Permit Information
Permit NumberBLD16-01364
StatusFinaled
Name EKC INC
Site Address 6752 S BUSINESS WAY
Project NameFedEx Ground Relocated Mod Doc
Customer Number 
ePlanReviewYes
Description
(FEDEX GROUND – Dock Expansion) Permit to construct a new 588 square foot modular building being permitted as a new building due to not having an Idaho Tag on the building. This building is fire sprinklered for unlimited area building. Note: an alternate is approved on this project in regards to energy code compliance. Scope of work includes: construction of poured concrete foundation, placement and securement of addition, new opening in the exterior wall of the existing building, new electrical, and related site work. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 11/26/201612/8/2016 DONE
This permit finaled on the web by Cecyle Brock
Third Notice 10/22/201611/21/2016 DONE
Second Notice 9/22/201610/17/2016 DONE
Mailed 10-18-16
First Notice 8/18/20169/12/2016 DONE
Mailed 9-13-16
BLD-Final8/8/20168/8/20168/8/2016PPASS
DetailsJim Storey
Randy Phone #: ###-####
Permanent Occupancy  8/8/2016 DONE
BLD-Final8/4/20168/5/20168/5/2016APART
DetailsJim Storey
Randy Phone #: ###-#### final ok pending pw
PubWorks Occupancy Approval8/5/20168/5/20168/5/2016 DONE
DetailsTiffany Lowery
FIRE-Final Inspection7/25/20167/26/20167/26/2016APASS
DetailsTroy Cobbley
Life safety passed. No fire alarm modifications had been performed.
FIRE-Conference7/20/20167/20/20167/20/2016PDONE
DetailsJim Page
Fire conference complete
BLD-Conference7/7/20167/7/20167/7/2016PPASS
DetailsJim Storey
would like call ahead; Randy Phone #: ###-#### framing and engery code ok pending mti reports
BLD-Energy code compliance6/21/20166/21/20166/21/2016PPART
DetailsJim Storey
Randy Phone #: ###-#### insulation ok/ need reviewed plan
BLD-Foundation6/16/20166/17/20166/17/2016ACANC
DetailsDave Hannah
Rebar // Randy Phone #: ###-####
Route to Impact Fee Review6/3/20166/6/20166/10/2016 PASS
DetailsCindy M. Gould
Issue PAID IN FULL permit  6/10/2016 DONE
Print Occupancy Form  6/10/2016 DONE
OVERRIDE  6/8/2016  
Plan resubmittals received  6/8/2016 DONE
Routing - PLAN CHECK6/8/2016 6/8/2016 PASS
DetailsTim L. Woodard
Approved structural engineering without routing back to outsource. TLW
PLANS/APPL TAKEN TO FRONT DESK  6/8/2016 DONE
Permit Ready to Issue  6/8/2016 DONE
need ACHD stating if an inspection is needed or not ***met GC & rev cert of val***
Plan assigned to (TLW)5/11/2016 6/8/2016 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK5/11/2016 6/3/2016 PASS
DetailsTim L. Woodard
Routing Off Site - STRUCTURAL5/11/2016 6/3/2016 FAIL
DetailsTim L. Woodard
see TLW remarks-he did review on corrections
1st review completed  6/3/2016 DONE
Routing PW Drainage5/27/2016 5/27/2016 PASS
DetailsBrian Murphy
NEEDS SWALE TEST
Routing PW Street Lights5/16/2016 5/25/2016 PASS
DetailsTom Marshall
No street lights required.
Routing PW Drainage5/16/2016 5/24/2016 FAIL
DetailsBrian Murphy
PERC RATE 8 INCHES PER HOUR O AND M AGEEMENT
Routing - PLANNING Land Div5/11/2016 5/19/2016 PASS
DetailsTodd Tucker
Routing - PUBLIC WORKS5/11/2016 5/16/2016 PASS
DetailsRachael Beierle
Routing - FIRE5/11/20165/11/20165/13/2016 PASS
DetailsKatie Marron
Comments attached to case.
Routing - Erosion and Sediment5/11/2016 5/12/2016 PASS
DetailsAndy J. Long
ESC site map and narrative submitted and approved. Valid Plan Designer; RP to be designated
Routing - Addressing5/11/2016 5/12/2016 PASS
DetailsLaura Hunter
Routing - Design Review5/11/2016 5/11/2016 PASS
DetailsAndrea Tuning
Pending Assignment by TLW5/11/2016 5/11/2016 DONE
DetailsTim L. Woodard
Plan Reviewer's activity  5/6/2016 PASS
Plan intake review approved
Intake Approval  5/6/2016 PASS
DetailsTim L. Woodard
Intake Approval  4/25/2016 FAIL
(4-25-16) Please see the plan intake checklist and resolve each circled item.
Intake Approval  4/21/2016 FAIL
DetailsCarl Westfall
(4-21-16) Please refer to the circled items on the plan intake checklist and provide the requested items.
Application received  4/20/2016 DONE
Application submitted via PDS Online on Apr 20 2016 2:33PM