Permit NumberBLD16-01542
StatusFinaled
Name GREENWOOD INVESTMENTS
Site Address 1915 E RIDGECREST DR
Project Name 
Customer Number 
ePlanReviewNo
Description
**Plan Modification for retaining wall 8-23-17 - See resubmitted plans and engineering ***BJM*** WUI Zone A; Permit for the construction of a new 3,426 sq. ft., one story with a daylighted basement (main level 1,891 sq. ft., basement level 1,535 sq. ft.) single family dwelling with 4 bedrooms, 3.5 bathrooms, approximately 216 sq. ft. of covered patio/porch and a 679 sq. ft. attached garage per the approved plans, engineering, geotechnical report, ACCA report and any notations. R-1B zoning and setbacks per planning.//leg ***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/7/201911/8/201911/8/2019PPASS
DetailsBrandon Shaw
Blower door test results on Electrical Panel and paper work in HVAC paper work bin. Phone #: ###-#### Inspection requested via web by James Greenwood
DOC - Permit Finaled11/8/201911/8/201911/8/2019PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results11/8/201911/8/201911/8/2019PDONE
DetailsBrandon Shaw
ACH50- 3.6
BLD-Final11/1/201911/1/201911/1/2019PFAIL
DetailsDave Hannah
Garage Code: 3412 Phone #: ###-#### Inspection requested via web by James Greenwood c/n on site
PubWorks Occupancy Approval10/28/201910/28/201910/28/2019 DONE
DetailsMelissa Jannusch
A letter from the applicant’s Civil Engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.

BLD-Wall cover5/10/20185/11/20185/11/2018APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by James Greenwood
BLD-Energy code compliance5/10/20185/11/20185/11/2018APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by James Greenwood
BLD-Framing/Rough-in5/10/20185/10/20185/10/2018PPASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by James Greenwood
BLD-Wall Bracing5/8/20185/8/20185/8/2018PPASS
DetailsDave Hannah
BLD-Wall cover5/7/20185/8/20185/8/2018APEND
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by James Greenwood
BLD-Energy code compliance5/7/20185/8/20185/8/2018APART
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by James Greenwood air seal ok
BLD-Framing/Rough-in5/7/20185/8/20185/8/2018APART
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by James Greenwood ok to insulate c/n on site
BLD-Other4/16/20184/17/20184/17/2018APASS
DetailsDave Hannah
Needing to get the soffit inspected to meet requirements of WUI fire district.
Ladders in house to assist. Contact: Jim Greenwood Phone #: ###-#### Inspection requested via web by James Greenwood
Plan Modification Accepted  2/23/2018 DONE
new manual j report
Routing - MECHANICAL2/23/2018 2/23/2018 PASS
DetailsTroy James
resubmitted manual j report
BLD-Aging Inspection11/10/201711/10/201711/17/2017 PEND
DetailsDave Hannah
CHANGE STATUS TO (ISS)  8/24/2017 DONE
(F) Reprint permit  8/24/2017 DONE
OVERRIDE  8/23/2017  
Plan assigned to (BJM)8/7/20178/7/20178/23/2017 DONE
DetailsBrian McGowan
**8/7 plan mod for retainig wall, routedt to hillside then plan check
Routing - PUBLIC WORKS7/10/2017 8/23/2017 PASS
DetailsRachael Beierle
Telephone call  8/23/2017 DONE
Spoke with Jim informing him that the plan mod is ready and the fee amount due
Case Summary (BLD)  8/23/2017 DONE
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  8/23/2017 DONE
DetailsBrian McGowan
Permit Ready to Issue  8/23/2017 DONE
DO NOT REISSUE PLAN MOD
Routing - PLAN CHECK8/16/2017 8/23/2017 PASS
DetailsBrian McGowan
Routing - FRONT DESK4/26/2017 8/23/2017 PASS
DetailsBrittany Hill
Routing - PLANNING8/16/2017 8/18/2017 PASS
DetailsDavid Moser
Approved as redlined; the combined height of the retaining walls along rear property and where they are closer then five feet shall not exceed 6 feet in height as measure from top of wal to finished grade
Routing PW Grading-Hillside8/16/2017 8/16/2017 PASS
DetailsMelissa Jannusch

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Melissa Jannusch at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

