BLD-Final | 1/5/2018 | 1/8/2018 | 1/8/2018 | P | PASS |
Brandon Shaw
|
|
|
Please call ahead for access - Jeramie Phone #: ###-####
|
DOC - Permit Finaled | 1/8/2018 | 1/8/2018 | 1/8/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Aging Inspection | 3/23/2017 | 3/23/2017 | 3/28/2017 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 3/22/2017 | 3/22/2017 | 3/28/2017 | | PEND |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 11/7/2016 | 11/7/2016 | 11/8/2016 | P | PASS |
Dave Hannah
|
|
|
Jeremy Phone #: ###-####
|
BLD-Energy code compliance | 11/2/2016 | 11/2/2016 | 11/2/2016 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 11/1/2016 | 11/2/2016 | 11/2/2016 | A | PASS |
Dave Hannah
|
|
|
Jeramie Phone #: ###-####
|
BLD-Framing/Rough-in | 10/26/2016 | 10/26/2016 | 10/26/2016 | P | FAIL |
Dave Hannah
|
|
|
jeremy Phone #: ###-#### needs other trades to finish rough in remove sheetrock from ceilling at beam and headers
|
BLD-Other | 7/15/2016 | 7/18/2016 | 7/18/2016 | A | PART |
Dave Hannah
|
|
|
Jeramie Phone #: ###-#### shear ok and reroofing
|
BLD-Foundation | 6/20/2016 | 6/20/2016 | 6/20/2016 | P | PART |
Phil Shearer
|
|
|
|
BLD-Footing | 6/17/2016 | 6/17/2016 | 6/17/2016 | P | PASS |
Dave Hannah
|
|
|
Jeramie Phone #: ###-####
|
OVERRIDE | | | 5/23/2016 | | |
|
|
|
|
Telephone call | | | 5/23/2016 | | DONE |
|
|
|
Left a message for Jeramie informing him that this permit is ready and the fee amount due. Stated that is he is going to be doing the PLM, MEC and/or ELE work then we can get those permits going to issue with this BLD or if hiring someone they would need to pull the permit
|
Issue PAID IN FULL permit | | | 5/23/2016 | | DONE |
|
|
|
|
(F) Reprint permit | | | 5/23/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/23/2016 | | 5/23/2016 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 5/23/2016 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 5/23/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/23/2016 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 5/23/2016 | | DONE |
|
|
|
All Met
|
Routing Walk-In (BLD) | 5/17/2016 | 5/17/2016 | 5/17/2016 | A | FAIL |
David Ferguson
|
|
|
I took the plans in as a level 2 since I have been talking to them.
There are still structural issues that can be solved with more conversations or better drawings.
|
Routing Walk-In (BLD) | 5/13/2016 | 5/13/2016 | 5/13/2016 | A | FAIL |
Brian McGowan
|
|
|
Need accurate drawings showing trusses will provide adequate headroom or if using a hand stack methos that the materials meet requirements
|
Routing - PLAN CHECK | 5/13/2016 | | 5/13/2016 | | FAIL |
Brian McGowan
|
|
|
|
Routing Walk-In (Zoning) | 4/22/2016 | 4/22/2016 | 4/22/2016 | P | PASS |
Celine Acord
|
|
|
|
Routing Walk-In (BLD) | 4/22/2016 | 4/22/2016 | 4/22/2016 | P | FAIL |
Brian McGowan
|
|
|
Plans were incomplete. Truss layout needed or stick frame details.
|
1st review completed | | | 4/22/2016 | | FAIL |
Brian McGowan
|
|
|
Need more structural information.
|
Application received | | 4/22/2016 | | | |
|
|
|
|