Third Notice | | 2/17/2018 | 4/16/2018 | | DONE |
Christina Prado
|
|
|
On Hold for final values
|
Third Notice | | 1/17/2018 | 2/12/2018 | | DONE |
|
|
|
Mailed 2-13-18
|
Third Notice | | 12/17/2017 | 1/12/2018 | | DONE |
|
|
|
Mailed 1-12-18
|
Second Notice | | 11/24/2017 | 12/12/2017 | | DONE |
|
|
|
sent in mail 12-13-17
|
First Notice | | 10/23/2017 | 11/14/2017 | | DONE |
|
|
|
Mailed 11-15-17
|
Print Occupancy Form | | | 10/13/2017 | | DONE |
|
|
|
|
Permanent Occupancy | | | 10/13/2017 | | DONE |
|
|
|
|
FIRE-Final Inspection | 10/11/2017 | 10/12/2017 | 10/11/2017 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
Tim Phone #: ###-####
|
FIRE-Final Inspection | 9/14/2017 | 9/15/2017 | 9/15/2017 | A | CANC |
Troy Cobbley
|
|
|
Opticon was non-functional.
Tim Sanders Phone #: ###-####
|
PubWorks Occupancy Approval | 9/14/2017 | 9/14/2017 | 9/14/2017 | | DONE |
Mike Sheppard
|
|
|
|
Print Occupancy Form | | | 9/14/2017 | | DONE |
|
|
|
|
Zoning Approval | 9/12/2017 | 9/12/2017 | 9/12/2017 | | DONE |
Andrea Tuning
|
|
|
|
BLD-Final | 7/12/2017 | 7/13/2017 | 7/13/2017 | P | PASS |
Mike Jordan
|
|
|
Zoning hasn''t signed off yet // Amber Phone #: ###-####. All issues resolved. Will be ok for perm occ. once zoning signs perm.
|
BLD-Final | 6/23/2017 | 6/26/2017 | 6/26/2017 | A | PART |
Mike Jordan
|
|
|
Tim Sanders Phone #: ###-####. Provide ADA hardware on pocket door on restroom door. Provide single action on offfice door hardware and server room door. ok for temp occ.
|
FIRE-Final Inspection | 6/23/2017 | 6/23/2017 | 6/23/2017 | P | PASS |
Jim Page
|
|
|
Final inspection for fire life safety passed/complete
|
FIRE-Final Inspection | 6/20/2017 | 6/21/2017 | 6/21/2017 | P | PART |
Jim Page
|
|
|
No fire sprinklers, no fire alarms, emergency lighting operational to include exit discharge, property has knox box installed by main entry of office, thumbturn deadbolt between storage untis and office removed at time of inspection. Signage will be installed over main entry reading "Door to remain unlocked while occupied". Partial final inspection complete for life fire safety, last remaining item is the opticon system for vehicle gate, life fire safety can be finaled after the responding fire station tests the opticon system for correct operation.
|
PubWorks Occupancy Approval | 6/21/2017 | 6/21/2017 | 6/21/2017 | | DONE |
Tiffany Lowery
|
|
|
|
PubWorks Temp Occupancy Appr | 5/9/2017 | 5/9/2017 | 5/9/2017 | | DONE |
Tiffany Lowery
|
|
|
|
Print Occupancy Form | | | 5/4/2017 | | DONE |
|
|
|
|
Telephone call | | | 5/1/2017 | | DONE |
|
|
|
Twin Cities Ele called-they pulled 1 permit for all 8 bldg permits-i gave her Rita's email address for a refund because they will need to create 7 more ele permits for each b. permit and add in the valuation for each. I gave her each of the bldg permits as bldg numbers
|
BLD-Energy code compliance | 3/23/2017 | 3/24/2017 | 3/24/2017 | A | PASS |
Mike Jordan
|
|
|
would like call ahead; Jay Phone #: ###-####
|
BLD-Framing/Rough-in | 3/24/2017 | 3/24/2017 | 3/24/2017 | A | PASS |
Mike Jordan
|
|
|
would like call ahead; Jay Phone #: ###-####
|
BLD-Framing/Rough-in | 3/16/2017 | 3/16/2017 | 3/16/2017 | P | PART |
Mike Jordan
|
|
|
Jay Phone #: ###-####. Ok to insulate. Install the missing lateral brace on B6 truss, Install the straps on the 2ply girder truss as shown and install the draft stop. Provide city set of approved plans.
