BLD-Final | 11/7/2019 | 11/8/2019 | 11/8/2019 | P | PASS |
Brandon Shaw
|
|
|
Blower door test results on Electrical Panel and paper work in HVAC paper work bin. Phone #: ###-#### Inspection requested via web by James Greenwood
|
DOC - Permit Finaled | 11/8/2019 | 11/8/2019 | 11/8/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 11/8/2019 | 11/8/2019 | 11/8/2019 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 3.6
|
BLD-Final | 11/1/2019 | 11/1/2019 | 11/1/2019 | P | FAIL |
Dave Hannah
|
|
|
Garage Code: 3412 Phone #: ###-#### Inspection requested via web by James Greenwood c/n on site
|
PubWorks Occupancy Approval | 10/28/2019 | 10/28/2019 | 10/28/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s Civil Engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Wall cover | 5/10/2018 | 5/11/2018 | 5/11/2018 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by James Greenwood
|
BLD-Energy code compliance | 5/10/2018 | 5/11/2018 | 5/11/2018 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by James Greenwood
|
BLD-Framing/Rough-in | 5/10/2018 | 5/10/2018 | 5/10/2018 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by James Greenwood
|
BLD-Wall Bracing | 5/8/2018 | 5/8/2018 | 5/8/2018 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Wall cover | 5/7/2018 | 5/8/2018 | 5/8/2018 | A | PEND |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by James Greenwood
|
BLD-Energy code compliance | 5/7/2018 | 5/8/2018 | 5/8/2018 | A | PART |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by James Greenwood air seal ok
|
BLD-Framing/Rough-in | 5/7/2018 | 5/8/2018 | 5/8/2018 | A | PART |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by James Greenwood ok to insulate c/n on site
|
BLD-Other | 4/16/2018 | 4/17/2018 | 4/17/2018 | A | PASS |
Dave Hannah
|
|
|
Needing to get the soffit inspected to meet requirements of WUI fire district. Ladders in house to assist. Contact: Jim Greenwood Phone #: ###-#### Inspection requested via web by James Greenwood
|
Plan Modification Accepted | | | 2/23/2018 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 2/23/2018 | | 2/23/2018 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Aging Inspection | 11/10/2017 | 11/10/2017 | 11/17/2017 | | PEND |
Dave Hannah
|
|
|
|
CHANGE STATUS TO (ISS) | | | 8/24/2017 | | DONE |
|
|
|
|
(F) Reprint permit | | | 8/24/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 8/23/2017 | | |
|
|
|
|
Plan assigned to (BJM) | 8/7/2017 | 8/7/2017 | 8/23/2017 | | DONE |
Brian McGowan
|
|
|
**8/7 plan mod for retainig wall, routedt to hillside then plan check
|
Routing - PUBLIC WORKS | 7/10/2017 | | 8/23/2017 | | PASS |
Rachael Beierle
|
|
|
|
Telephone call | | | 8/23/2017 | | DONE |
|
|
|
Spoke with Jim informing him that the plan mod is ready and the fee amount due
|
Case Summary (BLD) | | | 8/23/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/23/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 8/23/2017 | | DONE |
|
|
|
DO NOT REISSUE PLAN MOD
|
Routing - PLAN CHECK | 8/16/2017 | | 8/23/2017 | | PASS |
Brian McGowan
|
|
|
|
Routing - FRONT DESK | 4/26/2017 | | 8/23/2017 | | PASS |
Brittany Hill
|
|
|
|
Routing - PLANNING | 8/16/2017 | | 8/18/2017 | | PASS |
David Moser
|
|
|
Approved as redlined; the combined height of the retaining walls along rear property and where they are closer then five feet shall not exceed 6 feet in height as measure from top of wal to finished grade
|
Routing PW Grading-Hillside | 8/16/2017 | | 8/16/2017 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Melissa Jannusch at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
|
Plan resubmittals received | | | 8/15/2017 | | DONE |
|
|
|
3 copies of retaining wall calculations, taken to Brian M
|
Routing PW Grading-Hillside | 8/7/2017 | | 8/8/2017 | | FAIL |
Melissa Jannusch
|
|
|
Needs calculations for retaining walls. See e-mail to Rodger Smith dated 8/8/2017.
|
Plan Modification Accepted | | | 8/7/2017 | | DONE |
|
|
|
modification to retaining wall for this lot. routed two copies plan sheet C2.0 to hillside/grading then plan check
|
CHANGE STATUS TO (ISS) | | | 7/7/2017 | | DONE |
|
|
|
as per Brian McGowan and Jason T ok to change status back to issue
|
Routing - PUBLIC WORKS | 7/6/2017 | | 7/6/2017 | | FAIL |
Rachael Beierle
|
|
|
fail see JCT. do not have plans. JCT routed them back to front desk.
