Permit Information
Permit NumberBLD16-01411
StatusFinaled
Name BRUNO BUILT INC
Site Address 2659 E MESA VERDE CT
Project NameDavis Residence
Customer Number 
ePlanReviewYes
Description
WUI Zone A ** Permit for the construction of a new 5413 sq. ft., two story (first story 4127 sq. ft., second story 1286 sq. ft.) single family dwelling with 5 bedrooms, 3.5 bathrooms, approximately 900 sq. ft. of covered patio/porch and a 1604 sq. ft. attached garage per the approved plans, and any notations. R-1A/DA zoning and setbacks per planning. **DAF**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/5/20179/6/20179/6/2017APASS
DetailsDave Hannah
Late morning please. Call Robert Bruno ###-#### Phone #: ###-#### Inspection requested via web by Admin Assistant
DOC - Permit Finaled9/6/20179/6/20179/6/2017PPASS
DetailsDave Hannah
PubWorks Occupancy Approval9/6/20179/6/20179/6/2017 DONE
DetailsJason C. Taylor
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
BLD-Final8/31/20179/1/20179/1/2017ACANC
DetailsDave Hannah
Late morning please. Call Robert at ###-####. Phone #: ###-#### Inspection requested via web by Admin Assistant
BLD-Final8/30/20178/31/20178/31/2017ANR
DetailsDave Hannah
Please contact Robert Bruno at ###-#### Phone #: ###-#### Inspection requested via web by Admin Assistant
BLD-Energy code compliance3/8/20173/9/20173/10/2017PPASS
DetailsDave Hannah
Robert Phone #: ###-####
BLD-Framing/Rough-in3/7/20173/7/20173/7/2017PPASS
DetailsDave Hannah
Robert-partial-everything but the front porch-please call 30 minutes prior to meet Phone #: ###-####
BLD-Wall Bracing1/25/20171/26/20171/26/2017APASS
DetailsMike Jordan
Mike Phone #: ###-####. Exterior shear walls only ok. Needs to install all interior holdowns, can inspect on framing inspection.
Plan Modification Accepted  1/26/2017 DONE
new manual j report
Routing - MECHANICAL1/26/2017 1/26/2017 PASS
DetailsTroy James
resubmitted manual j report
BLD-Wall Bracing12/30/20161/3/20171/3/2017ANR
DetailsPhil Shearer
mike Phone #: ###-####
BLD-Conference10/10/201610/11/201610/11/2016ADONE
DetailsDave Hannah
Mike Phone #: ###-####
BLD-Foundation10/4/201610/4/201610/5/2016PPASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Ben Sears
BLD-Footing9/30/201610/3/201610/3/2016APASS
DetailsPhil Shearer
Phone #: ###-#### Inspection requested via web by Ben Sears
BLD-Conference9/29/20169/29/20169/29/2016PNR
DetailsDave Hannah
Porch and patio pier footings. call before en route, may not be ready Phone #: ###-#### Inspection requested via web by Ben Sears
BLD-Foundation9/15/20169/15/20169/15/2016APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Ben Sears
BLD-Footing9/8/20169/9/20169/9/2016APASS
DetailsJim Storey
request early inspection. would like to pour at 10:00 Phone #: ###-#### Inspection requested via web by Ben Sears j taylor ok ed fill compaction. rebar ok
BLD-Footing9/8/20169/8/20169/8/2016PNR
DetailsMike Jordan
Request inspection after 3 Phone #: ###-#### Inspection requested via web by Ben Sears
BLD-Foundation8/24/20168/24/20168/24/2016PPASS
DetailsPhil Shearer
Pouring Thursday morning. Request inspection after 2pm Phone #: ###-#### Inspection requested via web by Ben Sears
BLD-Footing8/18/20168/19/20168/19/2016APASS
DetailsPhil Shearer
Request early poor at 9:30 Phone #: ###-#### Inspection requested via web by Ben Sears. 1st part of exteror footing.
BLD-Footing8/18/20168/18/20168/18/2016PNR
DetailsPhil Shearer
Request later inspection between 3-4 Phone #: ###-#### Inspection requested via web by Ben Sears
PubWorks Subgrade Approval8/18/20168/18/20168/18/2016 DONE
DetailsJason C. Taylor
( entire area) A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
Issue PAID IN FULL permit  6/16/2016 DONE
Inspection Record Card- Bld  6/16/2016 DONE
OVERRIDE  5/23/2016  
Plan assigned to (DAF)5/4/20165/4/20165/23/2016 DONE
DetailsDavid Ferguson
due 5/19 L2 hillside - plan review completed 5/13 - building and fire failed it.
Routing - PLAN CHECK5/23/2016 5/23/2016 PASS
DetailsDavid Ferguson
PLANS/APPL TAKEN TO FRONT DESK  5/23/2016 DONE
Permit Ready to Issue  5/23/2016 DONE
all requirments met
Routing - FIRE5/20/20165/20/20165/20/2016 PASS
DetailsScott Arellano
No additional comments attached.
1st review completed  5/13/2016 FAIL
DetailsDavid Ferguson
Routing - PLAN CHECK4/28/2016 5/13/2016 FAIL
DetailsDavid Ferguson
Routing PW Grading-Hillside4/28/2016 5/9/2016 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
Plan assigned to (LEG) Tisha4/28/2016 5/4/2016 DEFR
DetailsTisha Gallop
Routing - MECHANICAL4/28/2016 5/3/2016 PASS
DetailsTroy James
Routing - Erosion and Sediment4/28/2016 5/2/2016 PASS
DetailsEvan Jenkins
ESC plan submitted and approved. Valid RP and PD. BMP installation and site preparation inspection REQUIRED prior to earth disturbance.
Routing - PLANNING4/28/2016 4/29/2016 PASS
DetailsCeline Acord
CFH16-00012
Routing - FIRE4/28/20164/28/20164/28/2016 FAIL
DetailsKatie Marron
Comments attached to case and emailed to applicant.
Routing - Addressing4/28/2016 4/28/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS4/28/2016 4/28/2016 PASS
DetailsRachael Beierle
Plans ACCEPTED BY PLAN TECH  4/28/2016 DONE
DetailsChristina Prado
Intake Approval  4/28/2016 PASS
DetailsChristina Prado
Override - Parcel Holds  4/28/2016  
Recd Pcfee & Taken To Pln CK  4/28/2016 DONE
DetailsChristina Prado
Application received  4/25/2016 DONE
Application submitted via PDS Online on Apr 25 2016 9:20AM