Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD16-01481
StatusFinaled
Name CALIENTE CONSTRUCTION INC
Site Address 619 W BANNOCK ST
Project NameAT&T - Replace 6th Floor Roof
Customer Number 
ePlanReviewYes
Description
(ROOF PROJECT) (AT&T BUILDING) See attached special inspection report. Fire stopping to per UL listing for new and existing penetrations through building. Guard rail shall meet loading requirements of chapter 16 IBC. Replacement of roofing system and adding above deck insulation to meet IECC 2012 over the 14,321 sq ft Sixth Floor and 1,486 sq ft Seventh Floor Penthouse. See plans for alternates. Replacement of roof drains includes the installation of nine (9) new overflow scuppers and four (4) new internal overflow drains. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **ajs** Perviouse permit BLD14-01620, permit expired prior to issuance. NOTE: This building is partially fire sprinklered and partially equiped with smoke detection / pre-action system based on 1992 Letter of Agreement on file. ALL EXISTING SPRINKLER, SMOKE, PRE-ACTION SYSTEMS SHALL REMAIN IN PLACE & OPERATIONAL
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 10/17/201711/9/2017 DONE
This permit finaled on the web by Colin Smith
Third Notice 8/15/201710/12/2017 DONE
Mailed 10-13-17
Second Notice 7/22/20178/10/2017 DONE
Mailed 8-11-17
First Notice6/19/20176/19/20177/12/2017 DONE
DetailsDave Hannah
Mailed 7-13-17
BLD-Final6/16/20176/19/20176/19/2017APASS
DetailsDave Hannah
Sean Phone #: ###-####
DOC - Permit Finaled6/19/20176/19/20176/19/2017PPASS
DetailsDave Hannah
BLD-Conference4/3/20174/3/20174/4/2017PPASS
DetailsDave Hannah
Sean Phone #: ###-####
BLD-Conference3/31/20174/3/20174/3/2017APEND
DetailsJim Sly
Sean Phone #: ###-####
Talked with Sean. He said he would Re-schedule to meet with Primary inspector.
Issue PAID IN FULL permit  6/27/2016 DONE
DetailsChristina Prado
Inspection Record Card- Bld  6/27/2016 DONE
Plan assigned to (AJS)5/13/20165/13/20165/20/2016 PASS
DetailsAdele J Schaffeld-Griffin
Routing - PLAN CHECK5/13/2016 5/20/2016 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed  5/20/2016 DONE
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  5/20/2016 DONE
Permit Ready to Issue  5/20/2016 DONE
**MET 6-22-16** needs GC Form, Revised Cert of Value
Routing - MECHANICAL5/13/2016 5/16/2016 PASS
DetailsTroy James
No mechanical to review
Routing - PLUMBING5/13/2016 5/16/2016 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing - Addressing5/13/2016 5/16/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS5/13/2016 5/16/2016 PASS
DetailsRachael Beierle
Routing PW Drainage5/16/2016 5/16/2016 PASS
DetailsBrian Murphy
reroof
Routing - Design Review5/13/2016 5/16/2016 PASS
DetailsAndrea Tuning
Intake Approval  5/13/2016 PASS
DetailsDavid Ferguson
Application received  4/28/2016 DONE
Application submitted via PDS Online on Apr 28 2016 5:10PM