Permit Information
Permit NumberBLD16-01603
StatusFinaled
Name BACH LAND AND DEVELOPMENT LLC
Site Address 7794 W SAXTON DR
Project NameThe Kensington Apt. Bldg. Z
Customer NumberSEE "COMMENTS" FIELD
ePlanReview 
Description
(THE KENSINGTON APARTMENTS – BUILDING Z – UNIT 3.d – 2ND UNIT FROM WEST) (DRH14-00349) (PUD14-00003) (NO FINAL OCCUPANCY TO BE APPROVED UNTIL VERIFICATION OF A RECORDED SEWER LINE EASEMENT LOCATED ON THE NORTH SIDE OF THIS BUILDING IS PROVIDED.) The drawings for a total of 23 Townhouses, each having a separate permit, are filed under permit BLD15-01119 in ePlanReview. This building is not required to have a fire sprinkler system. To construct a 2 story townhome having a total floor area of about 2,124 square feet (1,124 square feet 1st story and 1,000 square feet 2nd story) and 3 bedrooms and a garage in compliance with the 2012 IRC. Because it has two stories, it is not required to comply as a Type B dwelling unit. Work is to include concrete footings, concrete foundations, concrete slab on grade, wood stud exterior bearing and shear walls, wood stud interior bearing and shear walls, wood floor joists, engineered wood trusses, a 2-hr property line wall where buildings are common, 1-hr property line walls where buildings are not common, fire rated roof sheathing protection in lieu of parapets, interior stairways, millwork, and finishes. All utilities that serve a townhome are required to be located on the same parcel as the townhome. Utilities serving one townhome (i.e. gas, water, sewer, electrical, telecommunications, etc.) are not allowed to cross over another parcel or through another townhome. At the utilities easement located either in front or in back of the parcel, the utilities are allowed to become common. The design for the wood roof trusses are a deferred submittal item. The work is required to comply with the approved drawings, with the plan review report, with the structural design, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Zoning Approval4/18/20184/18/20184/18/2018 PASS
DetailsKatelyn Menuge
Letter of compliance/Occupancy  1/18/2018 DONE
CHANGE STATUS TO (FNL)  1/18/2018 DONE
BLD-Final1/12/20181/12/20181/12/2018APASS
DetailsTony Young
Ed Phone #: ###-####
BLD-Final1/10/20181/11/20181/12/2018PNR
DetailsTony Young
Ed Phone #: ###-####
FIRE-Final Inspection1/10/20181/11/20181/11/2018APASS
DetailsTroy Cobbley
life safety passed

