BLD-Aging Inspection | 12/6/2017 | 12/6/2017 | 12/12/2017 | | FAIL |
Jim Storey
|
|
|
need fire and zoning bld time exp
|
BLD-Aging Inspection | 12/5/2017 | 12/5/2017 | 12/12/2017 | | FAIL |
Jim Storey
|
|
|
need fire and zoning bld time exp
|
BLD-Aging Inspection | 7/24/2017 | 7/24/2017 | 7/24/2017 | | PASS |
Jim Storey
|
|
|
9/7/17 exp ncfi
|
Issue PAID IN FULL permit | | | 9/7/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/7/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 7/21/2016 | | |
|
|
|
|
Plan assigned to (AJS) | 7/15/2016 | 7/15/2016 | 7/21/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 7/15/2016 | | 7/21/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - Erosion and Sediment | 7/15/2016 | | 7/21/2016 | | PASS |
Evan Jenkins
|
|
|
AT&T to install a diesel generator to be used in the event of a power loss to the existing wireless facility.
|
1st review completed | | | 7/21/2016 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/21/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/21/2016 | | DONE |
|
|
|
*** AS of 8-15-16 ONLY NEED RP ( KRS)****Need GC Form, Revised Cert and RP
|
Routing - Addressing | 7/15/2016 | | 7/20/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - Design Review | 7/15/2016 | | 7/20/2016 | | PASS |
Andrea Tuning
|
|
|
|
Routing - FIRE | 7/19/2016 | 7/15/2016 | 7/19/2016 | | PASS |
Katie Marron
|
|
|
Diesel fuel tank is within limits allowed per IFC 603.3. Impact protection to be field verified. No additional comments required.
|
Routing - PUBLIC WORKS | 7/15/2016 | | 7/19/2016 | | PASS |
Rachael Beierle
|
|
|
|
Intake Approval | | | 7/15/2016 | | PASS |
Carl D Madsen
|
|
|
|
Intake Approval | | | 5/4/2016 | | FAIL |
|
|
|
5-4-16 Carl Madsen ###-####
Please provide a completed checklist associated with this application and provide all applicable items.
Engineering calculations are required for the placement of the new generator.
Zoning approval is required.
A minimum of an erosion and sediment control waiver letter is required.
Please review the E-plan review submittal requirement and upload plan documents appropriately. All plan sheets are required to be named and uploaded separately.
|
Application received | | | 4/28/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 28 2016 4:23PM
|