BLD-Aging Inspection | 12/8/2016 | 12/8/2016 | 12/12/2016 | | PEND |
Dave Hannah
|
|
|
|
BLD-Foundation | 7/26/2016 | 7/27/2016 | 7/27/2016 | A | PASS |
Dave Hannah
|
|
|
Change day and time per Corwin-wall Phone #: ###-####
|
BLD-Foundation | 7/19/2016 | 7/19/2016 | 7/20/2016 | P | PASS |
Dave Hannah
|
|
|
Corwin Phone #: ###-####
|
BLD-Footing | 7/14/2016 | 7/15/2016 | 7/15/2016 | P | PASS |
Jim Storey
|
|
|
Corwen Phone #: ###-####rat slab
|
BLD-Conference | 7/14/2016 | 7/14/2016 | 7/14/2016 | P | PASS |
Dave Hannah
|
|
|
Corwen Phone #: ###-####
|
Issue PAID IN FULL permit | | | 7/12/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/12/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 6/20/2016 | | |
|
|
|
|
Plan assigned to (TLW) | 5/11/2016 | | 6/20/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 5/11/2016 | | 6/20/2016 | | PASS |
Tim L. Woodard
|
|
|
Approved with redlines on drawings. TLW
|
Routing PW Street Lights | 5/16/2016 | | 6/20/2016 | | CANC |
Tom Marshall
|
|
|
No Review Required / as per E-Plan Activity. TLW
|
1st review completed | | | 6/20/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/20/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/20/2016 | | DONE |
|
|
|
NEED GC and rev cert of val-as per TLW-no park fees required
|
Routing PW Flood Plain | 5/16/2016 | | 6/1/2016 | | PASS |
Jim Wyllie
|
|
|
Project is not located in the floodplain. Floodplain requirements are not applicable.
Jim Wyllie / ###-####
|
Routing PW Drainage | 5/16/2016 | | 5/16/2016 | | PASS |
Brian Murphy
|
|
|
node 350 sq ft
|
Routing - PUBLIC WORKS | 5/11/2016 | | 5/16/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - FIRE | 5/11/2016 | 5/11/2016 | 5/12/2016 | | PASS |
Katie Marron
|
|
|
Plans reviewed for FD Access and water availability. No comments required.
|
Routing - Erosion and Sediment | 5/11/2016 | | 5/12/2016 | | PASS |
Andy J. Long
|
|
|
ESC site plan and narrative approved. Parks and Rec RP will oversee sub-contractors.
|
Routing - Addressing | 5/11/2016 | | 5/12/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - Design Review | 5/11/2016 | | 5/12/2016 | | PASS |
Sarah Schafer
|
|
|
Double Check......A-1 zone don't think they need anything. TLW
No design review required. Project approved through Design Review.
|
Intake Approval | | | 5/11/2016 | | PASS |
|
|
|
|
Pending Assignment by TLW | 5/11/2016 | | 5/11/2016 | | DONE |
Tim L. Woodard
|
|
|
|
Application received | | | 5/10/2016 | | DONE |
|
|
|
Application submitted via PDS Online on May 10 2016 3:30PM
|