Print Statement | | | 3/3/2017 | | DONE |
|
|
|
|
Second Notice | | 1/20/2017 | 2/13/2017 | | DONE |
|
|
|
Mailed 2-14-17
|
First Notice | | 12/24/2016 | 1/10/2017 | | DONE |
|
|
|
sent notice in mail on 1/11/17
|
BLD-Final | 12/13/2016 | 12/14/2016 | 12/14/2016 | A | PASS |
Mike Jordan
|
|
|
Gordon Phone #: ###-####. Ok for perm occ.
|
Permanent Occupancy | | | 12/14/2016 | | DONE |
|
|
|
|
Zoning Approval | 12/13/2016 | 12/13/2016 | 12/13/2016 | | DONE |
Brent Moore
|
|
|
|
FIRE-Final Inspection | 12/9/2016 | 12/9/2016 | 12/9/2016 | A | PASS |
Jim Page
|
|
|
Short wall PIV in place and operational, final life fire safety inspection passed/complete.
|
Temporary Occupancy | 12/5/2016 | 3/5/2017 | 12/5/2016 | | DONE |
Carlos Velazquez
|
|
|
|
BLD-Final | 12/1/2016 | 12/2/2016 | 12/2/2016 | A | PART |
Mike Jordan
|
|
|
gordon Phone #: ###-####. Ok for temp. occ.
|
BLD-Final | 11/30/2016 | 12/1/2016 | 12/1/2016 | A | NR |
Mike Jordan
|
|
|
Needs mech. final inspection and will also need to remove tile from grid ceiling for grid inspection.
|
FIRE-Final Inspection | 11/30/2016 | 12/1/2016 | 12/1/2016 | A | PART |
Troy Cobbley
|
|
|
A temporary for the life safety is being given until the new PIV has been installed which is scheduled to arrive on 12/7/16
|
BLD-Final | 11/28/2016 | 11/30/2016 | 11/30/2016 | P | NR |
Mike Jordan
|
|
|
Gordan Phone #: ###-####. rescheduled for a.m. inspection 12-1-16.
|
FIRE-Final Inspection | 11/29/2016 | 11/30/2016 | 11/30/2016 | A | FAIL |
Troy Cobbley
|
|
|
Provide final inspections for the project related fire alarm and fire sprinkler permits, Provide occupant load sign and provide clearance at the FDC of 36" as discussed and as directed by the fire dept.
|
Zoning Approval Temp | 11/23/2016 | 11/29/2016 | 11/29/2016 | | PASS |
Josh Wilson
|
|
|
30-day temp ok
|
BLD-Footing | 10/31/2016 | 11/1/2016 | 11/1/2016 | A | PASS |
Mike Jordan
|
|
|
Rick Phone #: ###-####. Footing infill at south side of building were existing transformer was located. Will have special inspection on epoxy for rebar.
|
BLD-Energy code compliance | 10/11/2016 | 10/12/2016 | 10/12/2016 | A | PASS |
Mike Jordan
|
|
|
Rick Phone #: ###-####
|
BLD-Framing/Rough-in | 10/7/2016 | 10/10/2016 | 10/10/2016 | A | PASS |
Mike Jordan
|
|
|
Rick Phone #: ###-####
|
BLD-Energy code compliance | 9/29/2016 | 9/30/2016 | 9/30/2016 | A | PASS |
Mike Jordan
|
|
|
Rick Phone #: ###-####. Exterior walls behind cooler/freezer combos only.
|
BLD-Wall Bracing | 9/26/2016 | 9/27/2016 | 9/27/2016 | A | PASS |
Mike Jordan
|
|
|
Rick Phone #: ###-####. Exterior shear walls and all hold downs ok. ok to ocver exterior.
|
BLD-Wall Bracing | 9/22/2016 | 9/23/2016 | 9/23/2016 | A | PASS |
Phil Shearer
|
|
|
Roof nailing - Rick Phone #: ###-####
|
BLD-Framing/Rough-in | 9/20/2016 | 9/21/2016 | 9/21/2016 | P | PASS |
Mike Jordan
|
|
|
Rick Phone #: ###-####Truss to ledger connections.
|
BLD-Framing/Rough-in | 9/19/2016 | 9/20/2016 | 9/20/2016 | P | CANC |
Mike Jordan
|
|
|
Rick Phone #: ###-####
|
BLD-Concrete | 8/26/2016 | 8/29/2016 | 8/29/2016 | P | PASS |
Mike Jordan
|
|
|
Rick Phone #: ###-####
|
BLD-Foundation | 8/9/2016 | 8/10/2016 | 8/10/2016 | A | PART |
Mike Jordan
|
|
|
Rick Phone #: ###-####. Work in progress. Will have special inspection. Ok to place concrete after special inspection approval.
