Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD16-01525
StatusFinaled
Name Doug Wheeler
Site Address 1115 N CLOVERDALE RD
Project NameA New Storage Building (CSDA)
Customer Number 
ePlanReviewYes
Description
(SEVENTH DAY ADVENTIST - Storage Building) A new 3,200 s.f. storage building for the existing church on the same site. This building is not fire sprinklered and meets IECC definition of low energy building. Scope of work includes: construction of poured concrete foundation, construction of wood frame exterior walls, construction of a pre-manufactured roof truss system, [construction of partition walls to create: an accessible restroom and 7 distinct rooms utilized by different church affiliated organizations], new plumbing, new electrical, new interior finishes, new exterior finishes, and related site work. NOTE: a separate racking permit is required if racking exceeds 8 feet in hieght. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 11/18/201712/12/2017 DONE
Mailed 12-13-17
Permanent Occupancy  11/8/2017 DONE
BLD-Final10/11/201710/12/201710/12/2017PPASS
DetailsMike Jordan
Doug Phone #: ###-####. Ok for perm occ.
PubWorks Occupancy Approval10/12/201710/12/201710/12/2017 DONE
DetailsTiffany Lowery
FIRE-Final Inspection8/23/20178/24/20178/24/2017APASS
DetailsTroy Cobbley
Life safety passed
Zoning Approval8/21/20178/21/20178/21/2017 DONE
DetailsLeon Letson
FIRE-Final Inspection8/18/20178/18/20178/18/2017PFAIL
DetailsTroy Cobbley
Provide single action hardware for the interior doors, provide tagged/mounted fire entinguishers as discussed and marked on the plans. Provide fire dept. signage as discussed.

Doug Phone #: ###-####
BLD-Final8/16/20178/18/20178/18/2017ANR
DetailsMike Jordan
Doug or ###-####-please call whgen on way Phone #: ###-####. Needs fire/life/safety, zoning and public works finals first. Caleed and notified Doug.
BLD-Framing/Rough-in1/17/20171/17/20171/17/2017PPASS
DetailsMike Jordan
Call 45 mintues to meet // Doug Phone #: ###-####. All issues resolved. ok to sheet rock.
BLD-Energy code compliance1/17/20171/17/20171/17/2017PPASS
DetailsMike Jordan
Call 45 mintues to meet // Doug Phone #: ###-####
BLD-Framing/Rough-in12/28/201612/28/201612/28/2016PPART
DetailsMike Jordan
Doug// please call ahead Phone #: ###-####. Instaal the missing h2.5's. Instaal the draft stop. Ok to insulate.
BLD-Framing/Rough-in9/20/20169/21/20169/21/2016PCANC
DetailsMike Jordan
Doug Phone #: ###-####
BLD-Wall Bracing9/21/20169/21/20169/21/2016PPASS
DetailsMike Jordan
Doug Phone #: ###-####. Interior wall bracing and remainder of exterior. ok to cover exteior.
BLD-Framing/Rough-in9/7/20169/8/20169/8/2016ACANC
DetailsMike Jordan
doug Phone #: ###-####
BLD-Wall Bracing9/8/20169/8/20169/8/2016APASS
DetailsMike Jordan
doug Phone #: ###-####
BLD-Foundation8/1/20168/2/20168/2/2016PPASS
DetailsMike Jordan
Shawn Phone #: ###-####
BLD-Footing7/29/20168/1/20168/1/2016PPASS
DetailsMike Jordan
Phone #: ###-####
BLD-Conference7/25/20167/26/20167/26/2016ADONE
DetailsMike Jordan
Reviewed footing and foundation plan and awnsered questions regarding interior column pad footings and thickend slab footings.
Print Occupancy Form  7/19/2016 DONE
Issue PAID IN FULL permit  7/19/2016 DONE
OVERRIDE  7/18/2016  
Plan assigned to (TLW)6/14/2016 7/18/2016 PASS
DetailsTim L. Woodard
1st review completed
Routing Off Site - STRUCTURAL7/18/2016 7/18/2016 PASS
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  7/18/2016 DONE
Permit Ready to Issue  7/18/2016 DONE
DetailsChristina Prado
Need RP, GC Form & Revised Certificate of Value for issuance
Routing Off Site - STRUCTURAL7/15/2016 7/15/2016 FAIL
DetailsCarl D Madsen
Routing - FIRE7/11/20167/11/20167/12/2016 PASS
DetailsKatie Marron
Revised report attached to case.
Route to Impact Fee Review7/9/20167/12/20167/11/2016 PASS
DetailsCindy M. Gould
Routing PW Drainage7/11/2016 7/11/2016 PASS
DetailsBrian Murphy
1st review completed  7/8/2016 DONE
Routing - PLAN CHECK6/14/2016 7/8/2016 PASS
DetailsTim L. Woodard
Routing Off Site - STRUCTURAL6/14/2016 7/8/2016 FAIL
DetailsTim L. Woodard
Meeting  6/29/2016 DONE
Permanent Operation and Maintenance. Taken to Brian Murphy
Routing - PLANNING Land Div6/14/2016 6/17/2016 PASS
DetailsTodd Tucker
Routing - PLUMBING6/14/2016 6/17/2016 PASS
DetailsDaryl Spivey
minor plumbing for storage building
Routing - PLANNING6/14/2016 6/16/2016 PASS
DetailsLeon Letson
Routing - MECHANICAL6/14/2016 6/16/2016 PASS
DetailsTroy James
Routing - Erosion and Sediment6/14/2016 6/15/2016 PASS
DetailsAndy J. Long
General permit issued. Non-commercial/non-residential. Low risk site within large flat church campus. Need to designate valid RP or assign facility manager/applicant.
Routing - FIRE6/14/20166/14/20166/14/2016 FAIL
DetailsKatie Marron
Comments attached to case and emailed to architect.
Routing - Addressing6/14/2016 6/14/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS6/14/2016 6/14/2016 PASS
DetailsRachael Beierle
Routing PW Drainage6/14/2016 6/14/2016 FAIL
DetailsBrian Murphy
NEEDS DRAINAGE PLAN LETTERECT
Intake Approval  6/14/2016 PASS
Pending Assignment by TLW6/14/2016 6/14/2016 DONE
DetailsTim L. Woodard
Intake Approval  5/23/2016 FAIL
DetailsJavier Guzman
Please provide the following: (Incomplete submittals will not be accepted.)
• Electrical plans are required for new buildings to show: Power plan, Electrical fixture and/or equipment schedule, Panel load schedules and summary of electrical load calculations, one line diagram with details of service, grounding, feeders, transformers and sub-panels, Electrical details/notes, conduit sizes/types, conductor sizes/types, insulation types, circuit wiring sizes/types, homeruns, etc…
Application received  5/3/2016 DONE
Application submitted via PDS Online on May 3 2016 5:53AM
Intake Approval  5/3/2016 FAIL
DetailsJavier Guzman
Please provide the following: (Incomplete submittals will not be accepted.)
• Checklist (#502) must be completed by the project’s Idaho-licensed design professional of record and uploaded with the plans and documents
• The checklist is not complete unless all information is filled out, all appropriate boxes are checked and all plan page numbers are listed.
• Upload any addition plans and documents required from the checklist