Permit Information
Permit NumberBLD16-01427
StatusFinaled
Name ESI
Site Address 4481 W WILLOW LN
Project NameSerena House - New Building
Customer Number 
ePlanReviewYes
Description
(SERENA HOUSE – NEW BUILDING – TRANSITIONAL HOUSING - EXPANSION OF CAMPUS) (CUP15-00079) (9-30-16 PLAN MODIFICATION TO CHANGE THE ROUTING OF MECHANICAL DUCTS AND TO SHOW CEILING RADIATION DAMPERS AND FIRE/SMOKE DAMPERS.) (8-9-16 PLAN MODIFICATION TO REVISE THE KITCHENS TO INCLUDE AN OVERHEAD DOOR LISTED AND LABELED FOR A FIRE-RESISTANCE-RATED CORRIDOR WALL. DOOR SHALL BE AUTOMATIC CLOSING BY ACTUATION OF SMOKE DETECTORS.) The fire sprinkler system per NFPA 13 is used to allow dead end corridors more than 20 feet long and as required for R-2 Occupancies. To construct a 10,382 square foot building (5,355 square feet 1st story and 5,027 square feet 2nd story) to be used for transitional housing for women and children (4,492 square feet 1st story and 4,264 square feet 2nd story) and for offices (762 square feet 1st story and 719 square feet 2nd story). Work is to include concrete footings, concrete foundation, concrete slab on grade, wood stud exterior walls, interior and exterior shear walls, interior and exterior bearing walls, wood floor joists, wood roof trusses, wood sheathing for floor and roof diaphragms, asphalt shingles, wood siding, fiber cement siding, exterior windows, exterior doors, one interior stairway, one interior stairway rated like a corridor, one exterior stairway, interior fire-rated corridors, interior nonbearing walls, interior doors, millwork, and interior finishes. The restroom that serves the office area is required to be accessible to the disabled. Two sleeping rooms and their restrooms on the 1st story are required to comply as accessible units. All other sleeping rooms and their restrooms on the 1st story are required to comply as Type B sleeping units. Special Inspection required for soils, concrete, welding, wood diaphragms, and wood shear walls. Metal plate wood trusses are a deferred submittal item. New concrete steps and handrails, a new trash enclosure, and a new 250 square foot storage shed will be constructed at or near the existing “T” shaped building. The work is required to comply with the approved drawings, with the plan review report, with the structural design, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system, if provided, is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  3/21/2017 DONE
Third Notice 2/18/20173/9/2017 DONE
DetailsChristina Prado
mailed 3/10/17
Second Notice 1/20/20172/13/2017 DONE
sent 2-14-17
First Notice 1/1/20171/10/2017 DONE
Mailed 1-11
Print Occupancy Form  12/22/2016 DONE
Permanent Occupancy  12/22/2016 DONE
BLD-Final12/20/201612/21/201612/21/2016APASS
DetailsTony Young
Dusty Phone #: ###-####,, ok for perm occupancy
BLD-Final12/19/201612/20/201612/20/2016APEND
DetailsTony Young
Dusty Phone #: ###-####
BLD-Final12/16/201612/19/201612/19/2016APART
DetailsTony Young
Dusty Phone #: ###-####,, back railings not 100% yet
BLD-Final12/15/201612/16/201612/16/2016PPART
DetailsTony Young
Dusty Phone #: ###-####,, Temp occ. ok,, just working on the hand/guard rail off the back deck area
FIRE-Final Inspection12/15/201612/16/201612/16/2016APASS
DetailsJim Page
Final fire sprinkler inspection complete, final fire alarm inspection complete, knox box is in place, fire extinguishers are in place with current inspection tags. Final life fire safety inspection passed/complete.