|
Issue PAID IN FULL permit | | | 7/27/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/27/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 6/27/2016 | | |
|
|
|
|
Plan assigned to (AJS) | 5/5/2016 | 5/5/2016 | 6/27/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed New building
|
Routing - PLAN CHECK | 6/16/2016 | | 6/27/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/27/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/27/2016 | | DONE |
|
|
|
ALL MET***rec ACHD letter-please see attached 7-25-16 CAN***NEED GC form, certificate of value, ACHD, and RP
|
Routing PW Solid Waste | 6/16/2016 | | 6/24/2016 | | PASS |
Peter J. McCullough
|
|
|
signed off in e plan
|
Routing - Design Review | 6/24/2016 | | 6/24/2016 | | PASS |
Josh Wilson
|
|
|
|
Routing - PLANNING | 6/16/2016 | | 6/24/2016 | | PASS |
Brent Moore
|
|
|
signed off in e plan
|
Routing Off Site - STRUCTURAL | 6/16/2016 | | 6/24/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing PW Street Lights | 6/16/2016 | | 6/24/2016 | | PASS |
Tom Marshall
|
|
|
signed off in e plan
|
Routing PW Sewer Design | 6/16/2016 | | 6/24/2016 | | CANC |
Kyle S. Rosenmeyer
|
|
|
no review needed noted in eplan
|
Routing - PLANNING Land Div | 6/16/2016 | | 6/17/2016 | | PASS |
Todd Tucker
|
|
|
|
Routing - PLUMBING | 6/16/2016 | | 6/17/2016 | | PASS |
Bill VanDegrift
|
|
|
additional cross connection protection may be required
|
Routing - FIRE | 6/16/2016 | 6/16/2016 | 6/16/2016 | | PASS |
Katie Marron
|
|
|
No revision to report required.
|
Routing - PUBLIC WORKS | 6/16/2016 | | 6/16/2016 | | PASS |
Beverly Mountain
|
|
|
|
Routing PW Sewer Rating | 6/16/2016 | | 6/16/2016 | | PASS |
Beverly Mountain
|
|
|
|
Routing PW Drainage | 6/16/2016 | | 6/16/2016 | | PASS |
Brian Murphy
|
|
|
|
Routing - MECHANICAL | 6/16/2016 | | 6/16/2016 | | PASS |
Troy James
|
|
|
|
Routing PW Environmental | 6/16/2016 | | 6/16/2016 | | PASS |
Rick Christenson
|
|
|
1500 Gallon Exterior Interceptor shown
|
Route to Impact Fee Review | 6/2/2016 | 6/5/2016 | 6/3/2016 | | PASS |
Cindy M. Gould
|
|
|
|
Routing Off Site - C.D.H | 5/20/2016 | | 6/3/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
signed off by CDH in e plan
|
1st review completed | | | 6/2/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 5/5/2016 | | 6/2/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLANNING | 5/5/2016 | | 5/20/2016 | | PASS |
Brent Moore
|
|
|
|
Routing - PLANNING Land Div | 5/5/2016 | | 5/20/2016 | | PASS |
Todd Tucker
|
|
|
|
Routing PW Street Lights | 5/5/2016 | | 5/20/2016 | | PASS |
Tom Marshall
|
|
|
|
Routing PW Sewer Rating | 5/5/2016 | | 5/20/2016 | | PASS |
Jennifer Bruner
|
|
|
|
Routing Off Site - STRUCTURAL | 5/5/2016 | | 5/17/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - MECHANICAL | 5/5/2016 | | 5/12/2016 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 5/5/2016 | | 5/10/2016 | | PASS |
Daryl Spivey
|
|
|
additional cross connection protection may be required
|
Routing - FIRE | 5/5/2016 | 5/5/2016 | 5/9/2016 | | PASS |
Katie Marron
|
|
|
Comments attached to case.
|
Routing PW Environmental | 5/5/2016 | | 5/9/2016 | | PASS |
Rick Christenson
|
|
|
1500 Gallon Grease Interceptor shown.
|
Routing PW Solid Waste | 5/5/2016 | | 5/6/2016 | | PASS |
Megan Durrell
|
|
|
|
Pending Assignment by TLW | 5/5/2016 | | 5/5/2016 | | DONE |
Tim L. Woodard
|
|
|
|
Routing PW Drainage | 5/5/2016 | | 5/5/2016 | | PASS |
Brian Murphy
|
|
|
approved grading plan
|
Routing PW Sewer Design | 5/5/2016 | | 5/5/2016 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing - Addressing | 5/5/2016 | | 5/5/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 5/5/2016 | | 5/5/2016 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Erosion and Sediment | 5/5/2016 | | 5/5/2016 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
(PANERA BREAD CAFE - #1887) We propose to construct a 5,100 SF bakery/cafe with a drive-thru along Franklin Road
|
Intake Approval | | | 5/4/2016 | | PASS |
|
|
|
|
Application received | | | 4/26/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 26 2016 3:53PM
|