BLD-Final | 9/27/2016 | 9/27/2016 | 9/27/2016 | P | PASS |
Phil Shearer
|
|
|
Larry Phone #: ###-####
|
DOC - Permit Finaled | 9/27/2016 | 9/27/2016 | 9/27/2016 | P | PASS |
Phil Shearer
|
|
|
|
BLD-Energy code compliance | 7/18/2016 | 7/19/2016 | 7/19/2016 | A | PASS |
Phil Shearer
|
|
|
Larry Phone #: ###-####
|
BLD-Framing/Rough-in | 7/15/2016 | 7/15/2016 | 7/15/2016 | P | PASS |
Phil Shearer
|
|
|
Larry Phone #: ###-####
|
BLD-Framing/Rough-in | 7/12/2016 | 7/13/2016 | 7/13/2016 | A | FAIL |
Phil Shearer
|
|
|
Larry Phone #: ###-####. Point load support transfer though the floor, Door in the back of the garage needs 2 king studs per plan, Blocking between floor joist in the garage per plan note 5, Blocking between trusses under dormer per plan note 4, Need mechanical rough in.
|
BLD-Wall Bracing | 6/16/2016 | 6/17/2016 | 6/17/2016 | A | PART |
Phil Shearer
|
|
|
Larry Phone #: ###-####. Missing hold downs OK to wrap.
|
BLD-Foundation | 5/31/2016 | 6/1/2016 | 6/1/2016 | A | PASS |
Phil Shearer
|
|
|
Jared-wall Phone #: ###-####
|
BLD-Footing | 5/26/2016 | 5/27/2016 | 5/27/2016 | P | PASS |
Phil Shearer
|
|
|
Jared Phone #: ###-####
|
Issue PAID IN FULL permit | | | 5/19/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/19/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 5/9/2016 | | |
|
|
|
|
1st review completed | | | 5/9/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/9/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/9/2016 | | DONE |
|
|
|
requirements met
|
Plan assigned to (LEG) Tisha | 4/28/2016 | | 5/9/2016 | | DONE |
Tisha Gallop
|
|
|
5/12
|
Routing - PLAN CHECK | 4/28/2016 | | 5/9/2016 | | PASS |
Tisha Gallop
|
|
|
|
Routing - MECHANICAL | 4/28/2016 | | 5/4/2016 | | PASS |
Troy James
|
|
|
|
Application received | | | 4/28/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 28 2016 9:56AM
|
Plans ACCEPTED BY PLAN TECH | | | 4/28/2016 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 4/28/2016 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/28/2016 | | DONE |
Christina Prado
|
|
|
|
Routing - PLANNING | 4/28/2016 | | 4/28/2016 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 4/28/2016 | | 4/28/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 4/28/2016 | | 4/28/2016 | | PASS |
Rachael Beierle
|
|
|
|