Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD16-01713
StatusFinaled
Name RMH COMPANY
Site Address 1101 W RIVER ST
Project NameGolden Eagle - Rstrm/Lobby
Customer Number 
ePlanReviewYes
Description
(GOLDEN EAGLE BUILDING - FORREST RIVER VIII – RESTROOM/LOBBY REMODEL) Permit is to remodel the main floor lobby area and the core restrooms on all three stories within the 42,673 sq. ft. existing three story building. This permit is approved contingent upon adhering to the approved plans on file. Work to include: @ 1st floor new ADA Hi/Lo accessible drinking fountain, modify toilet compartments to add an ADA wheelchair accessible water closet, modify millwork, new wall covering at lobby, electrical work, plumbing work; @ 2nd floor new ADA Hi/Lo accessible drinking fountain, modify door swing at ADA wheelchair accessible water closet, electrical work, plumbing work; @ 3rd floor new ADA Hi/Lo accessible drinking fountain, modify toilet compartments to add an ADA wheelchair accessible water closet, modify millwork, electrical work, plumbing work. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 10/15/201610/17/2016 DONE
This permit finaled on the web by Amy Wray
Second Notice 9/23/201610/10/2016 DONE
mailed 10-11-16
Letter of compliance/Occupancy  9/22/2016 DONE
Letter of compliance/Occupancy  9/22/2016 DONE
First Notice9/1/20169/1/20169/13/2016 DONE
DetailsCandy A. Nichols
BLD-Final8/31/20169/1/20169/1/2016PPASS
DetailsDave Hannah
Doug Phone #: ###-####
DOC - Permit Finaled9/1/20169/1/20169/1/2016PPASS
DetailsDave Hannah
FIRE-Final Inspection8/31/20169/1/20169/1/2016APASS
DetailsJim Page
Fire sprinkler inspection complete, no modifications to fire alarm system, fire extinguishers are in place with current inspection tags. Final life fire safety inspection passed/complete.
BLD-Final6/7/20166/8/20166/8/2016PNR
DetailsTony Young
Doug Phone #: ###-####
FIRE-Final Inspection6/7/20166/8/20166/8/2016APART
DetailsJim Page
Project being worked in phases, phase 1 (Level 3 lobby/restrooms) restrooms are comlete, exit signs were being replaced at time of inspection, will verify exit sign placement during inspection for level 2. Fire sprinklers complete for level 3, no fire alarm modifications, fire extinguisher in place with current inspection tag. Final life fire safety inspection complete for level 3.
BLD-Framing/Rough-in5/24/20165/24/20165/25/2016PPART
DetailsDave Hannah
Doug Phone #: ###-#### third floor ok to cover lobby ceilings
Issue PAID IN FULL permit  5/23/2016 DONE
Inspection Record Card- Bld  5/23/2016 DONE
Plan assigned to (JG)5/17/20165/17/20165/20/2016 PASS
DetailsJavier Guzman
5/23 L1 Golden Eagle Lobby Facelift ePlan
Routing - PLAN CHECK5/17/2016 5/20/2016 PASS
DetailsJavier Guzman
1st review completed  5/20/2016 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  5/20/2016 DONE
Permit Ready to Issue  5/20/2016 DONE
NEED GC form and Certificate of value
Routing - Addressing5/17/2016 5/19/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS5/17/2016 5/17/2016 PASS
DetailsRachael Beierle
Intake Approval  5/17/2016 PASS
DetailsJavier Guzman
Application received  5/12/2016 DONE
Application submitted via PDS Online on May 12 2016 1:28PM
Intake Approval  5/12/2016 FAIL
DetailsDavid Ferguson
Need sheet index on cover page.