|
BLD-Wall Bracing | 3/16/2017 | 3/16/2017 | 3/16/2017 | P | PASS |
Mike Jordan
|
|
|
Jay Phone #: ###-####. Interior wall bracing ok. All holdowns ok. All previous missing holdowns installed, reviewed special inspection report, ok.
|
BLD-Wall Bracing | 2/28/2017 | 3/1/2017 | 3/1/2017 | P | PASS |
Mike Jordan
|
|
|
Jay Phone #: ###-####. Exterior wall bracing only ok.
|
BLD-Wall Bracing | 2/23/2017 | 2/24/2017 | 2/24/2017 | A | FAIL |
Mike Jordan
|
|
|
Jay Phone #: ###-####. Provide staple conversion. Install all holdowns, missing blocking and fasten all missed areas. Correction notice posted.
|
BLD-Foundation | 9/22/2016 | 9/22/2016 | 9/22/2016 | P | PART |
Mike Jordan
|
|
|
Jason-pour time 4:00 Phone #: ###-####. Work in progress. Specia inspector wil be on site.
|
BLD-Footing | 9/20/2016 | 9/21/2016 | 9/21/2016 | P | PART |
Mike Jordan
|
|
|
2:30 pour; Jason Phone #: ###-####. Work in progress on installing remaining verts. Special inspector on site.
|
Place hold on job | 8/17/2016 | | 8/19/2016 | | DONE |
Kristal Soland
|
|
|
DO NOT ISSUE WITHOUT BLD16-01617, BLD16-02948 TO BLD16-02954
|
Issue PAID IN FULL permit | | | 8/19/2016 | | DONE |
|
|
|
|
Telephone call | | | 8/18/2016 | | DONE |
|
|
|
notified customer that permit is ready
|
OVERRIDE | | | 8/17/2016 | | |
|
|
|
|
Plan assigned to (AJS) | 8/11/2016 | 8/11/2016 | 8/17/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Case Summary (BLD) | | | 8/17/2016 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/17/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/17/2016 | | DONE |
|
|
|
Needs; RP, GC Form, Revised Cert
**ACHD Fee are all with BLD16-01617**
|
Print Occupancy Form | | | 8/17/2016 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 5/9/2016 | | 8/17/2016 | | DEFR |
Tim L. Woodard
|
|
|
1st review completed.
|
Routing Off Site - STRUCTURAL | 7/22/2016 | | 8/16/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLANNING | 5/27/2016 | | 8/15/2016 | | PASS |
Josh Wilson
|
|
|
|
Routing - Design Review | 5/27/2016 | | 8/15/2016 | | PASS |
Josh Wilson
|
|
|
|
Routing - PLAN CHECK | 7/12/2016 | | 8/11/2016 | | PASS |
Tim L. Woodard
|
|
|
Tim signed off on approved drawings, see signature on cover sheet
|
Plan resubmittals received | | | 8/11/2016 | | DONE |
|
|
|
Three copies of Engineering, Three copies of sheets Title page, RCD-AF1, AF2, A1.1, A1.2, A1.3, A1.4, A2.1, A2.2, A2.3, BF1, BF2, B1.1, B1.2, B1.3, B1.4, B2.2, B2.3, CF1, CF2, C1.1, C1.2, C1.3, C1.4, C2.1, C2.2, C2.3, DF1, DF2, D1.1, D1.2, D1.3, D1.4, D2.1, D2.2, D2.3, EF1, EF2, E1.1, E1.2, E1.3, E1.4, E2.1, E2.2, E2.3, FF1, FF2, F1.1, F1.2, F2.1, F2.2, and 011. Two taken to Adele and One sent to off site engineering
|
Routing - FIRE | 7/25/2016 | 7/25/2016 | 7/25/2016 | | PASS |
Katie Marron
|
|
|
Revised report attached to plans.
