Permit Information
Permit NumberBLD16-01453
StatusFinaled
Name THE RUSSELL CORPORATION
Site Address 11818 W JOPLIN RD
Project NameBoise Watershed River Campus
Customer Number 
ePlanReviewYes
Description
(PUMP HOUSE) Permti to replace an existing well house structure with a new, 345 sq ft well house constructed as part of the Watershed River Campus project. This project meets IECC requirements with High Effeciency HVAC as the additional efficiency package. Scope of work included foundation, walls and roof structure. This building is NOT fire sprinklered. **ajs**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 11/25/201612/12/2016 DONE
mailed 12-13-16
First Notice 11/11/201611/15/2016 DONE
Mailed 11-16-16
Permanent Occupancy  11/1/2016 DONE
BLD-Final10/31/201610/31/201610/31/2016APASS
DetailsJim Sly
Please call Jared 1/2 hr before inspection. Phone #: ###-#### Inspection requested via web by Jared Waggoner
OK for Perm Occ.
FIRE-Final Inspection10/27/201610/28/201610/28/2016APASS
DetailsTroy Cobbley
Life safety passed. Near the new pump house, for this scope of work, there is an electric gate with out the OptiCon system. I spoke to Scott and I was given permission to sign off with the contractors understanding that an OptiCon system is to be installed prior to any future sign offs. I spoke to Jared (general contractor) and let him know. I also spoke to Assistant Chief Ron with the Boise Fire Dept. and let him know the situation for follow up.
BLD-Final10/27/201610/27/201610/27/2016PNR
DetailsJim Sly
Please call Jared 1/2 hour before inspection Phone #: ###-#### Inspection requested via web by Jared Waggoner
Need Fire/life and Zoning finals.
FIRE-Final Inspection10/27/201610/27/201610/27/2016PFAIL
DetailsTroy Cobbley
No city approved plans on site. I noted that the exit sign, emergency light and fire extinguishers are provided and tested ok.
BLD-Energy code compliance7/18/20167/19/20167/19/2016PPASS
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Jared Waggoner
BLD-Framing/Rough-in7/15/20167/18/20167/18/2016PPASS
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Jared Waggoner
BLD-Concrete7/11/20167/12/20167/12/2016APART
DetailsJim Sly
Well house CMU grout to TOW scheduled for 10:30am Phone #: ###-#### Inspection requested via web by Jared Waggoner
MTI on site
BLD-Concrete7/8/20167/8/20167/8/2016APART
DetailsJim Sly
Well House CMU Walls. 4-8. Grout onsite at 12pm today Phone #: ###-#### Inspection requested via web by Jared Waggoner
OK pending MTI special insp, tests and approvals.
BLD-Concrete7/6/20167/7/20167/7/2016APART
DetailsJim Sly
0''-4'' Well House CMU. Phone #: ###-#### Inspection requested via web by Jared Waggoner
OK pending MTI special insp, tests and approvals.
BLD-Concrete6/30/20166/30/20166/30/2016PPASS
DetailsJim Sly
Reinforced well house slab on grade Phone #: ###-#### Inspection requested via web by Jared Waggoner
BLD-Concrete6/24/20166/27/20166/27/2016APASS
DetailsPhil Shearer
Well House Foundation Wall pour scheduled for 9:30am. Phone #: ###-#### Inspection requested via web by Jared Waggoner
BLD-Footing6/21/20166/21/20166/21/2016PPASS
DetailsJim Sly
Jared Phone #: ###-####
Footing OK pending MTI special insp, tests and approvals. Rick Cummings also overseeing Construction.
Issue PAID IN FULL permit  6/21/2016 DONE
Print Occupancy Form  6/21/2016 DONE
OVERRIDE  6/2/2016  
Plan assigned to (AJS)5/5/20165/5/20166/2/2016 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed New pump house
Routing Off Site - STRUCTURAL6/2/2016 6/2/2016 PASS
DetailsAdele J Schaffeld-Griffin
Adele
Here is the review and letter for the above referenced project. There is one condition that they have not addressed. No additional calculations are required so I really don’t need to see the submittal again but I do believe that they need to provide the detail requested. Let me know if you have any questions. I have updated the change marks and signed off on the review.
email recieved 5/31/16 from Stapley Engineering

Detail recieved 6/1/16 ajs
Routing - PLAN CHECK6/2/2016 6/2/2016 FAIL
DetailsAdele J Schaffeld-Griffin
change mark not addressed
Routing - PLAN CHECK6/2/2016 6/2/2016 PASS
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  6/2/2016 DONE
Permit Ready to Issue  6/2/2016 DONE
all requirments met

***need ACHD only 6-17-16 /CEV

NEED GC form, certificate of value, and ACHD
Routing - PLAN CHECK5/27/2016 5/31/2016 FAIL
DetailsAdele J Schaffeld-Griffin
Routing Off Site - STRUCTURAL5/27/2016 5/31/2016 FAIL
DetailsAdele J Schaffeld-Griffin
Route to Impact Fee Review5/20/20165/23/20165/23/2016 PASS
DetailsCindy M. Gould
Routing - PLAN CHECK5/5/2016 5/20/2016 FAIL
DetailsAdele J Schaffeld-Griffin
1st review completed  5/20/2016 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - PLANNING Land Div5/5/2016 5/19/2016 PASS
DetailsTodd Tucker
Routing Off Site - STRUCTURAL5/5/2016 5/12/2016 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - FIRE5/5/20165/5/20165/6/2016 PASS
DetailsKatie Marron
No comments required.
Routing - Design Review5/5/2016 5/6/2016 PASS
DetailsSarah Schafer
No planning approvals. Just double checking they don't need any entitlements. TLW

The changes are allowed on the property as accessory to the use. No design review is required. All setbacks and base zoning ordinance requirements are met.
Routing - MECHANICAL5/5/2016 5/5/2016 PASS
DetailsTroy James
Routing - PLUMBING5/5/2016 5/5/2016 PASS
DetailsDaryl Spivey
Pending Assignment by TLW5/5/2016 5/5/2016 DONE
DetailsTim L. Woodard
Routing - Addressing5/5/2016 5/5/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS5/5/2016 5/5/2016 PASS
DetailsJennifer Bruner
Routing - Erosion and Sediment5/5/2016 5/5/2016 PASS
DetailsEvan Jenkins
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)

This project will replace an existing well house structure with a new, larger well house constructed as part of the Watershed River Campus project.
Intake Approval  5/4/2016 PASS
Intake Approval  4/27/2016 FAIL
DetailsAdele J Schaffeld-Griffin
Please see electronic submittal standards for naming conventions. The sheets shall be named as to identify what each sheet is similar to the Index. G-001 Cover Sheer, G-002 Civil General Notes and Legend. I have deleted all of the current drawings to allow for the corrected naming standards to be uploaded.

Please revise the Com Check data to reflect the current adopted IECC 2012.
Application received  4/26/2016 DONE
Application submitted via PDS Online on Apr 26 2016 4:14PM