Permit Information
Permit NumberBLD16-01757
StatusFinaled
Name STACK CONSTRUCTION
Site Address 6000 W DENTON ST
Project NameCascadia Healthcare SNF
Customer Number 
ePlanReviewYes
Description
(CASCADIA HEALTHCARE SNF - SKILLED NURSING FACILITY – 100 BEDS) (DRH16-00057 / CUP16-00011) (1-18-17 PLAN MODIFICATION TO CHANGE THE FROST DEPTH TO 24 INCHES, TO CHANGE THE SOIL BEARING CAPACITY TO 2,000 PSF, TO REVISE A FEW HEADER SIZES, AND TO REVISE THE DESIGN FOR THE COVERED ENTRY. CJW) Fire sprinkler system used for building area increase and for occupancy. To construct (3) three, one story buildings connected by pedestrian walkways. The total floor area is about 55,643 square feet (20,739 square feet Building 200, 17,172 square feet Building 100, and 17,732 square feet Building 300). Work is to include concrete footings, concrete foundations, concrete slabs on grade, wood stud exterior bearing and shear walls, wood stud interior bearing and shear walls, engineered wood roof trusses, continuous rigid insulation installed on top of the roof decks, a cantilevered roof at a passenger loading zone, exterior wall finishes, suspended acoustical ceilings, interior doors, millwork, interior finishes, smoke partition corridors, 1-hr. smoke barrier walls, 60 minute accordion-type fire doors, 60 patient sleeping rooms accessible to the disabled, accessible restrooms, a commercial kitchen, exterior doors, and exterior windows. The commercial kitchen includes a grease hood (Type I) and duct system, a make-up air unit to serve the grease hood, a dishwasher hood (Type II) and duct system, and a 1,500 gallon grease interceptor. An emergency generator will serve these buildings and will be installed within an exterior CMU enclosure open to the sky. Special Inspections are required for soils, concrete, post-installed anchors, and welding. The design for the metal awnings and the roof trusses are deferred submittal items. The work is required to comply with the approved drawings, with the plan review report, with the structural design, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  11/23/2018 DONE
sent 1st late notice
Print Statement  8/14/2018 DONE
Third Notice 7/16/20188/7/2018 DONE
mailed 7-10-18
Second Notice 6/21/20187/11/2018 DONE
mailed 7-12-18
First Notice 5/25/20186/11/2018 DONE
mailed 6-12
Permanent Occupancy  5/15/2018 DONE
BLD-Final5/1/20185/1/20185/1/2018PPASS
DetailsMike Jordan
Steve Phone #: ###-####. All issues have been resolved. Ok for perm. occ.
BLD-Framing/Rough-in4/30/20184/30/20184/30/2018PCANC
DetailsMike Jordan
Steve Phone #: ###-####
BLD-Final4/30/20184/30/20184/30/2018PPART
DetailsMike Jordan
Steve Phone #: ###-####. All issues have been resolved except for protection of sleeves in 1hr. roof/ceiling assembly above coolers.
Temporary Occupancy4/19/20187/18/20184/19/2018 DONE
DetailsTisha Gallop
Permanent certificate of occupancy pending approval by structural.
BLD-Conference4/4/20184/4/20184/4/2018ADONE
DetailsMike Jordan
Request for Michael Jordan to visit the job site to discuss outstanding items. Phone #: ###-#### Inspection requested via web by Steve Jacobsen. Discussed 3M duct wrap EJ with contractor on wrapping the solar light tubes and duct for med gas room ventilation. Noted to contractor to send EJ to building official for approval.
FIRE-Final Inspection3/9/20183/12/20183/12/2018PPASS
DetailsJim Page
Delayed egress doors tested and verified for proper operation. Final life fire safety inspection complete.
Zoning Approval3/1/20183/1/20183/1/2018 DONE
DetailsAndrea Tuning
BLD-Final3/1/20183/1/20183/1/2018PPART
DetailsMike Jordan
Ok for temp occupancy only.
