First Notice | | 3/9/2017 | 3/10/2017 | | DONE |
|
|
|
sent in mail 3-13-17
|
Permanent Occupancy | | | 2/27/2017 | | DONE |
|
|
|
|
BLD-Final | 2/23/2017 | 2/24/2017 | 2/24/2017 | P | PASS |
Jim Storey
|
|
|
After 2 // Steve Phone #: ###-####
|
FIRE-Final Inspection | 2/23/2017 | 2/24/2017 | 2/24/2017 | A | PASS |
Jim Page
|
|
|
Previously noted items have been repaired, no fire sprinklers, no fire aarms, fire extinguishers are in place with current inspection tags. Final life fire safety inspection passed/complete
|
BLD-Final | 2/21/2017 | 2/22/2017 | 2/22/2017 | A | NR |
Dave Hannah
|
|
|
Call when going to be there // Steve Phone #: ###-#### needs fire first
|
FIRE-Final Inspection | 2/21/2017 | 2/21/2017 | 2/21/2017 | P | FAIL |
Jim Page
|
|
|
No fire extinguishers mounted in corridors of interior storage units, fire extinguishers need to be mounted per note number 1 of the fire code review comments, a total of 7 need to be installed.
|
PubWorks Occupancy Approval | 1/19/2017 | 1/19/2017 | 1/19/2017 | | DONE |
Tiffany Lowery
|
|
|
|
Zoning Approval | 1/13/2017 | 1/13/2017 | 1/13/2017 | | DONE |
Andrea Tuning
|
|
|
|
BLD-Other | 1/10/2017 | 1/11/2017 | 1/11/2017 | P | PASS |
Jim Storey
|
|
|
Steve// fire wall insp Phone #: ###-#### gyp base layer ok
|
BLD-Aging Inspection | 12/2/2016 | 12/2/2016 | 12/2/2016 | | PASS |
Jim Storey
|
|
|
|
BLD-Foundation | 7/21/2016 | 7/21/2016 | 7/21/2016 | P | PASS |
Jim Storey
|
|
|
Wall // Manuel Phone #: ###-####
|
BLD-Footing | 7/20/2016 | 7/20/2016 | 7/20/2016 | P | PASS |
Jim Storey
|
|
|
Manuel Phone #: ###-####
|
Place hold on job | 7/11/2016 | | 7/12/2016 | | DONE |
Carlos Velazquez
|
|
|
DO NOT ISSUE WITHOUT BLD16-01515, BLD16-01652 TO BLD16-01655 AND BLD16-01691
|
Issue PAID IN FULL permit | | | 7/12/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/12/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 7/11/2016 | | |
|
|
|
|
Plan assigned to (AJS) | 5/18/2016 | 5/18/2016 | 7/11/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st Review completed Building I
|
Routing - PLAN CHECK | 7/6/2016 | | 7/11/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/11/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/11/2016 | | DONE |
|
|
|
***all requirments met 7-12-16 /CEV
Needs GC form & Revised Cert of Value
|
Routing - PLAN CHECK | 6/20/2016 | | 6/28/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing Off Site - STRUCTURAL | 6/20/2016 | | 6/27/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - FIRE | 6/20/2016 | 6/20/2016 | 6/20/2016 | | PASS |
Katie Marron
|
|
|
Signed off on all individual permits. Revised report attached to each case.
|
Routing - Erosion and Sediment | 6/20/2016 | | 6/20/2016 | | PASS |
Evan Jenkins
|
|
|
|
Route to Impact Fee Review | 6/8/2016 | 6/11/2016 | 6/10/2016 | | PASS |
Cindy M. Gould
|
|
|
|
1st review completed | | | 6/8/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 5/18/2016 | | 6/8/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing PW Solid Waste | 5/18/2016 | | 6/7/2016 | | PASS |
Peter J. McCullough
|
|
|
|
Routing Off Site - STRUCTURAL | 5/18/2016 | | 5/26/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing PW Grading-Hillside | 5/18/2016 | | 5/24/2016 | | CANC |
Jason C. Taylor
|
|
|
No review required, not hillside project. JCT
|
Routing - FIRE | 5/18/2016 | 5/18/2016 | 5/23/2016 | | FAIL |
Scott Arellano
|
|
|
Attached comments to plans. Emailed applicant plan review report.
|
Routing PW Sewer Design | 5/18/2016 | | 5/20/2016 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing PW Street Lights | 5/18/2016 | | 5/19/2016 | | PASS |
Tom Marshall
|
|
|
No street light required.
|
Routing - PLANNING Land Div | 5/18/2016 | | 5/19/2016 | | PASS |
Todd Tucker
|
|
|
|
Routing - Addressing | 5/18/2016 | | 5/19/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - MECHANICAL | 5/18/2016 | | 5/19/2016 | | PASS |
Troy James
|
|
|
Redlined gas pipe sizing
|
Routing - PLUMBING | 5/18/2016 | | 5/18/2016 | | PASS |
Daryl Spivey
|
|
|
Provide 3 in. minimum to W/C and No branch lines to be taken off before DCVA.
|
Routing - Design Review | 5/18/2016 | | 5/18/2016 | | PASS |
Andrea Tuning
|
|
|
|
Pending Assignment by TLW | 5/18/2016 | | 5/18/2016 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - PUBLIC WORKS | 5/18/2016 | | 5/18/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 5/18/2016 | | 5/18/2016 | | FAIL |
Evan Jenkins
|
|
|
Full ESC Narrative Required: SWPPP is Required to meet Federal EPA Requirements due to the project being over 1 Acre in Disturbance Size (5 Acres), which the City will accept for this project.
Evan Jenkins 794.3958
|
Routing PW Drainage | 5/18/2016 | | 5/18/2016 | | PASS |
Brian Murphy
|
|
|
|
Intake Approval | | | 5/13/2016 | | PASS |
|
|
|
|
Intake Approval | | | 5/4/2016 | | FAIL |
|
|
|
5-4-16 Carl Madsen ###-####
Form 30 is required to be signed by the owner
Several sheets have been uploaded in the wrong orientation please re-upload the sheets in the correct orientation.
Please provide on the cover sheet a building code analysis for each building in the complex to include individual building areas, occupancy classification, occupant loads and type of construction for each building.
|
Application received | | | 5/2/2016 | | DONE |
|
|
|
Application submitted via PDS Online on May 2 2016 11:42AM
|