First Notice | | 12/29/2016 | 12/20/2016 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 12/19/2016 | | DONE |
|
|
|
|
Permanent Occupancy | | | 12/19/2016 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 12/8/2016 | 12/12/2016 | 12/13/2016 | P | PASS |
Tony Young
|
|
|
Jesse Phone #: ###-####
|
FIRE-Final Inspection | 12/8/2016 | 12/12/2016 | 12/12/2016 | A | PASS |
Jim Page
|
|
|
No fire sprinklers, no fire alarms, final life fire safety inspection passed/complete.
|
FIRE-Final Inspection | 12/8/2016 | 12/12/2016 | 12/12/2016 | P | CANC |
Jim Page
|
|
|
Jesse Phone #: ###-####
|
Issue PAID IN FULL permit | | | 7/14/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/14/2016 | | DONE |
|
|
|
|
Plan assigned to (CDM) | 6/6/2016 | 6/6/2016 | 7/6/2016 | | PASS |
Carl D Madsen
|
|
|
First review completed
|
Routing - PLAN CHECK | 7/6/2016 | | 7/6/2016 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/6/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/6/2016 | | DONE |
Christina Prado
|
|
|
All requirements met 7/8/16 C_P
**No ACHD needed see letter**Need ACHD, GC Form & Revised Certificate of value for issuance
|
Routing - PLAN CHECK | 6/27/2016 | | 6/27/2016 | | FAIL |
Carl D Madsen
|
|
|
Need valad registered design professional form.
|
Routing PW Sewer Design | 6/24/2016 | | 6/24/2016 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing - PUBLIC WORKS | 6/24/2016 | | 6/24/2016 | | PASS |
Rachael Beierle
|
|
|
|
Route to Impact Fee Review | 6/16/2016 | 6/19/2016 | 6/21/2016 | | PASS |
Cindy M. Gould
|
|
|
Under threshold no impact fees for building
|
Routing - PLAN CHECK | 6/6/2016 | | 6/16/2016 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - PLANNING Land Div | 6/6/2016 | | 6/16/2016 | | PASS |
Carl D Madsen
|
|
|
Per e-plan
|
Routing PW Sewer Design | 6/7/2016 | | 6/16/2016 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Update Utility Plan to show the 2012 sewer service extension into property.
|
Routing PW Solid Waste | 6/7/2016 | | 6/16/2016 | | PASS |
Peter J. McCullough
|
|
|
|
Routing PW Grading-Hillside | 6/7/2016 | | 6/16/2016 | | PASS |
Jason C. Taylor
|
|
|
|
1st review completed | | | 6/16/2016 | | FAIL |
|
|
|
|
Routing - PLUMBING | 6/6/2016 | | 6/8/2016 | | PASS |
Daryl Spivey
|
|
|
1) provide Suez water required DCVA upstream of blowout tee and downstream of shutoff valve.
2) provide drain valve for winterization.
|
Routing - FIRE | 6/6/2016 | 6/6/2016 | 6/7/2016 | | PASS |
Katie Marron
|
|
|
No comments required.
|
Routing PW Drainage | 6/7/2016 | | 6/7/2016 | | PASS |
Brian Murphy
|
|
|
grading plan approved by jason taylor
|
Routing PW Street Lights | 6/7/2016 | | 6/7/2016 | | PASS |
Tom Marshall
|
|
|
|
Routing - Addressing | 6/6/2016 | | 6/7/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 6/6/2016 | | 6/7/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 6/6/2016 | | 6/7/2016 | | CANC |
Evan Jenkins
|
|
|
ESC permit already issued for this site. Same contractor. See ESC16-00175. No need for duplicate ESC permit. Same ESC plan submitted for early permit re-submitted
|
Routing - MECHANICAL | 6/6/2016 | | 6/7/2016 | | PASS |
Troy James
|
|
|
|
Routing - Design Review | 6/6/2016 | | 6/7/2016 | | PASS |
Sarah Schafer
|
|
|
No design review required. Addition of restroom facility is appropriate for the park under zoning code.
|
Intake Approval | | | 6/6/2016 | | PASS |
|
|
|
|
Pending Assignment by TLW | 6/6/2016 | | 6/6/2016 | | DONE |
Tim L. Woodard
|
|
|
|
Intake Approval | | | 5/16/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
1- Please upload all of the drawings to meet our electronic submittal standards.
Each sheet must be uploaded individually.
Each sheet shall be named to meet conventional naming standards
Each sheet shall be a min 18x24 in size
2-The modular building shall have the approval stamp by the State of Idaho Division Of Building Safety.
3-The foundation shall meet min frost depth requirements or meet the shallow foundation requirements (insulated).
|
Application received | | | 5/13/2016 | | DONE |
|
|
|
Application submitted via PDS Online on May 13 2016 9:40AM
|