Permit Information
Permit NumberBLD16-01465
StatusFinaled
Name RALPH L WADSWORTH CONST CO LLC
Site Address 200 N 3RD ST
Project NameImperial Plaza Condominiums
Customer Number 
ePlanReviewYes
Description
(IMPERIAL PLAZA CONDOMINIUMS – BASEMENT GARAGE – REPAIR AND CODE UPGRADE) The entire basement of this existing high-rise building is required to have a fire sprinkler system. The rest of the building does not have fire sprinklers. To repair deterioration cause by water infiltration of the concrete topping slab, concrete structural sub-slab, and concrete joists above the 14,128 square foot basement garage. Demolition work includes removing the existing topping slab, removing all unsound concrete from the bottom of existing concrete joists, removing additional concrete to expose all rust on existing rebar, removing all rust from the rebar, and cleaning all latent material from the joists being repaired. Structural work includes drilling 2 inch diameter holes at 8 feet on center vertically through the non-prestressed joists to be repaired, applying a bonding agent on the surfaces to be repaired at the bottom and sides of the joists, installing formwork at the bottom and sides of the joists to restore the original joist shape, and installing concrete repair grout through the 2 inch holes to fill the formwork. Rebar dowels will be epoxied into the existing joists at 16 inches on center for some joists and 60 inches on center for other joists and a new 5 inch thick reinforced concrete toping slab will be installed on top of the existing concrete joists and structural sub-slab. Other work includes upgrading an existing concrete wall to comply as a 2-hr fire-resistance-rated fire barrier wall to function as a horizontal exit, installing a new overhead coiling door, constructing a new masonry vestibule and side-hinged swinging egress door, constructing a new concrete landing with a 3 riser stairway at an existing interior door, and installing handrails and slip resistant floor markings on each side of the existing vehicular ramp for occupant egress. Special inspection is required for epoxy anchors, grouting, concrete, and to verify compliance with the manufacture’s installation instructions for the repair products. The work is required to comply with the approved drawings, with the plan review report, with the structural design, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  7/21/2017 DONE
First Notice 6/23/20177/12/2017 DONE
sent in mail 7-13-17
Print Occupancy Form  6/13/2017 DONE
Permanent Occupancy  6/13/2017 DONE
DOC - Permit Finaled  5/23/2017 DONE
Print Occupancy Form  12/14/2016 DONE
BLD-Final11/18/201611/21/201611/21/2016PPASS
DetailsDave Hannah
George Phone #: ###-####
BLD-Final11/14/201611/15/201611/16/2016APEND
DetailsDave Hannah
John Phone #: ###-#### city needs a letter from structal engineer
FIRE-Final Inspection11/14/201611/15/201611/15/2016APASS
DetailsJim Page
Final fire sprinkler inspection complete, final fire alarm inspection complete, fire extinguishers are in place with current inspection tags, property has a knox box. Final life fire safety inspection complete.
BLD-Final11/10/201611/14/201611/14/2016ANR
DetailsPhil Shearer
Call prior to going Phone #: 8013302634 >> Inspection requested via mobile web by Josh Oviatt. Need fire life/ safty inspection
Print Occupancy Form  10/25/2016 DONE
BLD-Conference8/30/20168/31/20168/31/2016ADONE
DetailsDave Hannah
Call prior to going Phone #: 8013302634 >> Inspection requested via mobile web by Josh Oviatt
Issue PAID IN FULL permit  7/21/2016 DONE
Print Occupancy Form  7/21/2016 DONE
OVERRIDE  7/7/2016  
Plan assigned to (CJW)5/2/20165/2/20167/7/2016 PASS
DetailsCarl Westfall
(1st done) IMPERIAL PLAZA - (May 20 - 15 days) Level 3 TI - ePlanReview
Routing - PLAN CHECK7/6/2016 7/7/2016 PASS
DetailsCarl Westfall
Note - finish the 4th plan review report and upload after structural approves
Routing Off Site - STRUCTURAL7/7/2016 7/7/2016 PASS
DetailsCarl Westfall
Jared Bauder (CH2MHill)
PLANS/APPL TAKEN TO FRONT DESK  7/7/2016 DONE
Permit Ready to Issue  7/7/2016 DONE
***MET 7-7-16 CAN***need RP, GC & rev cert of val
Routing - PLAN CHECK6/29/2016 7/6/2016 FAIL
DetailsCarl Westfall
Routing Off Site - STRUCTURAL6/30/2016 7/6/2016 FAIL
DetailsCarl Westfall
Jared Bauder
Plan resubmittals requested  7/6/2016 DONE
Plan resubmittals received  7/6/2016 DONE
Plan resubmittals received  6/29/2016 DONE
Routing - PLAN CHECK6/2/2016 6/9/2016 FAIL
DetailsCarl Westfall
Plan resubmittals requested  6/9/2016 DONE
Routing - Erosion and Sediment6/9/2016 6/9/2016 PASS
DetailsAndy J. Long
ESC site plan and narrative submitted and approved. RP with Wadsworth Construction has valid WPCM Certificate from AGC /ITD
Routing Off Site - STRUCTURAL6/6/2016 6/8/2016 FAIL
DetailsCarl Westfall
Jared Bauder
Routing - Erosion and Sediment6/6/2016 6/7/2016 FAIL
DetailsAndy J. Long
No ESC plan or ESC plan waiver submitted. Significant demolition and concrete work and Level 3 TI requires ESC permit application with plan or plan waiver document.
Plan resubmittals received  6/2/2016 DONE
DetailsCarl Westfall
Route to Impact Fee Review5/18/20165/21/20165/23/2016 PASS
DetailsCindy M. Gould
Routing Off Site - STRUCTURAL5/2/2016 5/18/2016 FAIL
DetailsCarl Westfall
Jared Bauder (CH2M Hill)
1st review completed  5/18/2016 DONE
Plan resubmittals requested  5/18/2016 DONE
Routing - PLAN CHECK5/2/2016 5/16/2016 FAIL
DetailsCarl Westfall
See IBC plan review report
Routing - Erosion and Sediment5/2/2016 5/4/2016 FAIL
DetailsEvan Jenkins
ESC Waiver Letter Request Required for Approval.
Evan Jenkins 794.3958
Routing - FIRE5/2/20165/2/20165/3/2016 PASS
DetailsKatie Marron
Comments attached to case.
Routing - Addressing5/2/2016 5/3/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS5/2/2016 5/3/2016 PASS
DetailsJennifer Bruner
Routing - Design Review5/2/2016 5/2/2016 PASS
DetailsSarah Schafer
Sarah Schafer - parking deck repairs

Parking deck repairs approved for DR through the building permit.
Intake Approval  5/2/2016 PASS
DetailsJason Blais
Prescreen approved by Javier Guzman and plan review fees paid.
Pending Assignment by JCB5/2/2016 5/2/2016 DONE
DetailsJason Blais
Application received  4/27/2016 DONE
Application submitted via PDS Online on Apr 27 2016 5:27PM
Zoning Approval5/23/20175/23/2017   
DetailsSarah Schafer
planting inspection for final planning sign off