BLD-Framing/Rough-in2/22/20182/23/20182/23/2018APART
DetailsMike Jordan
Nathan Phone #: ###-####. Bldg #100 Missing fire dampers at 1hr ceiling at rooms 117 and 126. Rooms 148 and 150 need 45 min doors., protec penetrations at 1hr. ceiling above coolors. provide 1hr. shaft in attic for gas room ventilation in room 131. Also noted solar light tubes installed in conferance room, not on approved plans. Architect to provide details on how to protect the opening in the 1hr. ceiling assembly. Will be ok for temp occ. once a bond has been posted for zoning to allow the state to start conducting their inspections and for building owner to move furniture in ONLY.
FIRE-Final Inspection2/23/20182/23/20182/23/2018PPART
DetailsTroy Cobbley
A temporary for the life safety is being given to provide access for State Of Idaho certification. If cooking or training is to be started Scott Arellano is to be contacted for approval. For a final sign off I need the delayed egress doors tested, the project related fire alarm permit finaled and the exit discharge lighting issues approved as discussed.


Steve Phone #: ###-####
BLD-Final2/21/20182/22/20182/22/2018AFAIL
DetailsMike Jordan
did not want to schedule fire life & safety and understood fir permit failed inspection /// Nathan Phone #: ###-####. Bldg #300. Doors 302,303,304 to be 45 min. with self closer and smoke seals. Protect through penetrations in data room 322. No fire dampers in ceilings in rooms 307, 310 and 325. Bldg 200, doors at rooms 211, 212 and 213 to be 45 min., self closing with smoke seals and sweeps.
BLD-Final2/20/20182/21/20182/21/2018AFAIL
DetailsMike Jordan
Steve Phone #: ###-####. Bldg 200 only walk through. Needs to install all mirrors. Doors 204,210, 226 and 211 are required to be min. 45 min rated, they are not. Also need to verify slopes on sides to bldg 200, west side.
FIRE-Final Inspection2/21/20182/21/20182/21/2018PFAIL
DetailsTroy Cobbley
Need the exit discharge lighting issue resolved, need to test the Delay Egress Doors, need smoke damper actuation tested and shown on the fire alarm plans. See the mechanical sheets for locations of the fire/smoke dampers.
FIRE-Alarm Testing2/19/20182/21/20182/21/2018ACANC
DetailsTroy Cobbley
continued phased inspection of alarms Phone #: ###-#### Inspection requested via web by Steve Jacobsen
Meeting  2/21/2018 DONE
DetailsScott Arellano
Met with life safety field inspector to discuss Fire Smoke Damper installation in building sections 200 & 300. Informed all inspection personnel and mechanical contractor of the 9 F/S dampers to be installed. Fire Alarm subcontractor has also been contacted.
FIRE-Alarm Testing2/19/20182/20/20182/20/2018ACANC
DetailsTroy Cobbley
continued phased inspection of alarms Phone #: ###-#### Inspection requested via web by Steve Jacobsen
PubWorks Occupancy Approval2/14/20182/14/20182/14/2018 DONE
DetailsTiffany Lowery
FIRE-Final Inspection2/9/20182/12/20182/12/2018AFAIL
DetailsTroy Cobbley
Project is not ready for a final yet. Todays inspection was just to verify that the exit signs, emergency lights and exit discharge lights functioned on emergency generator. I noted that the exit discharge lights have been connected to photo cells for control. I have contacted plan review since I do not see this allowed in the Code.

Steve Phone #: ###-####
FIRE-Conference1/29/20181/29/20181/30/2018PDONE
DetailsTroy Cobbley
I went over life safety requirements with Steve which included the medical gas rooms. Per the electrician the exit discharge lights are controled by a photo cell. Per Chapter 10 of the IFC no allowance is made for this or timers.

Steve Phone #: ###-####
BLD-Ceiling Grid Inspection1/16/20181/16/20181/16/2018PPASS
DetailsMike Jordan
Nathan Phone #: ###-####. Building #300.
