Permit Information
Permit NumberBLD16-01444
StatusVoid/No Violation
Name IDAHO MAINTENANCE LLC
Site Address 2105 N LARCH ST
Project Name 
Customer NumberDEMO BLD16-00007
ePlanReviewNo
Description
***Plan Modification - Adding a second floor (1156 square feet) over previously proposed Garage. See engineering and second plan set. (2) Bedrooms, Bathroom, Office, Family Room and Wet Bar. *** - Prescriptive Energy Code is prescribed for new construction. Addition of 433 squate feet of Living Space by walling in existing breezeway. Adding a 153 square feet of covered Front Entry and covered back Patio. Remainder of the home to be remodeled; Kitchen, Dining, Powder, Master Bedroom-Closet-Bath, Laundry, Office, (2) Bedrooms, Bathroom, Living Room. Engineering has been provided to alter the ceiling over the existing Living Room and Kitchen/Dining areas. Adding 4' to the Garage, relocating the Garage doors to face the street instead of the existing side entry garage. New mechanical is being installed. Separate electrical, plumbing, mechanical and erosion permits are required. All work to be done according to plans, notes, review notes, provided engineering and local codes. **BJM**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
VOIDED CHANGE STATUS  11/28/2018 DONE
New permit issued BLD18-02167
Telephone call  4/4/2018 DONE
designer called - wants to do a plan mod - i told him since the GC brought the drawings and app in and paid for the fees-we need a letter frm him stating he's ok if another GC takes over and uses his permit
Plan Reviewer's activity  1/16/2018 DONE
DetailsAdele J Schaffeld-Griffin
Called Owner Farie at ###-#### left messgae in regards to submitting for permit extension.
BLD-Conference1/11/20181/12/20181/12/2018ACANC
DetailsJim Sly
BLD-Conference1/10/20181/12/20181/11/2018ADONE
DetailsJim Sly
Check status.
Since the last visit, They have installed several windows, did a little framing and completed cleaning up the front yard. House still boarded up and secure.
BLD-Conference9/26/20179/26/20179/26/2017PDONE
DetailsJim Sly
After seeing a picture of the structure from a few months ago.......I realized that the garage and garage foundation has been removed. The neighbor said the owners have been working on the house over the last 6 months including cleaningnup the exterior. The house is generally safe and secure, with plywood on windows and doors. Not going to expire permit. I understand that owners are seeking a new contractor to complete the work. WIP.
BLD-Conference9/25/20179/25/20179/25/2017PDONE
DetailsJim Sly
Check status of project. Has it been abandoned?
No one is working on this project. It lookes the very same since my last inspection..........Mostly framed.....No 2nd story...no siding,windows or doors.
(F) Reprint permit  4/27/2017 DONE
CHANGE STATUS TO (ISS)  4/27/2017 DONE
Plan Mod
OVERRIDE  4/25/2017  
Plan assigned to (BJM)2/10/20172/10/20174/25/2017 DONE
DetailsBrian McGowan
Major Plan Mod in 2-10 - Fail - Structure needed for upper floor
Telephone call  4/25/2017 DONE
Spoke with Admir informing him that this plan mod is ready and the fee amount due for issuance
Case Summary (BLD)  4/25/2017 DONE
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  4/25/2017 DONE
DetailsBrian McGowan
Permit Ready to Issue  4/25/2017 DONE
DO NOT REISSUE PLAN MOD
Routing - PLAN CHECK3/27/2017 4/25/2017 PASS
DetailsBrian McGowan
BLD-Conference4/10/20174/11/20174/11/2017PDONE
DetailsJim Sly
Monica Phone #: ###-####
BLD-Conference4/7/20174/10/20174/10/2017ADONE
DetailsJim Sly
Monica Phone #: ###-####
BLD-Conference3/27/20173/27/20173/27/2017PDONE
DetailsJim Sly
