First Notice | | 7/16/2016 | 8/11/2016 | | DONE |
|
|
|
mailed 8-11-16
|
Permanent Occupancy | | | 7/6/2016 | | DONE |
|
|
|
|
BLD-Final | 6/28/2016 | 6/29/2016 | 6/29/2016 | P | PASS |
Tony Young
|
|
|
Scott Phone #: ###-####
|
FIRE-Final Inspection | 6/28/2016 | 6/29/2016 | 6/29/2016 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Lever hardware to be installed on the two connecting doors as discussed and as per plans prior to a building inspection.
|
BLD-Final | 5/24/2016 | 5/25/2016 | 5/25/2016 | P | PART |
Mike Jordan
|
|
|
Scott Phone #: ###-####. Ok to occupy south half only. paint and carpet work only done on this side.
|
FIRE-Final Inspection | 5/24/2016 | 5/25/2016 | 5/25/2016 | A | PART |
Troy Cobbley
|
|
|
The south suite, 180, life safety passed. Contractor to provide verification that the south most exit door can be deleted prior to a final sign off.
|
Permit Ready to Issue | | | 5/6/2016 | | DONE |
|
|
|
need GC contractor is the applicant
|
Print Occupancy Form | | | 5/6/2016 | | DONE |
|
|
|
|
Telephone call | | | 5/6/2016 | | DONE |
|
|
|
Spoke with Scott informing him that this permit is ready, the fee amount that is due and that he will need to fill out a GC Form.
|
Issue PAID IN FULL permit | | | 5/6/2016 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 5/4/2016 | | 5/5/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 5/4/2016 | | 5/5/2016 | | PASS |
Tim L. Woodard
|
|
|
|
1st review completed | | | 5/5/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/5/2016 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 5/5/2016 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/4/2016 | | DONE |
|
|
|
|
Intake Approval | | | 5/4/2016 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/4/2016 | | DONE |
|
|
|
|
Application received | | 5/3/2016 | | | |
|
|
|
|