BLD-Final | 7/13/2016 | 7/14/2016 | 7/15/2016 | P | FAIL |
Phil Shearer
|
|
|
Please call ahead for access, coming from Eagle - David Phone #: ###-####. Need racking permit
|
BLD-Final | 6/29/2016 | 6/30/2016 | 6/30/2016 | P | FAIL |
Mike Jordan
|
|
|
David Phone #: ###-####. Floor plan does not match what was submitted. Needs to show upstairs offices and office area maintenace shop. Also noted racking over 8ft. that requires aseperate permit and engineering.
|
BLD-Final | 6/23/2016 | 6/29/2016 | 6/29/2016 | P | NR |
Mike Jordan
|
|
|
David Phone #: ###-####
|
FIRE-Final Inspection | 6/21/2016 | 6/23/2016 | 6/23/2016 | P | PASS |
Katie Marron
|
|
|
Verified previous correction items. Life Safety Pass.
|
FIRE-Final Inspection | 6/17/2016 | 6/20/2016 | 6/20/2016 | A | FAIL |
Katie Marron
|
|
|
Full walkthrough completed, the following correction items noted: - Address numbers posted (on fence ok) - Repair exit signs - Remove thumbturn deadbolts on designated exits - Lever hardware on exit from small shop off or larger shop area. Discussed only one door required and preferred front facing door. - "This door to remain..." signs posted as required.
|
Issue PAID IN FULL permit | | | 5/31/2016 | | DONE |
|
|
|
|
Plan assigned to (JG) | 4/29/2016 | 4/29/2016 | 5/24/2016 | | PASS |
Javier Guzman
|
|
|
1st review completed, 5/05 L2 DENNIS DILLON RV, Occ Eval paper
|
Routing - PLAN CHECK | 5/23/2016 | | 5/24/2016 | | PASS |
Javier Guzman
|
|
|
|
Case Summary (BLD) | | | 5/24/2016 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/24/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/24/2016 | | DONE |
|
|
|
All Met
|
Print Occupancy Form | | | 5/24/2016 | | DONE |
|
|
|
|
Telephone call | | | 5/24/2016 | | DONE |
|
|
|
Left a message for Jason informing him this permit is ready to be picked up
|
Routing - FIRE | | 5/2/2016 | 5/23/2016 | | PASS |
Katie Marron
|
|
|
No review performed. Building was constucted in 1991. Original approval performed by Ada county. No proposed change of use. Seeking Certificate of Occupancy under Boise City.
|
Routing - PLAN CHECK | 5/2/2016 | | 5/3/2016 | | FAIL |
Javier Guzman
|
|
|
|
Plan Reviewer's activity | | | 5/3/2016 | | FAIL |
Javier Guzman
|
|
|
called applicant for need of floor plan showint he warehouse storage areas
|
1st review completed | | | 5/3/2016 | | DONE |
Javier Guzman
|
|
|
|
Plan Reviewer's activity | | | 5/2/2016 | | DONE |
Javier Guzman
|
|
|
called applicant because floor plan is of the office only and need a floor plan of the warehouse area
|
Routing - PUBLIC WORKS | 5/2/2016 | | 5/2/2016 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Addressing | 4/29/2016 | | 4/29/2016 | | PASS |
Laura Hunter
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/29/2016 | | DONE |
|
|
|
|
Intake Approval | | | 4/29/2016 | | PASS |
Javier Guzman
|
|
|
|
Application received | | 4/29/2016 | | | |
|
|
|
|