Monica Phone #: ###-####
Plan resubmittals received  3/27/2017 DONE
received (2) sets of revised plans and specs
Routing - PLAN CHECK  3/2/2017 FAIL
DetailsBrian McGowan
Structure needed over Garage area for upper floor
Plan resubmittals received  2/22/2017 DONE
resubmittals recieved 2 copies of the revised manual J's-took to Brian McGowan
1st review completed  2/15/2017 FAIL
DetailsBrian McGowan
Manual J required
Routing - PLANNING2/13/2017 2/13/2017 PASS
DetailsColleen T Carroll
Routing - MECHANICAL2/13/2017 2/13/2017 PASS
DetailsTroy James
Plan Modification Accepted  2/10/2017 DONE
DetailsChristina Prado
Plan modification to enlarge the proposed addition. Received two sets of structural calcs and two sets of plans marked A0, A1, A2.1, A3, A5, A6, A7 & A8; Plans taken to Brian M. for routing
BLD-Conference12/5/201612/5/201612/5/2016PCANC
DetailsJim Sly
BLD-Aging Inspection12/2/201612/2/201612/5/2016 CANC
DetailsJim Sly
BLD-Energy code compliance7/19/20167/21/20167/21/2016APART
DetailsJim Sly
Dustin Phone #: ###-####
Found Insul at entry
BLD-Foundation7/7/20167/11/20167/8/2016APASS
DetailsJim Sly
Stem wall // Dustin Phone #: ###-####
BLD-Footing7/5/20167/7/20167/7/2016APASS
DetailsJim Sly
Dustin Phone #: ###-####
OVERRIDE  6/16/2016  
Plan assigned to (BJM)6/10/20166/10/20166/16/2016 DONE
DetailsBrian McGowan
Routing Walk-In (BLD)5/6/20165/6/20166/16/2016PDONE
DetailsBrian McGowan
Need site plan and more information.
Routing - MECHANICAL6/15/2016 6/16/2016 PASS
DetailsTroy James
Routing - PLAN CHECK6/16/2016 6/16/2016 PASS
DetailsBrian McGowan
Case Summary (BLD)  6/16/2016 DONE
DetailsBrian McGowan
Inspection Record Card- Bld  6/16/2016 DONE
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  6/16/2016 DONE
DetailsBrian McGowan
Permit Ready to Issue  6/16/2016 DONE
NEED RP
Telephone call  6/16/2016 DONE
called Admir- told him we need RP, fees due, and permit is ready
Issue PAID IN FULL permit  6/16/2016 DONE
Routing - PLAN CHECK6/14/2016 6/14/2016 FAIL
DetailsBrian McGowan
Missing beams over Entry where existing walls were removed. PFH at Garage needs to be a minimum 16" in width.
Routing - PLANNING6/14/2016 6/14/2016 PASS
DetailsColleen T Carroll
Plan resubmittals received  6/10/2016 DONE
received a full set of plans
Plan resubmittals received  5/26/2016 DONE
resubmitted 1 set of engineer calcs, 1 drawing stamped by engineer, changes in garage-gave to brian McGowan
Routing - PLAN CHECK5/9/2016 5/9/2016 FAIL
DetailsBrian McGowan
Need site plan and more information on the project.
Routing Walk-In (BLD)4/29/20164/29/20164/29/2016PFAIL
DetailsBrian McGowan
Need more accurate plans.
Routing - PLAN CHECK4/29/2016 4/29/2016 FAIL
DetailsBrian McGowan
Existing floor plan showed they were adding to the garage as well. No plans were presented for the garage addition.
Routing Walk-In (Zoning)4/26/20164/26/20164/26/2016PPASS
DetailsColleen T Carroll
No change to setbacks, site plan not required. Discussed relocating driveway per zoning requirements.
Routing Walk-In (BLD)4/26/20164/26/20164/26/2016PFAIL
DetailsBrian McGowan
Need beams, headers called out. Wall bracing not specified. Need wall section or detail. Manual J required. Foundation plan needed.
1st review completed  4/26/2016 FAIL
DetailsBrian McGowan
Need beams, headers called out. Wall bracing not specified. Need wall section or detail. Manual J required. Foundation plan needed.
Routing - PLAN CHECK4/26/2016 4/26/2016 FAIL
DetailsBrian McGowan
Need beams, headers called out. Wall bracing not specified. Need wall section or detail. Manual J required. Foundation plan needed.
Application received 4/26/2016