PubWorks Occupancy Approval12/14/201612/14/201612/14/2016 DONE
DetailsTiffany Lowery
BLD-Final12/6/201612/7/201612/7/2016PNR
DetailsTony Young
Dusty Phone #: ###-####,, need f/l/s,, walk through,, c/n posted
Zoning Approval12/7/201612/7/201612/7/2016 DONE
DetailsSusan Riggs
BLD-Wall cover10/13/201610/14/201610/14/2016APASS
DetailsTony Young
Dusty Phone #: ###-####,, interior drywall bracing ok
BLD-Wall Bracing10/12/201610/13/201610/13/2016PDEFR
DetailsTony Young
Dusty Phone #: ###-####
BLD-Foundation10/6/201610/7/201610/7/2016APASS
DetailsJim Sly
trash enclosure; Dusty Phone #: ###-####
CHANGE STATUS TO (ISS)  10/6/2016 DONE
plan mod fees paid
(F) Reprint permit  10/6/2016 DONE
BLD-Energy code compliance9/28/20169/30/20169/30/2016APART
DetailsTony Young
Randy Phone #: ###-####,, walls ok
OVERRIDE  9/30/2016  
Plan assigned to (CJW)9/28/20169/28/20169/30/2016 PASS
DetailsCarl Westfall
Routing - PLAN CHECK9/28/2016 9/30/2016 PASS
DetailsCarl Westfall
3rd plan mod
PLANS/APPL TAKEN TO FRONT DESK  9/30/2016 DONE
Permit Ready to Issue  9/30/2016 DONE
plan mod ONLY - DO NOT RE-ISSUE
Plan Modification Accepted  9/28/2016 DONE
DetailsChristina Prado
For Mechanical updates
BLD-Framing/Rough-in9/26/20169/27/20169/27/2016PPART
DetailsTony Young
Dusty Phone #: ###-####,, straps ok,, fire caulking ok,, still need other items
BLD-Framing/Rough-in9/22/20169/26/20169/26/2016APART
DetailsTony Young
Dusty Phone #: ###-####,, walk through,, ok to insulate walls,, NEED.. tempered glass,, finish fire caulking,, stairs per code,, justify shed roof venting,, backing for hand rails,, strap top plates, etc
BLD-Framing/Rough-in9/16/20169/19/20169/19/2016ANR
DetailsTony Young
Dusty Phone #: ###-####,, ?s on cut outs,, ok if per engineering,, ?s about chases
BLD-Framing/Rough-in9/12/20169/13/20169/13/2016ACANC
DetailsMike Jordan
Dusty Phone #: ###-####
BLD-Conference9/13/20169/13/20169/13/2016ADONE
DetailsMike Jordan
Dusty Phone #: ###-####
BLD-Framing/Rough-in8/30/20168/31/20168/31/2016APART
DetailsTony Young
Dusty Phone #: ###-####,, interior hold downs,, shear walls
BLD-Wall Bracing8/26/20168/29/20168/29/2016APART
DetailsTony Young
Shear // Dusty Phone #: ###-####,, upper drywall for drops in hall way ok
BLD-Wall Bracing8/24/20168/25/20168/25/2016PPART
DetailsTony Young
Dusty Phone #: ###-####,, exterior wall bracing/shear ok,, still will need interior
BLD-Framing/Rough-in8/19/20168/22/20168/22/2016ANR
DetailsTony Young
Dusty Phone #: ###-####,, on site walk through only
CHANGE STATUS TO (ISS)  8/19/2016 DONE
Plan Mod
(F) Reprint permit  8/19/2016 DONE
OVERRIDE  8/9/2016  
Plan assigned to (CJW)7/26/20167/26/20168/9/2016 PASS
DetailsCarl Westfall
Routing - PLAN CHECK7/29/2016 8/9/2016 PASS
DetailsCarl Westfall
PLANS/APPL TAKEN TO FRONT DESK  8/9/2016 DONE
Permit Ready to Issue  8/9/2016 DONE
PLAN MOD *** DO NOT RE-ISSUE
Routing - FIRE8/4/20168/4/20168/4/2016 PASS
DetailsKatie Marron
Modifications were reviewed. Fire sprinkler system must be a full NFPA 13.
