DOC - Permit Finaled | | | 7/13/2016 | | DONE |
|
|
|
|
Letter of compliance/Occupancy | | | 7/13/2016 | | DONE |
|
|
|
|
BLD-Final | 6/20/2016 | 6/20/2016 | 6/20/2016 | P | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-####
|
FIRE-Final Inspection | 6/20/2016 | 6/20/2016 | 6/20/2016 | P | PASS |
Katie Marron
|
|
|
Fire Life Safety Pass. Verified previous correction items.
|
BLD-Final | 6/17/2016 | 6/17/2016 | 6/17/2016 | P | NR |
Mike Jordan
|
|
|
Jim Phone #: ###-####
|
FIRE-Final Inspection | 6/17/2016 | 6/17/2016 | 6/17/2016 | P | FAIL |
Katie Marron
|
|
|
Completed full life safety inspection/walk through and discussed placement of HM signs and no smoking signs. The following items to be corrected: 3 interior exit lights repaired/replaced 1 exterior exit light added no smoking signs posted hazardous material signs posted
Plans and Fire Code Report marked.
|
FIRE-Final Inspection | 6/16/2016 | 6/16/2016 | 6/16/2016 | P | CANC |
Troy Cobbley
|
|
|
Jim Phone #: ###-####
|
FIRE-Final Inspection | 6/6/2016 | 6/7/2016 | 6/7/2016 | A | FAIL |
Troy Cobbley
|
|
|
Jim and I discussed the need for drawings and small documents that were not on site. I accessed the fire review notes and went over many of the listed items.
|
Plan Reviewer's activity | | | 6/7/2016 | | DONE |
Javier Guzman
|
|
|
Noticed i did not place a Y in required signatures in Tidemark
|
Inspection Record Card- Bld | | | 6/6/2016 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/6/2016 | | DONE |
|
|
|
|
Plan assigned to (JG) | 5/2/2016 | 5/2/2016 | 5/13/2016 | | PASS |
Javier Guzman
|
|
|
5/13 L2 Anodizers Inc.ePlan
|
Routing - PLAN CHECK | 5/2/2016 | | 5/13/2016 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 5/13/2016 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/13/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/13/2016 | | DONE |
|
|
|
***MET***NEED GC form and certificate of value
|
Routing - FIRE | 5/2/2016 | 5/2/2016 | 5/11/2016 | | PASS |
Katie Marron
|
|
|
Comments attached to case.
|
Routing PW Environmental | 5/2/2016 | | 5/5/2016 | | PASS |
Rick Christenson
|
|
|
Must comply to all Pretreatment requirements.
|
Routing PW Sewer Rating | 5/2/2016 | | 5/5/2016 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - MECHANICAL | 5/2/2016 | | 5/4/2016 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 5/2/2016 | | 5/3/2016 | | PASS |
Bill VanDegrift
|
|
|
R.P. required on all water in production area
|
Routing - Addressing | 5/2/2016 | | 5/2/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 5/2/2016 | | 5/2/2016 | | PASS |
Jennifer Bruner
|
|
|
|
Intake Approval | | | 5/2/2016 | | PASS |
Javier Guzman
|
|
|
|
Application received | | | 4/29/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 29 2016 2:38PM
|