|
Plan resubmittals received | | | 7/21/2016 | | DONE |
|
|
|
received letter, 4 copies of sheet 5 of 5, and sheet A-2.0- customer put in plans- gave to Tim
|
Routing - FIRE | 7/14/2016 | | 7/18/2016 | | FAIL |
Katie Marron
|
|
|
Report attached to plans and emailed to architect.
|
Plan resubmittals requested | | | 7/12/2016 | | |
|
|
|
Four copies of Final Stuctural Calculations Foundation, four copies Final Structural Calculations Building, Four copies of sheets S1.0, S2.2.1, S2.2.2, S2.3.1, S2.3.2, S2.4.1, S2.4.1 and S2.5.1, Four copies of sheets Title page, RCD-AF1, RCD-AF2, RCD-A1.1, RCD-A1.2, A1.3, A1.4, A2.1, A2.2, A2.3, RCD-BF1,BF2, B1.1, B1.2, B1.3, B1.4, B2.2, B2.3, RCD-CF1, CF2, C1.1, C1.2, C1.3, C1.4, C2.1, C2.2, C2.3, RCD-DF1, DF2, D1.1, D1.2, D1.3, D1.4, D2.1, D2.2, D2.3, RCD-EF1, EF2, E1.1, E1.2, E1.3, E1.4, E2.1, E2.2, E2.3, RCD-FF1, FF2, F1.1, F1.2, F2.1, F2.2, RCD-011. Taken to Tim W
|
1st review completed | | | 6/13/2016 | | DEFR |
|
|
|
Waiting on the remaining building plans. TLW
|
Routing - PLAN CHECK | 6/9/2016 | | 6/13/2016 | | FAIL |
Tim L. Woodard
|
|
|
Waiting on plans for all buildings on the site. Architect was going to drop them off prior to this review proceeding. TLW
|
Routing Off Site - STRUCTURAL | 5/9/2016 | | 6/13/2016 | | FAIL |
Tim L. Woodard
|
|
|
Emailed corrections. TLW
|
Routing PW Drainage | 6/8/2016 | | 6/9/2016 | | PASS |
Brian McGowan
|
|
|
|
Routing - PUBLIC WORKS | 6/9/2016 | | 6/9/2016 | | PASS |
Rachael Beierle
|
|
|
|
Plan resubmittals received | | | 6/8/2016 | | DONE |
|
|
|
received O&M agreement and routed to Brian Murphy
|
Routing - Erosion and Sediment | 5/24/2016 | | 5/27/2016 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. RP to be designted when contractor is selected.
|
Routing - PLUMBING | | | 5/27/2016 | | PASS |
|
|
|
1) provide asse1070 mixing valve at the lav.
2) per plans and ISPC
|
Routing PW Solid Waste | 5/24/2016 | | 5/24/2016 | | PASS |
Peter J. McCullough
|
|
|
|
Routing - PUBLIC WORKS | 5/10/2016 | | 5/24/2016 | | FAIL |
Rachael Beierle
|
|
|
See BGM in Drainage for details.
|
Routing PW Sewer Design | 5/23/2016 | | 5/24/2016 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing PW Drainage | 5/10/2016 | | 5/20/2016 | | FAIL |
Brian Murphy
|
|
|
needs o and m agreement geotech drainage report
|
Routing PW Street Lights | 5/10/2016 | | 5/10/2016 | | PASS |
Tom Marshall
|
|
|
|
Routing PW Sewer Rating | 5/10/2016 | | 5/10/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - PLANNING Land Div | 5/9/2016 | | 5/10/2016 | | PASS |
Todd Tucker
|
|
|
|
Routing - Addressing | 5/10/2016 | | 5/10/2016 | | PASS |
Laura Hunter
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/9/2016 | | DONE |
|
|
|
|
Intake Approval | | | 5/9/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/9/2016 | | DONE |
|
|
|
|
Application received | | 5/9/2016 | | | |
|
|
|
|