|
BLD-Foundation | 6/29/2017 | 6/29/2017 | 6/29/2017 | P | PASS |
Dave Hannah
|
|
|
Pouring at 1 - Advardo Phone #: ###-####
|
BLD-Footing | 6/27/2017 | 6/28/2017 | 6/28/2017 | A | PASS |
Dave Hannah
|
|
|
Navarro Phone #: ###-#### pour 9:45
|
PubWorks Subgrade Approval | 6/27/2017 | 6/27/2017 | 6/27/2017 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Foundation | 5/30/2017 | 5/31/2017 | 5/31/2017 | A | PASS |
Dave Hannah
|
|
|
Requesting 10AM - Advardo Phone #: ###-####
|
BLD-Footing | 5/23/2017 | 5/24/2017 | 5/24/2017 | A | PASS |
Dave Hannah
|
|
|
Alvaro Phone #: ###-#### basement ftgs ok
|
PubWorks Subgrade Approval | 5/24/2017 | 5/24/2017 | 5/24/2017 | | DONE |
Jason C. Taylor
|
|
|
***Note - Contractor is responsible for all footing elevations and resubmital of grading plans. If grading plans or retaining wall proposed in rear yard does not work with elevation of foundation then contractor may have to remove/modify footings to adjust grade at his expense. City of Boise inspectors are not liable for any elevation issues that contractor may encounter.***A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Other | 4/25/2017 | 4/26/2017 | 4/26/2017 | A | CANC |
Dave Hannah
|
|
|
fire rated soffit inspection// Luke ###-####
|
Plan assigned to (BJM) | 4/20/2017 | 4/20/2017 | 4/26/2017 | | DONE |
Brian McGowan
|
|
|
New grading plans taken to JCT
|
Routing - PLAN CHECK | 4/20/2017 | | 4/26/2017 | | PASS |
Brian McGowan
|
|
|
As per Jason Taylor, only the Grading Plan for retaining walls is needed. No modifications were made for Plan Check.
|
Routing PW Grading-Hillside | 4/26/2017 | | 4/26/2017 | | FAIL |
Jason C. Taylor
|
|
|
Resubmittals are not approvable. Need drainage details, swales, retaining wall calcualtions etc. Talked with Jim G. and he will resubmit or withdraw resubmittals. Routed to Front Counter. JCT
|
Plan resubmittals received | | | 4/20/2017 | | DONE |
|
|
|
Three copies of sheets CG-101,CG-102,CG-501, C-1.0, C-1.1, C-1.2, C-2.0 and C-2.1 taken to Brian Mc
|
BLD-Aging Inspection | 4/12/2017 | 4/12/2017 | 4/17/2017 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 4/11/2017 | 4/11/2017 | 4/17/2017 | | PEND |
Dave Hannah
|
|
|
|
OVERRIDE | | | 5/27/2016 | | |
|
|
|
|
Inspection Record Card- Bld | | | 5/27/2016 | | DONE |
|
|
|
|
Telephone call | | | 5/27/2016 | | DONE |
|
|
|
called James- let him know that permit is ready for pick up and fees due
|
Issue PAID IN FULL permit | | | 5/27/2016 | | DONE |
|
|
|
|
Routing - MECHANICAL | 5/27/2016 | | 5/27/2016 | | PASS |
Troy James
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/27/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/27/2016 | | DONE |
|
|
|
All Met
|
Plan assigned to (LEG) Tisha | 5/4/2016 | | 5/27/2016 | | DONE |
Tisha Gallop
|
|
|
1st review 5/25; mechanical
|
Telephone call | | | 5/26/2016 | | DONE |
|
|
|
e-mailed applicant and left voice message 1st review done; need Man J submitted.
|
Routing - PLAN CHECK | 5/20/2016 | | 5/25/2016 | | PASS |
Tisha Gallop
|
|
|
pending approval by mechanical
|
Case Summary (BLD) | | | 5/25/2016 | | DONE |
|
|
|
|
1st review completed | | | 5/25/2016 | | FAIL |
|
|
|
pending approval by mechanical
|
Routing - FIRE | 5/18/2016 | | 5/20/2016 | | PASS |
Scott Arellano
|
|
|
No comments attached. This project has been evaluated for FD vehicle access and water supply.
|
Routing - Erosion and Sediment | 5/18/2016 | | 5/18/2016 | | PASS |
Evan Jenkins
|
|
|
(Site prep inspection and approval required prior to earth disturbance)
Permit for the construction of a new 3,426 sq. ft., one story with a basement (first story 1,891 sq. ft., basement level 1,535 sq. ft.) single family dwelling with 4 bedrooms, 3.5 bathrooms, approximately *** sq. ft. of covered patio/porch and a *** sq. ft. attached garage
|
Routing - MECHANICAL | 5/16/2016 | | 5/18/2016 | | FAIL |
Troy James
|
|
|
No manual j report. Emailed the applicant. Email to applicant unable to deliver.
|
Routing - PLANNING | 5/16/2016 | | 5/16/2016 | | PASS |
David Moser
|
|
|
CFH16-00022
|
Routing PW Grading-Hillside | 5/5/2016 | | 5/16/2016 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - PUBLIC WORKS | | | 5/16/2016 | | PASS |
|
|
|
|
Routing PW Sewer Rating | 5/5/2016 | | 5/5/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Addressing | 5/4/2016 | | 5/5/2016 | | PASS |
Laura Hunter
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/4/2016 | | DONE |
|
|
|
|
Intake Approval | | | 5/4/2016 | | PASS |
|
|
|
|
Override - Parcel Holds | | | 5/4/2016 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/4/2016 | | DONE |
|
|
|
|
Application received | | 5/3/2016 | | | |
|
|
|
|