Ed Phone #: ###-####
BLD-Energy code compliance11/29/201711/29/201711/29/2017PPASS
DetailsTony Young
ed
BLD-Framing/Rough-in11/28/201711/28/201711/28/2017PPASS
DetailsTony Young
Ed Phone #: ###-####
BLD-Energy code compliance8/15/20178/15/20178/15/2017PPART
DetailsTony Young
Berry Phone #: ###-#### ,, insulation behind tubs/shower areas ok after fireblocking plate lines
BLD-Wall Bracing7/10/20177/11/20177/11/2017APART
DetailsTony Young
Shear // Ed Phone #: ###-####,, exterior ok
BLD-Footing3/9/20173/10/20173/10/2017APART
DetailsTony Young
Ed Phone #: ###-####,, ok pending special inspection results/report
Plan assigned to (CJW)8/11/20168/11/201612/6/2016 PASS
DetailsCarl Westfall
Bldg Z - 7794 W. Saxton Dr.
Routing - PLAN CHECK12/5/2016 12/6/2016 PASS
DetailsCarl Westfall
PLANS/APPL TAKEN TO FRONT DESK  12/6/2016 DONE
Permit Ready to Issue  12/6/2016 DONE
All Met (BLD15-01119, 01120, 01131, 01132, 01133, 01134 AND BLD16-01590 TO BLD16-01606)
Issue PAID IN FULL permit  12/6/2016 DONE
Inspection Record Card- Bld  12/6/2016 DONE
Routing - PLUMBING12/5/2016 12/5/2016 PASS
DetailsBill VanDegrift
Four bedroom unit water heaters to have an 80 gallon firs hour recovery rating in accordance with conversations with James McLaughlin and the design team.
Plan resubmittals received  12/5/2016 DONE
Plan resubmittals requested  12/1/2016 DONE
1st review completed  11/23/2016 DONE
Routing PW Drainage11/7/2016 11/22/2016 PASS
DetailsJason C. Taylor
Routing - Design Review11/7/2016 11/22/2016 PASS
DetailsJosh Wilson
Routing Off Site - STRUCTURAL11/7/2016 11/22/2016 PASS
DetailsCarl Westfall
Dave Haugland AHJ
Routing - PUBLIC WORKS11/7/2016 11/22/2016 PASS
DetailsRachael Beierle
Routing PW Street Lights11/7/2016 11/22/2016 PASS
DetailsTom Marshall
Route to Impact Fee Review11/7/201611/10/201611/17/2016 PASS
DetailsCindy M. Gould
Routing - PLANNING11/8/2016 11/16/2016 PASS
DetailsDavid Moser
Routing - PLUMBING11/7/2016 11/16/2016 FAIL
DetailsBill VanDegrift
Routing - MECHANICAL11/16/2016 11/16/2016 PASS
DetailsTroy James
Routing - FIRE11/7/2016 11/15/2016 PASS
DetailsScott Arellano
Routing - PLAN CHECK11/1/2016 11/14/2016 PASS
DetailsCarl Westfall
Approval after Structural approved
Routing - MECHANICAL11/7/2016 11/8/2016 FAIL
DetailsTroy James
Routing - PLANNING Land Div11/7/2016 11/8/2016 PASS
DetailsTodd Tucker
Routing - Erosion and Sediment11/7/2016 11/8/2016 PASS
DetailsAndy J. Long
Intake Approval  11/7/2016 PASS
DetailsCarl Westfall
Permits desk did not route in ePlanReview on November 1. Routing was started by the Plans Examiner on November 7 after it was determined how fees would be resolved.
Routing - Addressing11/7/2016 11/7/2016 PASS
DetailsLaura Hunter
Recd Pcfee & Taken To Pln CK  11/1/2016 DONE
Plan Reviewer's activity  11/1/2016 PASS
Plan intake approved
Plans ACCEPTED BY PLAN TECH  11/1/2016 DONE
Intake Approval  10/20/2016 FAIL
(10-20-16) Please see the circled items on the Plan Intake Checklist and resolve each item as noted.
Intake Approval  9/13/2016 FAIL
(9-13-16) Please see the circled items on the Plan Intake Checklist and resolve each item as noted. This plan intake was delayed while the Building Official investigated whether it could come in without a recorded subdivision plat. It was decided that it could not be submitted without the plat.
Intake Approval  8/17/2016 FAIL
(8-17-16) Please provide the following for Phase 3:

1) Fill out and upload into the documents folder a completed 402 plan intake checklist.

2) Detail how property line walls will be constructed, including the common portion of the wall and the portion that is not common. Detail how the eaves will be placed relative to property line walls. 2-hr walls must extend all the way to the underside of the highest roof deck. Detail how laydown parapets will be constructed. Exterior walls at property lines must be 1-hr rated from both sides.

3) Upload a copy of the approved and recorded subdivision plat.

With this information, a plan intake review for Phase 3 can be completed.
Plan Reviewer's activity  5/9/2016 DONE
The applicant decided to change Buildings B, C, X, Y, Z, and AA to townhomes with property lines between each dwelling unit. They will be regulated by the 2012 IRC and will not be required to have a fire sprinkler system.
Intake Approval  5/9/2016 FAIL
(5-9-16) Please provide the following for Phase 3:

1) Upload a separate application 402 for each of the 23 dwelling units into the documents folder. Use the addresses, permit numbers, and unit types on the applications as redlined on Sheet A0.0.
2) Fill out and upload into the documents folder a completed 402 plan intake checklist.
3) Detail how property line walls will be constructed, including the common portion of the wall and the portion that is not common. Detail how the eaves will be placed relative to property line walls.
4) Provide stairway details that represent the interior stairways.
5) Upload a copy of the approved and recorded subdivision plat.
6) Upload drawings showing each dwelling having its own electrical service.

With this information, a plan intake review for Phase 3 can be completed.
Application received 5/6/2016