BLD-Ceiling Grid Inspection12/12/201712/12/201712/12/2017PPASS
DetailsMike Jordan
Nate Phone #: ###-####. Building 100 ceiling grid ok.
BLD-Ceiling Grid Inspection12/7/201712/7/201712/7/2017APASS
DetailsMike Jordan
Building 200 ceiling grid ok.
BLD-Ceiling Grid Inspection12/6/201712/7/201712/7/2017APART
DetailsMike Jordan
Nathan Phone #: ###-####. Wrong inspection entered. rescheduled.
BLD-Ceiling Grid Inspection11/16/201711/16/201711/17/2017PCANC
DetailsMike Jordan
building 200- Steve Phone #: ###-####
BLD-Ceiling Grid Inspection11/16/201711/17/201711/17/2017APASS
DetailsMike Jordan
ceiling grid in bldg. 200 ok.
BLD-Framing/Rough-in10/18/201710/19/201710/19/2017APASS
DetailsMike Jordan
Nathan Phone #: ###-####. south half of building 300 ok to sheet rock.
BLD-Framing/Rough-in10/11/201710/12/201710/12/2017APART
DetailsMike Jordan
Nathan Phone #: ###-####. north rooms and lid ok to sheet rock.
BLD-Framing/Rough-in10/6/201710/9/201710/9/2017APASS
DetailsMike Jordan
Nathan Phone #: ###-####. Energy code inspection, exterior walls bldg. #300.
BLD-Framing/Rough-in10/6/201710/6/201710/6/2017PPART
DetailsMike Jordan
Nathan Phone #: ###-####. Framing for p.c.
BLD-Framing/Rough-in9/29/20179/29/20179/29/2017PPASS
DetailsMike Jordan
Nathan Phone #: ###-####. Exterior walls only ok, pending electrical rough in inspection.
BLD-Framing/Rough-in9/19/20179/20/20179/20/2017APASS
DetailsMike Jordan
Doug Phone #: ###-####. Ok to rock corridors ceilings and wall to plate line only. Also spoke to contractor about the possibilty of insulating that portion of wall above plate line prior to sheet rock.
BLD-Framing/Rough-in9/8/20179/11/20179/11/2017APART
DetailsDave Hannah
Nathan Phone #: ###-#### ok to cover walls bldg 100
BLD-Framing/Rough-in9/5/20179/5/20179/5/2017PPASS
DetailsMike Jordan
Steve Phone #: ###-####. Ok to rock remaining lids in bldg 100. Work in progress on insulation.
BLD-Energy code compliance8/29/20178/29/20178/29/2017PCANC
DetailsMike Jordan
Steve Phone #: ###-####
BLD-Framing/Rough-in8/29/20178/29/20178/29/2017PPART
DetailsMike Jordan
Steve Phone #: ###-####. building 100, ok to insualte north of first corridor only.
BLD-Framing/Rough-in8/25/20178/28/20178/28/2017APART
DetailsMike Jordan
Nathan Phone #: ###-####. Building 100 framing. Needs to complete airseal, complete all pre rock and fireblocking nd install all hatchannel.
BLD-Framing/Rough-in8/16/20178/16/20178/16/2017PPART
DetailsMike Jordan
Nathan Phone #: ###-####. Exterior shear on bldg 300 is now ok.
BLD-Framing/Rough-in8/10/20178/11/20178/11/2017APART
DetailsMike Jordan
Nathan Phone #: ###-####. North wing, bldg 200 ok. Wall bracing on bldg. 300 noted several areas missing blocking and fasteners.
BLD-Conference8/8/20178/9/20178/9/2017AFAIL
DetailsMike Jordan
Remove sheet rock from furred walls, nrth wing of building 200. Remove tyvek from exteriorof building 300 for bracing inspection. The tenmat listing provided for light protection in th 1 hr. ceiling is non compliant for this use. A corection notice was issued.