Plan Modification Accepted  7/29/2016 DONE
DetailsCarl Westfall
Workflow received
CHANGE STATUS TO (ISS)  7/26/2016 DONE
Plan Modification Accepted  7/26/2016 DONE
DetailsChristina Prado
Plan mod for changes to interior floor plan, specifically the kitchen area
OVERRIDE  7/21/2016  
Plan assigned to (CJW)7/14/20167/14/20167/21/2016 PASS
DetailsCarl Westfall
plan mod for sewer line revised sheet C1 and Sheet C3
PLANS/APPL TAKEN TO FRONT DESK  7/21/2016 DONE
Permit Ready to Issue  7/21/2016 DONE
DetailsChristina Prado
All requirements met

FEES DUE, MUST PAY ALL FEES IN FULL FOR PLAN MOD
**DO NOT RE-ISSUE**
Routing PW Sewer Design7/15/2016 7/20/2016 PASS
DetailsMike Sheppard
Sewer plan approved
Routing - PLUMBING7/15/2016 7/19/2016 PASS
DetailsBill VanDegrift
per plans and ISPC
Routing - PLAN CHECK7/15/2016 7/18/2016 PASS
DetailsCarl Westfall
Plan mod has no effect on building code regulation.
Routing - PUBLIC WORKS7/15/2016 7/15/2016 PASS
DetailsRachael Beierle
Plan Modification Accepted  7/14/2016 DONE
DetailsChristina Prado
Plan requested by Arch firm
BLD-Footing7/8/20167/11/20167/11/2016PPART
DetailsTony Young
Dusty Phone #: ###-####,, footing ok pending special inspection report
Print Occupancy Form  7/8/2016 DONE
Issue PAID IN FULL permit  7/8/2016 DONE
OVERRIDE  7/7/2016  
Plan assigned to (CJW)5/9/20165/9/20167/7/2016 PASS
DetailsCarl Westfall
(1st done) SERENA HOUSE (May 25 - 15 days) (June 15 - 30 days) new building
PLANS/APPL TAKEN TO FRONT DESK  7/7/2016 DONE
Permit Ready to Issue  7/7/2016 DONE
**See ACHD Letters in Doc-just need RP**Needs; ACHD approval, RP
Plan resubmittals received  7/6/2016 DONE
Routing PW Drainage7/6/2016 7/6/2016 PASS
DetailsBrian Murphy
Routing - PLAN CHECK7/6/2016 7/6/2016 PASS
DetailsCarl Westfall
Routing - PLAN CHECK6/28/2016 7/1/2016 PASS
DetailsCarl Westfall
Plan resubmittals requested  7/1/2016  
Routing PW Drainage6/29/2016 6/29/2016 FAIL
needs berm
Routing Off Site - STRUCTURAL6/29/2016 6/29/2016 PASS
DetailsCarl Westfall
Keith Jones / Chris Holladay
Plan resubmittals received  6/28/2016 DONE
Plan resubmittals requested  6/27/2016 DONE
Routing - PLAN CHECK6/9/2016 6/27/2016 FAIL
DetailsCarl Westfall
See 2nd plan review report
Routing Off Site - STRUCTURAL6/14/2016 6/21/2016 FAIL
DetailsCarl Westfall
Keith Jones
Routing - Erosion and Sediment6/14/2016 6/20/2016 PASS
DetailsAndy J. Long
(Site Prep Inspection and approval required prior to earth disturbance)

(SERENA HOUSE – NEW BUILDING – TRANSITIONAL HOUSING - EXPANSION OF CAMPUS) (CUP15-00079) The fire sprinkler system per NFPA 13 is used to allow dead end corridors more than 20 feet long and as required for R-2 Occupancies. To construct a 10,382 square foot building (5,355 square feet 1st story and 5,027 square feet 2nd story) to be used for transitional housing for women and children (4,492 square feet 1st story and 4,264 square feet 2nd story) and for offices (762 square feet 1st story and 719 square feet 2nd story). Work is to include concrete footings, concrete foundation, concrete slab on grade, wood stud exterior walls, interior and exterior shear walls, interior and exterior bearing walls, wood floor joists, wood roof trusses, wood sheathing for floor and roof diaphragms, asphalt shingles, wood siding, fiber cement siding, exterior windows, exterior doors, one interior stairway, one interior stairway rated like a corridor, one exterior stairway, interior fire-rated corridors, interior nonbearing walls, interior doors, millwork, and interior finishes.
