Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD16-01563
StatusFinaled
Name PORTER REBECCA
Site Address 2708 E EASTGATE DR
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit for new 280 sq. ft. upper level deck per engineering provided. All work is to be done according to approved plans, engineering, and current local codes. //leg **A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor 384-3946.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/23/20165/24/20165/24/2016APASS
DetailsJim Storey
would like call ahead; Ben Phone #: ###-#### per the reviewed plans w/engineerers verifacations
DOC - Permit Finaled5/24/20165/24/20165/24/2016PPASS
DetailsJim Storey
per the reviewed plans w/engineerers verifacations
PubWorks Occupancy Approval5/24/20165/24/20165/24/2016 DONE
DetailsJason C. Taylor
Structural engineer's approval has been recieved. Project may be finaled when building inspector is ready. JCT
Routing Walk-In (BLD)5/17/20165/17/20165/17/2016APASS
DetailsTisha Gallop
Routing Walk-In (PW Hillside)5/17/20165/17/20165/17/2016PPASS
DetailsJason C. Taylor

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
Plan assigned to (LEG) Tisha5/17/2016 5/17/2016 DONE
DetailsTisha Gallop
Inspection Record Card- Bld  5/17/2016 DONE
PLANS/APPL TAKEN TO FRONT DESK  5/17/2016 DONE
Permit Ready to Issue  5/17/2016 DONE
all requirments met
Issue PAID IN FULL permit  5/17/2016 DONE
Routing Walk-In (Zoning)5/5/20165/5/20165/5/2016APASS
DetailsDavid Moser
Routing Walk-In (BLD)5/5/20165/5/20165/5/2016AFAIL
DetailsBrian McGowan
No engineering provided for Hillside submittal.
Work was stopped for no permit.
1st review completed  5/5/2016 FAIL
DetailsBrian McGowan
No engineering provided for Hillside submittal.
Work was stopped for no permit.
Routing - PLAN CHECK5/5/2016 5/5/2016 FAIL
DetailsBrian McGowan
No engineering provided for Hillside submittal.
Work was stopped for no permit.
Place hold on job5/5/2016 5/5/2016 DONE
DetailsBrittany Hill
Need letter from Rebecca Porter; showing as the only owner
Application received 5/5/2016