BLD-Framing/Rough-in8/8/20178/8/20178/8/2017PPASS
DetailsMike Jordan
Steve Phone #: ###-####. Ok to sheetrock corridor ceilings in bldg. 100. only.
BLD-Framing/Rough-in7/24/20177/25/20177/25/2017APASS
DetailsMike Jordan
Exterior shear and inteior shear walls on bldg. 100 ok. Smoke barrier above grid in bldg. 200 ok and at concealed areas. Roof ceiling assembly in concealed areas ok as well.
BLD-Energy code compliance7/24/20177/24/20177/24/2017PPASS
DetailsMike Jordan
Nathan Phone #: ###-####. Elelctrical room Bldg. 100 ok.
BLD-Framing/Rough-in7/21/20177/21/20177/21/2017PPASS
DetailsMike Jordan
Bldg. 100 roof ok toover.
BLD-Framing/Rough-in7/20/20177/21/20177/21/2017AFAIL
DetailsMike Jordan
Steve Phone #: ###-####. Complete all penetrations on smoke barrier wall. Remove rock from areas behind tubs on either side of smoke barrier walls and conplete ceiling assembly and rock those portions of smoke barrier.
BLD-Framing/Rough-in7/14/20177/14/20177/17/2017PPASS
DetailsMike Jordan
Steve Phone #: ###-####. Bldg 200 ok to sheet rock except for north wing.
BLD-Conference7/12/20177/12/20177/12/2017PCANC
DetailsMike Jordan
BLD-Framing/Rough-in7/12/20177/12/20177/12/2017PCANC
DetailsMike Jordan
Steve Jacobson Phone #: ###-####
BLD-Energy code compliance7/12/20177/12/20177/12/2017PPASS
DetailsMike Jordan
Steve Jacobson Phone #: ###-####. South and west exterior walls only on bldg.200 ok.
BLD-Framing/Rough-in7/12/20177/12/20177/12/2017APASS
DetailsMike Jordan
Bldg. 100 roof strapping was completed. Prevously noted missing straps not required per engineers site visit. South and west wings rooms ok.
BLD-Framing/Rough-in6/26/20176/27/20176/27/2017APART
DetailsMike Jordan
Roof nailing ok. Installing strapping when on site. Engineer to provide RFI for alternate connections on drag trusses.
BLD-Framing/Rough-in6/26/20176/26/20176/26/2017PNR
DetailsMike Jordan
Steve Phone #: ###-####. Roof for building 100, not ready.
BLD-Framing/Rough-in6/8/20176/9/20176/9/2017APART
DetailsDave Hannah
Steve Phone #: ###-#### south side of bldg 200 corradors ok to cover lids
BLD-Conference6/6/20176/6/20176/6/2017PDONE
DetailsMike Jordan
Reviewed alternate 1hr. details from architect for double walls to comply with the 1hr. wall requirements. Listed Assembly provided with addition of 2 layers of 5/8 type x rock above double top plates to keep continuity of 1hr. ceiling assembly.
BLD-Conference6/5/20176/5/20176/5/2017ADONE
DetailsMike Jordan
BLD-Conference6/1/20176/2/20176/2/2017ADONE
DetailsMike Jordan
Meeting with sub contractors on fire stopping requirements.
BLD-Wall Bracing5/22/20175/25/20175/25/2017APASS
DetailsMike Jordan
Bldg. 200 exterior shearwalls ok.
BLD-Framing/Rough-in5/19/20175/22/20175/22/2017APASS
DetailsMike Jordan
Bldg. 200 roof nailing ok. all straps in and completed. Also received RFI from engineer of record giving staple conversion for roof sheathing attachment.
BLD-Wall Bracing5/22/20175/22/20175/22/2017AFAIL
DetailsMike Jordan
Bldg. 200 exterior shear walls. Several areas missed. All missed areas were marked. Framer to fasten all missed areas.
BLD-Framing/Rough-in5/19/20175/19/20175/19/2017PCANC
DetailsMike Jordan
BLD-Framing/Rough-in5/18/20175/18/20175/18/2017PPEND
DetailsMike Jordan
Steve Phone #: ###-####. Roof nailing on bldg. 200. Used staples, plans call for 8d nails. Waiting for RFI from engineer.