Plan resubmittals received  8/15/2017 DONE
3 copies of retaining wall calculations, taken to Brian M
Routing PW Grading-Hillside8/7/2017 8/8/2017 FAIL
DetailsMelissa Jannusch
Needs calculations for retaining walls. See e-mail to Rodger Smith dated 8/8/2017.
Plan Modification Accepted  8/7/2017 DONE
modification to retaining wall for this lot. routed two copies plan sheet C2.0 to hillside/grading then plan check
CHANGE STATUS TO (ISS)  7/7/2017 DONE
as per Brian McGowan and Jason T ok to change status back to issue
Routing - PUBLIC WORKS7/6/2017 7/6/2017 FAIL
DetailsRachael Beierle
fail see JCT. do not have plans. JCT routed them back to front desk.
BLD-Foundation6/29/20176/29/20176/29/2017PPASS
DetailsDave Hannah
Pouring at 1 - Advardo Phone #: ###-####
BLD-Footing6/27/20176/28/20176/28/2017APASS
DetailsDave Hannah
Navarro Phone #: ###-#### pour 9:45
PubWorks Subgrade Approval6/27/20176/27/20176/27/2017 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
BLD-Foundation5/30/20175/31/20175/31/2017APASS
DetailsDave Hannah
Requesting 10AM - Advardo Phone #: ###-####
BLD-Footing5/23/20175/24/20175/24/2017APASS
DetailsDave Hannah
Alvaro Phone #: ###-#### basement ftgs ok
PubWorks Subgrade Approval5/24/20175/24/20175/24/2017 DONE
DetailsJason C. Taylor
***Note - Contractor is responsible for all footing elevations and resubmital of grading plans. If grading plans or retaining wall proposed in rear yard does not work with elevation of foundation then contractor may have to remove/modify footings to adjust grade at his expense. City of Boise inspectors are not liable for any elevation issues that contractor may encounter.***A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
BLD-Other4/25/20174/26/20174/26/2017ACANC
DetailsDave Hannah
fire rated soffit inspection// Luke ###-####
Plan assigned to (BJM)4/20/20174/20/20174/26/2017 DONE
DetailsBrian McGowan
New grading plans taken to JCT
Routing - PLAN CHECK4/20/2017 4/26/2017 PASS
DetailsBrian McGowan
As per Jason Taylor, only the Grading Plan for retaining walls is needed. No modifications were made for Plan Check.
Routing PW Grading-Hillside4/26/2017 4/26/2017 FAIL
DetailsJason C. Taylor
Resubmittals are not approvable. Need drainage details, swales, retaining wall calcualtions etc. Talked with Jim G. and he will resubmit or withdraw resubmittals. Routed to Front Counter. JCT
Plan resubmittals received  4/20/2017 DONE
Three copies of sheets CG-101,CG-102,CG-501, C-1.0, C-1.1, C-1.2, C-2.0 and C-2.1 taken to Brian Mc
BLD-Aging Inspection4/12/20174/12/20174/17/2017 PEND
DetailsDave Hannah
BLD-Aging Inspection4/11/20174/11/20174/17/2017 PEND
DetailsDave Hannah
OVERRIDE  5/27/2016  
Inspection Record Card- Bld  5/27/2016 DONE
Telephone call  5/27/2016 DONE
called James- let him know that permit is ready for pick up and fees due
Issue PAID IN FULL permit  5/27/2016 DONE
Routing - MECHANICAL5/27/2016 5/27/2016 PASS
DetailsTroy James
PLANS/APPL TAKEN TO FRONT DESK  5/27/2016 DONE
Permit Ready to Issue  5/27/2016 DONE
All Met
Plan assigned to (LEG) Tisha5/4/2016 5/27/2016 DONE
DetailsTisha Gallop
1st review 5/25; mechanical
Telephone call  5/26/2016 DONE
e-mailed applicant and left voice message 1st review done; need Man J submitted.
Routing - PLAN CHECK5/20/2016 5/25/2016 PASS
DetailsTisha Gallop
pending approval by mechanical
Case Summary (BLD)  5/25/2016 DONE
1st review completed  5/25/2016 FAIL
pending approval by mechanical
Routing - FIRE5/18/2016 5/20/2016 PASS
DetailsScott Arellano
No comments attached. This project has been evaluated for FD vehicle access and water supply.
Routing - Erosion and Sediment5/18/2016 5/18/2016 PASS
DetailsEvan Jenkins
(Site prep inspection and approval required prior to earth disturbance)

Permit for the construction of a new 3,426 sq. ft., one story with a basement (first story 1,891 sq. ft., basement level 1,535 sq. ft.) single family dwelling with 4 bedrooms, 3.5 bathrooms, approximately *** sq. ft. of covered patio/porch and a *** sq. ft. attached garage
Routing - MECHANICAL5/16/2016 5/18/2016 FAIL
DetailsTroy James
No manual j report. Emailed the applicant. Email to applicant unable to deliver.
Routing - PLANNING5/16/2016 5/16/2016 PASS
DetailsDavid Moser
CFH16-00022
Routing PW Grading-Hillside5/5/2016 5/16/2016 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
Routing - PUBLIC WORKS  5/16/2016 PASS
Routing PW Sewer Rating5/5/2016 5/5/2016 PASS
DetailsRachael Beierle
Routing - Addressing5/4/2016 5/5/2016 PASS
DetailsLaura Hunter
Plans ACCEPTED BY PLAN TECH  5/4/2016 DONE
Intake Approval  5/4/2016 PASS
Override - Parcel Holds  5/4/2016  
Recd Pcfee & Taken To Pln CK  5/4/2016 DONE
Application received 5/3/2016