BLD-Blower Door Test Results | 12/20/2018 | 12/20/2018 | 12/20/2018 | P | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by SHANE JAYO/// 3.06
|
BLD-Final | 12/20/2018 | 12/20/2018 | 12/20/2018 | P | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by SHANE JAYO
|
DOC - Permit Finaled | 12/20/2018 | 12/20/2018 | 12/20/2018 | P | PASS |
Tony Young
|
|
|
|
PubWorks Occupancy Approval | 12/13/2018 | 12/13/2018 | 12/13/2018 | | DONE |
Melissa Jannusch
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Aging Inspection | 12/7/2018 | 12/7/2018 | 12/8/2018 | | PASS |
Tony Young
|
|
|
|
BLD-Aging Inspection | 12/6/2018 | 12/6/2018 | 12/8/2018 | | PASS |
Tony Young
|
|
|
|
Routing - MECHANICAL | 9/19/2018 | | 9/19/2018 | | PASS |
Troy James
|
|
|
Resubmitted manual j report
|
BLD-Energy code compliance | 7/24/2018 | 7/25/2018 | 7/25/2018 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by SHANE JAYO
|
BLD-Framing/Rough-in | 7/10/2018 | 7/11/2018 | 7/11/2018 | A | PASS |
Brandon Shaw
|
|
|
Wall bracing and framing OK to insulate
|
BLD-Wall Bracing | 6/1/2018 | 6/1/2018 | 6/1/2018 | P | NR |
Tony Young
|
|
|
|
BLD-Other | 6/1/2018 | 6/1/2018 | 6/1/2018 | P | PASS |
Tony Young
|
|
|
Soffit
|
BLD-Wall Bracing | 5/31/2018 | 6/1/2018 | 6/1/2018 | A | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by SHANE JAYO
|
BLD-Other | 5/31/2018 | 6/1/2018 | 6/1/2018 | A | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by SHANE JAYO,, soffit
|
BLD-Wall Bracing | 5/31/2018 | 5/31/2018 | 5/31/2018 | P | FAIL |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by SHANE JAYO,, need plans,, walked with faxton on part of job to show him some areas
|
BLD-Footing | 3/21/2018 | 3/23/2018 | 3/23/2018 | A | PASS |
Jim Storey
|
|
|
Bill Phone #: ###-####
|
BLD-Conference | 12/12/2017 | 12/14/2017 | 12/14/2017 | A | DONE |
Dave Hannah
|
|
|
|
BLD-Foundation | 12/13/2017 | 12/14/2017 | 12/14/2017 | A | PASS |
Dave Hannah
|
|
|
Wall // Bill Phone #: ###-####
|
BLD-Conference | 12/12/2017 | 12/15/2017 | 12/14/2017 | A | CANC |
Brandon Shaw
|
|
|
|
PubWorks Subgrade Approval | 12/13/2017 | 12/13/2017 | 12/13/2017 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Foundation | 12/11/2017 | 12/12/2017 | 12/12/2017 | A | CANC |
Brandon Shaw
|
|
|
Bill Phone #: ###-####
|
Issue PAID IN FULL permit | | | 10/4/2017 | | DONE |
|
|
|
|
Telephone call | | | 10/2/2017 | | DONE |
|
|
|
Left a message for Shane informing him this permit is going to expire in 24 days and that it has had the two extensions we allow
|
Telephone call | | | 5/4/2017 | | DONE |
|
|
|
called to let know that the fees changed-gar and patio were not included in values
|
Extend Review Timeline | | | 4/21/2017 | | DONE |
|
|
|
Final Approved 180 day extension per Adele. See documents
|
Telephone call | | | 4/19/2017 | | DONE |
|
|
|
Spoke with Shane informing him this permit is going to expire in ten days. He stated he will send in a letter requesting an extension and I informed him it would be the last 180 extension that can be done since two are granted
|
Expiration Notice | 4/10/2017 | 5/1/2017 | 4/10/2017 | | DONE |
Brittany Hill
|
|
|
|
Extend Review Timeline | | | 10/25/2016 | | DONE |
|
|
|
1st approved 180 day extension per Adele. See documents
|
Telephone call | | | 10/21/2016 | | DONE |
|
|
|
Left a message for Shane informing him that this permit is going to expire in ten days. Said he may send in a request for 180 day extension or if he is ready to pick the permit up there are fees still due.
