Third Notice | | 11/26/2016 | 12/8/2016 | | DONE |
|
|
|
This permit finaled on the web by Cecyle Brock
|
Third Notice | | 10/22/2016 | 11/21/2016 | | DONE |
|
|
|
|
Second Notice | | 9/22/2016 | 10/17/2016 | | DONE |
|
|
|
Mailed 10-18-16
|
First Notice | | 8/18/2016 | 9/12/2016 | | DONE |
|
|
|
Mailed 9-13-16
|
BLD-Final | 8/8/2016 | 8/8/2016 | 8/8/2016 | P | PASS |
Jim Storey
|
|
|
Randy Phone #: ###-####
|
Permanent Occupancy | | | 8/8/2016 | | DONE |
|
|
|
|
BLD-Final | 8/4/2016 | 8/5/2016 | 8/5/2016 | A | PART |
Jim Storey
|
|
|
Randy Phone #: ###-#### final ok pending pw
|
PubWorks Occupancy Approval | 8/5/2016 | 8/5/2016 | 8/5/2016 | | DONE |
Tiffany Lowery
|
|
|
|
FIRE-Final Inspection | 7/25/2016 | 7/26/2016 | 7/26/2016 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. No fire alarm modifications had been performed.
|
FIRE-Conference | 7/20/2016 | 7/20/2016 | 7/20/2016 | P | DONE |
Jim Page
|
|
|
Fire conference complete
|
BLD-Conference | 7/7/2016 | 7/7/2016 | 7/7/2016 | P | PASS |
Jim Storey
|
|
|
would like call ahead; Randy Phone #: ###-#### framing and engery code ok pending mti reports
|
BLD-Energy code compliance | 6/21/2016 | 6/21/2016 | 6/21/2016 | P | PART |
Jim Storey
|
|
|
Randy Phone #: ###-#### insulation ok/ need reviewed plan
|
BLD-Foundation | 6/16/2016 | 6/17/2016 | 6/17/2016 | A | CANC |
Dave Hannah
|
|
|
Rebar // Randy Phone #: ###-####
|
Route to Impact Fee Review | 6/3/2016 | 6/6/2016 | 6/10/2016 | | PASS |
Cindy M. Gould
|
|
|
|
Issue PAID IN FULL permit | | | 6/10/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/10/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 6/8/2016 | | |
|
|
|
|
Plan resubmittals received | | | 6/8/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/8/2016 | | 6/8/2016 | | PASS |
Tim L. Woodard
|
|
|
Approved structural engineering without routing back to outsource. TLW
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/8/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/8/2016 | | DONE |
|
|
|
need ACHD stating if an inspection is needed or not ***met GC & rev cert of val***
|
Plan assigned to (TLW) | 5/11/2016 | | 6/8/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 5/11/2016 | | 6/3/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Routing Off Site - STRUCTURAL | 5/11/2016 | | 6/3/2016 | | FAIL |
Tim L. Woodard
|
|
|
see TLW remarks-he did review on corrections
|
1st review completed | | | 6/3/2016 | | DONE |
|
|
|
|
Routing PW Drainage | 5/27/2016 | | 5/27/2016 | | PASS |
Brian Murphy
|
|
|
NEEDS SWALE TEST
|
Routing PW Street Lights | 5/16/2016 | | 5/25/2016 | | PASS |
Tom Marshall
|
|
|
No street lights required.
|
Routing PW Drainage | 5/16/2016 | | 5/24/2016 | | FAIL |
Brian Murphy
|
|
|
PERC RATE 8 INCHES PER HOUR O AND M AGEEMENT
|
Routing - PLANNING Land Div | 5/11/2016 | | 5/19/2016 | | PASS |
Todd Tucker
|
|
|
|
Routing - PUBLIC WORKS | 5/11/2016 | | 5/16/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - FIRE | 5/11/2016 | 5/11/2016 | 5/13/2016 | | PASS |
Katie Marron
|
|
|
Comments attached to case.
|
Routing - Erosion and Sediment | 5/11/2016 | | 5/12/2016 | | PASS |
Andy J. Long
|
|
|
ESC site map and narrative submitted and approved. Valid Plan Designer; RP to be designated
|
Routing - Addressing | 5/11/2016 | | 5/12/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - Design Review | 5/11/2016 | | 5/11/2016 | | PASS |
Andrea Tuning
|
|
|
|
Pending Assignment by TLW | 5/11/2016 | | 5/11/2016 | | DONE |
Tim L. Woodard
|
|
|
|
Plan Reviewer's activity | | | 5/6/2016 | | PASS |
|
|
|
Plan intake review approved
|
Intake Approval | | | 5/6/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Intake Approval | | | 4/25/2016 | | FAIL |
|
|
|
(4-25-16) Please see the plan intake checklist and resolve each circled item.
|
Intake Approval | | | 4/21/2016 | | FAIL |
Carl Westfall
|
|
|
(4-21-16) Please refer to the circled items on the plan intake checklist and provide the requested items.
|
Application received | | | 4/20/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 20 2016 2:33PM
|