BLD-Final | 8/29/2016 | 8/30/2016 | 8/30/2016 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Dave Hemeon
|
DOC - Permit Finaled | 8/30/2016 | 8/30/2016 | 8/30/2016 | P | PASS |
Jim Storey
|
|
|
|
BLD-Energy code compliance | 7/11/2016 | 7/12/2016 | 7/12/2016 | A | PASS |
Jim Storey
|
|
|
Phone #: 2088304926 >> Inspection requested via mobile web by Morgan Fitzgerald
|
BLD-Framing/Rough-in | 7/8/2016 | 7/8/2016 | 7/8/2016 | P | PART |
Phil Shearer
|
|
|
Phone #: 2088304926 >> Inspection requested via mobile web by Morgan Fitzgerald. Floor joist and beam at the bottom of stairs missing hangers, floor joist east of the front door missing hanger, beam hanger in family room needs nails. OK to insulate
|
BLD-Wall Bracing | 6/22/2016 | 6/22/2016 | 6/22/2016 | P | PASS |
Jim Storey
|
|
|
Shear // Zane Phone #: ###-####
|
BLD-Footing | 5/31/2016 | 6/1/2016 | 6/1/2016 | P | PASS |
Jim Storey
|
|
|
Dion Phone #: ###-####
|
OVERRIDE | | | 5/25/2016 | | |
|
|
|
|
Plan assigned to (BJM) | 5/12/2016 | 5/12/2016 | 5/25/2016 | | DONE |
Brian McGowan
|
|
|
due 5/23 - failed - Verify details for cantilevered construction
|
Routing - PUBLIC WORKS | 5/9/2016 | | 5/25/2016 | | PASS |
Jennifer Bruner
|
|
|
|
Issue PAID IN FULL permit | | | 5/25/2016 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Bld | | | 5/25/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/25/2016 | | 5/25/2016 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/25/2016 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 5/25/2016 | | DONE |
|
|
|
all requirements met
|
1st review completed | | | 5/23/2016 | | FAIL |
Brian McGowan
|
|
|
Verify details for cantilevered construction
|
Routing - PLAN CHECK | 5/9/2016 | | 5/23/2016 | | FAIL |
Brian McGowan
|
|
|
Verify details for cantilevered construction
|
Routing - MECHANICAL | 5/13/2016 | | 5/13/2016 | | PASS |
Troy James
|
|
|
|
Routing - MECHANICAL | 5/9/2016 | | 5/12/2016 | | FAIL |
Troy James
|
|
|
emailed correction to integrity
|
Plan assigned to (LEG) Tisha | 5/9/2016 | | 5/12/2016 | | DEFR |
Tisha Gallop
|
|
|
|
Routing - PLANNING | 5/9/2016 | | 5/10/2016 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 5/9/2016 | | 5/9/2016 | | PASS |
Laura Hunter
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/9/2016 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 5/9/2016 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/9/2016 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 4/29/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 29 2016 4:19PM
|