|
Expiration Notice | 9/26/2016 | 10/17/2016 | 9/26/2016 | | DONE |
Brittany Hill
|
|
|
10/3 mailed out
|
OVERRIDE | | | 6/27/2016 | | |
|
|
|
|
Plan assigned to (BJM) | 5/6/2016 | 5/6/2016 | 6/27/2016 | | DONE |
Brian McGowan
|
|
|
due 5/25 L2 hillside - Failed, need roof detail for class "A" and information for FIRE
|
Inspection Record Card- Bld | | | 6/27/2016 | | DONE |
|
|
|
|
Telephone call | | | 6/27/2016 | | DONE |
|
|
|
called customer and notified that permit was ready
|
Telephone call | | | 6/27/2016 | | DONE |
|
|
|
called Shane to let know permit is ready and how much is owed-left message on his cell
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/27/2016 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 6/27/2016 | | DONE |
|
|
|
all requirements met
|
Case Summary (BLD) | | | 6/24/2016 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 6/22/2016 | | 6/23/2016 | | PASS |
Brian McGowan
|
|
|
|
Routing - FIRE | 6/16/2016 | 6/16/2016 | 6/22/2016 | | PASS |
Katie Marron
|
|
|
Revised report attached to case.
|
Plan resubmittals received | | | 6/15/2016 | | DONE |
|
|
|
received 3 copies of sheet 1 of 13- put on Brian's desk
|
1st review completed | | | 5/26/2016 | | FAIL |
Brian McGowan
|
|
|
Need roofing details for (1) hour rating.
|
Routing - PLAN CHECK | 5/19/2016 | | 5/25/2016 | | FAIL |
Brian McGowan
|
|
|
Need roofing details for (1) hour rating.
|
Routing - FIRE | 5/18/2016 | | 5/19/2016 | | FAIL |
Scott Arellano
|
|
|
Emailed comments to applicant. Attached plan review report to case.
|
Routing - Erosion and Sediment | 5/18/2016 | | 5/18/2016 | | PASS |
Evan Jenkins
|
|
|
(Site prep inspection and approval required prior to earth disturbance)
Permit for the construction of a new 2724 sq. ft., two story (first story 1874 sq. ft., basement 850 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately #### sq. ft. of covered patio’s/porches and 936 sq. ft. attached garage per the approved plans
|
Routing - MECHANICAL | 5/11/2016 | | 5/18/2016 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 5/10/2016 | | 5/11/2016 | | PASS |
Susan Riggs
|
|
|
|
Routing - PUBLIC WORKS | | | 5/10/2016 | | PASS |
|
|
|
|
Routing PW Grading-Hillside | 5/4/2016 | | 5/10/2016 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Plan assigned to (LEG) Tisha | 5/4/2016 | | 5/6/2016 | | DEFR |
Tisha Gallop
|
|
|
|
Routing - Addressing | 5/4/2016 | | 5/4/2016 | | PASS |
Laura Hunter
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/4/2016 | | DONE |
|
|
|
|
Intake Approval | | | 5/4/2016 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/4/2016 | | DONE |
|
|
|
|
Routing PW Sewer Rating | 5/10/2016 | | 5/4/2016 | | PASS |
Rachael Beierle
|
|
|
|
Application received | | 5/4/2016 | | | |
|
|
|
|
Routing - PLAN CHECK | | | | | |
Brian McGowan
|
|
|
|