Permit Information
Permit NumberBLD16-01484
StatusFinaled
Name ST LUKES HEALTH SYSTEM LTD
Site Address 190 E BANNOCK ST
Project NameSLRMC 4th and 8th floor
Customer Number 
ePlanReviewYes
Description
(ST. LUKES REGIONAL MEDICAL CENTER) (4th floor new patient unit waiting room) scope of work to demo part of an existing 390 sq storage room to create a 128 sq ft waiting room with the remaining 262 sq ft storage room. The rooms shall be separated by a 1-hour fire barrier. Minor demolition as shown on approved drawings. New opening in corridor shall have rating of protection for corridor. New suspended ceiling. All interior finish material shall meet IBC chapter 8. (8th floor conversion of a tub room into a storage room) Scope of work to include demolition of plumbing fixtures in tub room. This room will be converted to a 102 sq ft storage room. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **ajs**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 1/15/20172/9/2017 DONE
This permit finaled on the web by Curtis Weedop
Second Notice 11/25/20161/10/2017 DONE
Mailed 1-11
First Notice10/10/201610/10/201611/15/2016 DONE
DetailsDave Hannah
Mailed 11-16-16
BLD-Final10/4/201610/10/201610/10/2016APASS
DetailsDave Hannah
Rick Phone #: ###-####
DOC - Permit Finaled10/10/201610/10/201610/10/2016PPASS
DetailsDave Hannah
FIRE-Final Inspection10/4/201610/5/201610/5/2016APASS
DetailsJim Page
Fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguishers are in common area's with current inspection tags, final life fire safety inspection passed/complete.
BLD-Framing/Rough-in7/15/20167/18/20167/18/2016APASS
DetailsDave Hannah
Rick Phone #: ###-####
Issue PAID IN FULL permit  6/17/2016 DONE
Inspection Record Card- Bld  6/17/2016 DONE
Plan assigned to (AJS)5/2/20165/2/20165/19/2016 PASS
DetailsAdele J Schaffeld-Griffin
Level 3 TI - ePlanReview - St. Lukes
Routing - PLAN CHECK5/2/2016 5/19/2016 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed  5/19/2016 DONE
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  5/19/2016 DONE
Permit Ready to Issue  5/19/2016 DONE
DetailsChristina Prado
***all requirments met 5-20-16 /CEV

Need GC Form & Revised certificate of value from GC
Routing - FIRE5/2/20165/2/20165/4/2016 PASS
DetailsScott Arellano
No comments required.
Routing - Addressing5/2/2016 5/3/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS5/2/2016 5/3/2016 PASS
DetailsJennifer Bruner
Intake Approval  5/2/2016 PASS
DetailsJason Blais
Prescreen approved by Carl Madsen and plan review fees paid.
Pending Assignment by JCB5/2/2016 5/2/2016 DONE
DetailsJason Blais
Application received  4/29/2016 DONE
Application submitted via PDS Online on Apr 29 2016 10:19AM