Description
(US BANK BLDG – 2nd Floor – City Center Corridor Link) This permit is to create a common corridor off the main circulation corridor on this floor to the new parking garage that was built tight to the exterior wall of this building under BLD14-03207. This will also create a new small tenant space that is documented under BLD16-01666. This building is sprinklered for high-rise requirements and non-rated corridors. Work to include: removal of nonbearing interior partitions, [construction of noncombustible partitions to redefine core area and create a new tenant space], new lighting, new controls, new exterior door, and install new miscellaneous interior finishes in compliance with Ch. 8 of the 2006 IBC, this building is fully fire sprinkled any alterations to the sprinkler system WILL REQUIRE A SEPARATE PERMIT AND shall be installed and maintained per NFPA #13 as regulated by the fire department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 5/20/20176/13/2017 DONE
sent in mail 6-14-17
Meeting  6/1/2017 DONE
Spoke with Larren of Garden Company, Ambry of Commercial Project Coordinator and Rita DeYoung. Building permit was split into two permits and the mechanical was pulled under one. Per Rita value for mechanical is good under the one and zero on this permit
First Notice5/4/20175/4/20175/10/2017 DONE
DetailsCandy A. Nichols
sent in mail 5-11-17
BLD-Aging Inspection4/28/20174/28/20175/4/2017 PASS
DetailsDave Hannah
DOC - Permit Finaled5/4/20175/4/20175/4/2017APASS
DetailsDave Hannah
Letter of compliance/Occupancy  12/16/2016 DONE
BLD-Final12/14/201612/15/201612/15/2016APASS
DetailsDave Hannah
Larren Phone #: ###-####
FIRE-Final Inspection11/9/201611/9/201611/9/2016PPASS
DetailsTroy Cobbley
Fire life safety field inspection passed.
BLD-Framing/Rough-in9/8/20169/8/20169/12/2016PPART
DetailsDave Hannah
Larren Phone #: ###-#### needs slab edge protection
BLD-Conference6/13/20166/13/20166/14/2016PDONE
DetailsDave Hannah
Larin Phone #: ###-####
BLD-Framing/Rough-in6/2/20166/3/20166/4/2016PPASS
DetailsDave Hannah
Larren Phone #: ###-####
Inspection Record Card- Bld  6/2/2016 DONE
Issue PAID IN FULL permit  6/2/2016 DONE
Inspection Record Card- Bld  5/26/2016 DONE
PLANS/APPL TAKEN TO FRONT DESK  5/24/2016 DONE
Permit Ready to Issue  5/24/2016 DONE
***MET Candy has the copies***Need GC Form and Revised Cert of Value
Plan assigned to (TLW)5/10/2016 5/24/2016 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK5/10/2016 5/23/2016 PASS
DetailsTim L. Woodard
1st review completed  5/23/2016 DONE
Routing - FIRE5/10/2016 5/11/2016 PASS
DetailsKatie Marron
Comments attached to case.
Intake Approval  5/10/2016 PASS
Application received  4/26/2016 DONE