(F) Reprint permit  4/24/2017 DONE
CHANGE STATUS TO (ISS)  4/24/2017 DONE
Plan Mod
Telephone call  4/19/2017 DONE
customer called for inspection but plan mod fees are due and have been due since 1/18/17-i told him berore and inspection can be done they need to come in and pick up plan mod
OVERRIDE  1/18/2017  
Plan assigned to (CJW)1/6/20171/6/20171/18/2017 PASS
DetailsCarl Westfall
plan mod
Routing - PLAN CHECK1/6/2017 1/18/2017 PASS
DetailsCarl Westfall
Routing Off Site - STRUCTURAL1/10/2017 1/18/2017 PASS
DetailsCarl Westfall
Jordan Terry KPFF
PLANS/APPL TAKEN TO FRONT DESK  1/18/2017 DONE
Permit Ready to Issue  1/18/2017 DONE
DO NOT RE ISSUE. PLAN MOD
Plan Modification Accepted  1/6/2017 DONE
DetailsChristina Prado
For structural revisions
BLD-Foundation12/6/201612/7/201612/7/2016PPASS
DetailsMike Jordan
Rebar // Steve Phone #: ###-####. Perimeter stemwalls for bldg. 100.
BLD-Footing12/1/201612/1/201612/1/2016PPART
DetailsMike Jordan
Steve-rebar Phone #: ###-####. Bldg.300 perimeter footings. Will have special inspection.
BLD-Footing11/22/201611/22/201611/22/2016PPART
DetailsMike Jordan
Steve Phone #: ###-####. Perimeter stemwalls and courtyards for bldg. 200. Perimeter footings for blg. 100 and garden area.
BLD-Footing11/15/201611/16/201611/16/2016PPART
DetailsMike Jordan
Steve Phone #: ###-####. Perimter footings and west courtyard footings for bldg. 200. Will have special inspection..
Issue PAID IN FULL permit  10/26/2016 DONE
Print Occupancy Form  10/26/2016 DONE
Expiration Notice10/19/201611/9/201610/19/2016 DONE
DetailsBrittany Hill
OVERRIDE  10/10/2016  
Route to Impact Fee Review9/8/20169/11/201610/10/2016 PASS
DetailsCindy M. Gould
Plan assigned to (CJW)8/1/20168/1/201610/10/2016 PASS
DetailsCarl Westfall
(1st done) (Aug 18 - 15 days) (Sept 8 - 30 days) St. Al's Skilled Nursing 100 beds
PLANS/APPL TAKEN TO FRONT DESK  10/10/2016 DONE
Permit Ready to Issue  10/10/2016 DONE
DetailsChristina Prado
***MET 10-25-16 CAN***NEED ACHD, alll other requirements met
Routing - PLAN CHECK10/3/2016 10/10/2016 PASS
DetailsCarl Westfall
(10-3-16) Waiting for the results of the 3rd structural review.

(10-10-16) Drawings approved
Routing Off Site - STRUCTURAL10/3/2016 10/7/2016 PASS
DetailsCarl Westfall
Jordan Terry KPFF
Plan resubmittals received  10/3/2016 DONE
received O&M agreement
Plan resubmittals received  10/3/2016 DONE
Routing - Design Review10/3/2016 10/3/2016 PASS
DetailsAndrea Tuning
Routing Off Site - C.D.H9/20/2016 9/28/2016 PASS
DetailsCarl Westfall
Brent Copes has 83709 - send to him
(9-28-16) Called Brent Copes. Left a voice message. Asked him to either pass it or fail it so the workflow can be sent back to the applicant.
Routing - PLAN CHECK9/19/2016 9/28/2016 PEND
DetailsCarl Westfall
Resubmittal review completed on 9-21-16. Waiting for the results of the 2nd structural review.