Routing - PLUMBING6/14/2016 6/17/2016 PASS
DetailsBill VanDegrift
per plans and ISPC
Routing - MECHANICAL6/14/2016 6/16/2016 PASS
DetailsTroy James
Routing - FIRE6/14/2016 6/15/2016 PASS
DetailsKatie Marron
Revised report attached to case.
Routing PW Drainage6/14/2016 6/15/2016 FAIL
DetailsBrian Murphy
SWALE TO RETENTION AREA TALKED TO JIM C AT ROCK SOLID NEW PLAN ON WAY
Routing PW Street Lights6/14/2016 6/15/2016 PASS
DetailsTom Marshall
Plan resubmittals received  6/9/2016 DONE
Route to Impact Fee Review5/31/20166/3/20166/1/2016 PASS
DetailsCindy M. Gould
This is a congregate living facility. There are a total of 16 sleeping units, 12 having a floor area of about 260 square feet and 4 having a floor area of about 305 square feet. Kitchen, dining, living, and laundry facilities are shared.
1st review completed  6/1/2016 DONE
Plan resubmittals requested  6/1/2016 DONE
Routing - PLAN CHECK5/9/2016 5/31/2016 FAIL
DetailsCarl Westfall
Routing Off Site - STRUCTURAL5/9/2016 5/19/2016 FAIL
DetailsCarl Westfall
Keith Jones
Routing - MECHANICAL5/9/2016 5/18/2016 FAIL
DetailsTroy James
Routing PW Drainage5/9/2016 5/12/2016 FAIL
DetailsBrian Murphy
NEEDS BCIVILS.
Routing - Erosion and Sediment5/9/2016 5/12/2016 FAIL
DetailsAndy J. Long
ESC site map with narrative required for new building construction. Site in close proximity to surface water and MS4 connections to Boise River.
Routing - FIRE5/9/20165/9/20165/11/2016 FAIL
DetailsKatie Marron
Report attached to case and emailed to architect.
Routing PW Street Lights5/10/2016 5/10/2016 FAIL
DetailsTom Marshall
1) wet venting is limited to one floor, provide waste risers for the second floor wastes.
2) provide a site plan showing the sewer and water services.
3) provide a fixture schedule.
Routing - Addressing5/9/2016 5/10/2016 PASS
DetailsLaura Hunter
Assigned new address for expansion: 4481 W Willow Ln
Routing - PLUMBING5/9/2016 5/10/2016 FAIL
DetailsDaryl Spivey
Routing - PLANNING5/9/2016 5/10/2016 PASS
DetailsSusan Riggs
Routing - PLANNING Land Div5/9/2016 5/9/2016 PASS
DetailsTodd Tucker
Routing - PUBLIC WORKS5/9/2016 5/9/2016 PASS
DetailsRachael Beierle
Pending Assignment by TLW5/9/2016 5/9/2016 DONE
DetailsTim L. Woodard
Plan Reviewer's activity  5/5/2016 PASS
(5-5-16) It was decided to accept the drawings for review while the Building Official considers the request for a code interpretation regarding whether a vertical accessible route is required to serve the 2nd story.
Intake Approval  5/5/2016 PASS
Intake Approval  5/4/2016 FAIL
(5-4-16) Please see the redlines on the plan intake check list. Please resolve each circled item as noted (vertical accessible route and HVAC load calculations).
Intake Approval  5/2/2016 FAIL
(5-2-16) Please see the redlines on the plan intake check list. Please resolve each circled item as noted. After speaking with the Architect, it became evident that the rated corridor issue needs to be addressed.
Application received  4/26/2016 DONE
Application submitted via PDS Online on Apr 26 2016 11:05AM