE |
|
|
|
Spoke with Robert informing him that his permit is ready and the fee amount that is due
|
Issue PAID IN FULL permit | | | 7/7/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 7/6/2016 | | |
|
|
|
|
Routing - PLANNING | 7/6/2016 | | 7/6/2016 | | PASS |
Leon Letson
|
|
|
|
Routing - PLAN CHECK | 7/6/2016 | | 7/6/2016 | | PASS |
Tisha Gallop
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/6/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/6/2016 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 7/6/2016 | | |
|
|
|
|
Permit Ready to Issue | | | 7/6/2016 | | DONE |
|
|
|
Can not be issued until after 5pm of 7/6 per Leon
|
Routing Walk-In (Zoning) | 6/15/2016 | 6/15/2016 | 6/15/2016 | A | FAIL |
Josh Wilson
|
|
|
Needs Zoning Certificate approval for a detached accessory structure over 1,000 square feet. XREF CZC16-00171.
|
Routing Walk-In (BLD) | 6/15/2016 | 6/15/2016 | 6/15/2016 | A | FAIL |
David Ferguson
|
|
|
need revised engineering to show "no" reductions in the roof load
|
Routing Walk-In (BLD) | 4/19/2016 | 4/19/2016 | 4/19/2016 | P | |
David Ferguson
|
|
|
Need Zoning Certificate because it's over 1,000 sq. ft.. Also need engineering for the pole barn style building. Engineering that the customer had was for a different size and design building. He was told that he needs engineering for the building that he wants to build.
|
1st review completed | | | 4/19/2016 | | FAIL |
|
|
|
|
Application received | | 4/19/2016 | | | |
|
|
|
|