Second Notice | | 3/19/2017 | 4/11/2017 | | DONE |
|
|
|
Mailed 4-12-17
|
First Notice | 2/24/2017 | 2/24/2017 | 3/9/2017 | | DONE |
Mike Jordan
|
|
|
Mailed 3-10-17
|
BLD-Final | 2/23/2017 | 2/24/2017 | 2/24/2017 | P | PASS |
Mike Jordan
|
|
|
Mark Phone #: ###-####
|
DOC - Permit Finaled | 2/24/2017 | 2/24/2017 | 2/24/2017 | P | PASS |
Mike Jordan
|
|
|
|
FIRE-Final Inspection | 2/23/2017 | 2/24/2017 | 2/24/2017 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
CHANGE STATUS TO (ISS) | | | 12/19/2016 | | DONE |
|
|
|
plan mod fees paid
|
OVERRIDE | | | 12/15/2016 | | |
|
|
|
|
Plan assigned to (AJS) | 10/31/2016 | 10/31/2016 | 12/15/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
failed structural
|
Routing Off Site - STRUCTURAL | 12/15/2016 | | 12/15/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 12/15/2016 | | 12/15/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/15/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/15/2016 | | DONE |
Christina Prado
|
|
|
All requirements met for Plan Mod
DO NOT RE-ISSUE - All fees must be paid in full prior to changing status to ISS
|
Routing Off Site - STRUCTURAL | 12/13/2016 | | 12/13/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
The resubmitted calculation for building F (indicated in the FC carport) still shows the larger sizes. And the drawings didn''t change from the previous submittal with a different framing configuration than the calculations. Please provide a written response to the original comment and provide any additional information to support the response to the original comment.
|
Routing Off Site - STRUCTURAL | 11/29/2016 | | 12/7/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 11/29/2016 | | 12/7/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
pending structural approval
|
Routing - FIRE | 11/29/2016 | 11/29/2016 | 12/1/2016 | | PASS |
Katie Marron
|
|
|
No comments required.
|
Routing - Design Review | 11/29/2016 | | 12/1/2016 | | PASS |
Josh Wilson
|
|
|
|
Plan Modification Accepted | | | 10/31/2016 | | DONE |
|
|
|
modifications for ADA access
|
Telephone call | | | 9/28/2016 | | DONE |
|
|
|
emailed Carrie Van Houten the fees due amount
|
Issue PAID IN FULL permit | | | 9/28/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 9/27/2016 | | |
|
|
|
|
Plan assigned to (AJS) | 8/24/2016 | 8/24/2016 | 9/27/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Good Samaritan Carport 1st review completed by Tim
|
Routing - PLAN CHECK | 9/27/2016 | | 9/27/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/27/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/27/2016 | | DONE |
|
|
|
***MET***Need Letter from ACHD, RP, GC Form and Revised Cert of Value
|
Routing - PLANNING Land Div | 9/26/2016 | | 9/26/2016 | | PASS |
Todd Tucker
|
|
|
|
Plan assigned to (TLW) | 6/17/2016 | | 8/24/2016 | | DEFR |
Tim L. Woodard
|
|
|
1st review completed.
|
1st review completed | | | 7/8/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/17/2016 | | 7/8/2016 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing - Design Review | 6/17/2016 | | 6/23/2016 | | PASS |
Josh Wilson
|
|
|
|
Routing PW Drainage | 6/20/2016 | | 6/20/2016 | | PASS |
Brian Murphy
|
|
|
|
Routing - Addressing | 6/17/2016 | | 6/20/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 6/17/2016 | | 6/20/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - FIRE | 6/17/2016 | 6/17/2016 | 6/17/2016 | | PASS |
Katie Marron
|
|
|
Reviewed for FD Access. No comments required. Same as BLD16-01721
|
Intake Approval | | | 6/17/2016 | | PASS |
|
|
|
|
Pending Assignment by TLW | 6/17/2016 | | 6/17/2016 | | DONE |
Tim L. Woodard
|
|
|
|
Intake Approval | | | 5/13/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
1-Please upload the drawings individually. The structural drawings are in a package.
2- Please complete and upload the 304 document for the design professional of record.
3-Please have the engineer or record complete the 310 special inspection form for the welding shown on the drawings.
4-Please upload your approval from planning and zoning design review.
5-Just and FYI that the letter you submitted for the lot line issue will be reviewed to determine if additional documentation will be required. Most likely you will have to record an agreement on both parcels. Please work with the assigned plans examiner once the remaining documents have been received and your project is under review.
|
Application received | | | 5/9/2016 | | DONE |
|
|
|
Application submitted via PDS Online on May 9 2016 3:47PM
|
Routing Off Site - STRUCTURAL | 12/13/2016 | | | | |
Adele J Schaffeld-Griffin
|
|
|
|