Routing Off Site - STRUCTURAL9/20/2016 9/28/2016 FAIL
DetailsCarl Westfall
Jordan Terry KPFF
Plan resubmittals requested  9/28/2016 DONE
Routing - Design Review9/20/2016 9/26/2016 FAIL
DetailsAndrea Tuning
Routing PW Solid Waste9/20/2016 9/26/2016 PASS
DetailsPeter J. McCullough
Routing - PLUMBING9/20/2016 9/22/2016 PASS
DetailsBill VanDegrift
per plans and ISPC
Routing PW Sewer Design9/20/2016 9/22/2016 PASS
DetailsKyle S. Rosenmeyer
Routing - MECHANICAL9/20/2016 9/21/2016 PASS
DetailsTroy James
Routing - FIRE9/20/2016 9/21/2016 PASS
DetailsKatie Marron
Revised report attached to case.
Plan resubmittals received  9/19/2016 DONE
Plan resubmittals requested  9/8/2016 DONE
1st review completed  9/8/2016 DONE
Routing - PLAN CHECK8/1/2016 9/8/2016 FAIL
DetailsCarl Westfall
1st IBC plan review done
Routing - PLANNING Land Div8/1/2016 8/31/2016 PASS
DetailsTodd Tucker
Routing PW Environmental8/2/2016 8/18/2016 PASS
DetailsRick Christenson
1500 Gallon Exterior Interceptor Shown
Routing Off Site - STRUCTURAL8/1/2016 8/16/2016 FAIL
DetailsCarl Westfall
Jordan Terry
Routing - MECHANICAL8/1/2016 8/16/2016 FAIL
DetailsTroy James
Routing PW Drainage8/2/2016 8/12/2016 PASS
DetailsBrian Murphy
Routing PW Sewer Design8/2/2016 8/10/2016 FAIL
DetailsKyle S. Rosenmeyer
Sewer installed but not yet accepted. Testing still needs to be completed and a letter of acceptance issued by the City prior to permitting connections.
Plan assigned to (AJS)8/1/20168/1/20168/5/2016 DEFR
DetailsAdele J Schaffeld-Griffin
Routing - FIRE8/1/20168/1/20168/2/2016 FAIL
DetailsKatie Marron
Report attached to case and emailed to architect.
Routing PW Solid Waste8/2/2016 8/2/2016 FAIL
DetailsPeter J. McCullough
Routing PW Street Lights8/2/2016 8/2/2016 PASS
DetailsTom Marshall
Approved with conditions
Routing - PUBLIC WORKS8/1/2016 8/2/2016 PASS
DetailsRachael Beierle
Routing - PLUMBING8/1/2016 8/2/2016 FAIL
DetailsDaryl Spivey
note-- cleanouts required on 2" piping below grade every 50'.
change mark-- provide sizing for the med gas system.
Routing - PLANNING8/1/2016 8/1/2016 PASS
DetailsCody Riddle
Parcel boundary issue already noted in DRH.
Pending Assignment by TLW8/1/2016 8/1/2016 DONE
DetailsTim L. Woodard
Routing - Erosion and Sediment8/1/2016 8/1/2016 PASS
DetailsEvan Jenkins
(Site Prep Inspection and approval required prior to earth disturbance)

100 bed skilled nursing facility
Routing - Design Review8/1/2016 8/1/2016 FAIL
DetailsAndrea Tuning
DRH16-00057 -
Parcel must match property lines proposed. (legal parcel)
Provide 3 bicycle parking spaces.
Widen planter island in northeast corner of the site to be 8-feet in width.
Routing - Addressing8/1/2016 8/1/2016 PASS
DetailsLaura Hunter
With new Subdivision and lot split, the address of facility had to change to 6000 W Denton St
Intake Approval  7/29/2016 PASS
Intake Approval  5/23/2016 FAIL
DetailsAdele J Schaffeld-Griffin
Please see mark ups on the check list for outstanding items.
Application received  5/16/2016 DONE
Application submitted via PDS Online on May 16 2016 4:28PM