Third Notice | | 5/15/2017 | 6/5/2017 | | DONE |
|
|
|
This permit finaled on the web by derek cooper
|
Third Notice | | 4/17/2017 | 5/10/2017 | | DONE |
|
|
|
Mailed 5-11
|
Second Notice | | 3/19/2017 | 4/12/2017 | | DONE |
|
|
|
mailed 4-13-17
|
First Notice | 3/8/2017 | 3/8/2017 | 3/9/2017 | | DONE |
Dave Hannah
|
|
|
put in mail 3-10-17
|
BLD-Aging Inspection | 3/3/2017 | 3/3/2017 | 3/8/2017 | | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 3/8/2017 | 3/8/2017 | 3/8/2017 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 10/19/2016 | 10/20/2016 | 10/20/2016 | A | PASS |
Dave Hannah
|
|
|
Zach Phone #: ###-####
|
FIRE-Final Inspection | 10/19/2016 | 10/19/2016 | 10/19/2016 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete, final fire alarm inspection complete, fire extinguishers are in common area's with current inspection tags (Fire extinguisher inspection tags will expire at the end of October) Final life fire safety inspection passed/complete.
|
FIRE-Final Inspection | 10/7/2016 | 10/10/2016 | 10/10/2016 | A | CANC |
Jim Page
|
|
|
Inspection request cancelled due to a fire alarm permit (FIR16-00625) that is associated with this project is still in received status, life fire safety inspection cannot be completed until fire alarm permit is in issued status and an inspection is performed and passed.
|
BLD-Final | 10/7/2016 | 10/10/2016 | 10/10/2016 | P | CANC |
Dave Hannah
|
|
|
Zach Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 9/27/2016 | 9/27/2016 | 9/28/2016 | P | PASS |
Dave Hannah
|
|
|
Zack Phone #: ###-####
|
BLD-Conference | 9/15/2016 | 9/15/2016 | 9/27/2016 | P | PASS |
Dave Hannah
|
|
|
Zach Phone #: ###-####
|
BLD-Framing/Rough-in | 8/15/2016 | 8/15/2016 | 8/15/2016 | P | PASS |
Mike Jordan
|
|
|
Zack Phone #: ###-####. Interior steel stud framed walls for new mens and womens locker/restrooms in basement.
|
Issue PAID IN FULL permit | | | 6/2/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/2/2016 | | DONE |
|
|
|
|
Plan assigned to (JG) | 5/18/2016 | 5/18/2016 | 5/27/2016 | | PASS |
Javier Guzman
|
|
|
5/24 L1 Locker Room Remodel ePlan, Pending Plum, ESC for 1 rev
|
Routing - Erosion and Sediment | 5/20/2016 | | 5/27/2016 | | PASS |
Andy J. Long
|
|
|
No ESC permit needed. Level 1 TI, mostly. No stormwater pollution from work allowed.
|
1st review completed | | | 5/27/2016 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/27/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/27/2016 | | DONE |
|
|
|
NEED GC form and Certificate of value
|
Routing - PLUMBING | 5/18/2016 | | 5/23/2016 | | PASS |
Daryl Spivey
|
|
|
Lavs left off of waste and vent drawing. Plumb in lavs per ISPC.
|
Routing - PLAN CHECK | 5/18/2016 | | 5/20/2016 | | PASS |
Javier Guzman
|
|
|
|
Routing - Addressing | 5/18/2016 | | 5/19/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 5/18/2016 | | 5/18/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - MECHANICAL | 5/18/2016 | | 5/18/2016 | | PASS |
Troy James
|
|
|
|
Intake Approval | | | 5/18/2016 | | PASS |
David Ferguson
|
|
|
|
Application received | | | 4/28/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 28 2016 1:11PM
|